Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.0 LAccepted-Finance | ₹4.0 L | 1 | Accepted-Finance BEING LOWEST |
| 2 | 2₹4.3 LRejected-Finance | ₹4.3 L | 2 | Rejected-Finance BEING NOT LOWEST |
| 3 | 3₹4.7 LRejected-Finance C O SHRI AMRENDER KUMAR YADAV IACHHIPUR SANTOSH NAGAR GORAKHNATH GORAKHPUR UTTAR PRADESH PIN 273015 | GORAKHPUR | UTTAR PRADESH | 273015 | ₹4.7 L | 3 | Rejected-Finance BEING NOT LOWEST |
Updated dates
Tender Value
₹6 L
EMD Value
₹12,000
Closing Date
25 May 2026, 6:00 pmClosed
GE(AF) GORAKHPUR
GE(AF) GORAKHPUR PINCODE- 273008
TERM CONTRACT FOR ARTIFICER WORK AT 4 AFSB VARANSI
2026_MES_762390_1
9442/E8
Open Tender
Miscellaneous Works
365 days
4 AFSB VARANSI
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE(AF) GORAKHPUR
₹12,000
Yes
12 Jun 2026
28 Apr 2026
27 May 2026
28 Apr 2026
25 May 2026
12 May 2026
28 Apr 2026 - 11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | To perform such services and execute such works upon the terms & conditions contained in or referred to in the Schedule 'A', Schedule 'B', MES Standard Schedule of Rates (SSR)-2009 (Part-I) - Specifications & MES Standard Schedule of Rates (SSR)-2020 (Part-II)-Rates, General Conditions of Contracts IAFW-2249, (1989 Print) and upon the conditions here-in-after contained as may be demanded and as are enumerated in the aforesaid MES Schedule for the period of one year from the date of acceptance at the rates contained in the aforesaid MES Schedule at the percentage quoted. Applicability of the SSR shall be as under: -
(a) MES SSR Part-I, 2009 (Specifications) together with the amendment No.1 to 3
(b) MES SSR Part -II, 2020 (Rates) alongwith amendments from 1 to 122.
Note:(i) Estimated rates inserted in Col (5) is base figure only to arrive at the quoted % above or below the SSR-2020 (Part-II).
(ii) Bidder can select Excess (+) or Less (-) option by selecting Column E4.
(iii) Irrespective of amount generated in BOQ template, the net contract sum shall be as shown in Appendix ‘A’ to Notice of Tender.
(iv) Total work orders amount (including quoted percentage above) will not increased from the estimated cost of work in NIT. | - | As per SSR Part II (2020) | 6,00,000 | - | BI01010001010000000000000515BI0100001113 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
tenderca04.pdf
Tender Documents • 1.29 MB
BOQ_853983.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid