Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹69,754.97Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹70,505.02+₹750.05 (1.08%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹74,255.29+₹4,500.32 (6.45%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹75,000
EMD Value
₹1,500
Closing Date
8 May 2026, 6:00 pmClosed
XEW REW UDHAMPUR
XEW REW UDHAMPUR
as per nit
2026_RDPR_308348_7
e-NIT No. 04 REW UDHAMPUR of 2026-27 Dated 16-04-2026
Open Tender
Civil Works
Percentage
30 days
Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹1,500
18 May 2026
22 Apr 2026
9 May 2026
22 Apr 2026
8 May 2026
22 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | - | cum | - | - |
| 2 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 | - | cum | - | - |
| 3 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 | - | cum | - | - |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete | - | Kg | - | - |
| 5 | Centering and shuttering including stru tting, propping etc. and removal of form work for: Suspended Floors | - | sqm | - | - |
| 6 | Centering and shuttering including stru tting, propping etc. and removal of form work for: Edges of Slabs | - | Rmt | - | - |
| 7 | Providing and Laying 15 mm thick cement plaster in 1:6 mix. | - | sqm | - | - |
| 8 | Carriage of Sand &AGGR | - | cum | - | - |
| 9 | Carriage of Bricks | - | NOS | - | - |
| 10 | Add cost of CIB | - | No. | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_999473.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .