Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-Finance 1 21 B8 KHADAR MEERAN NAGAR THERMAL NAGAR TUTICORIN | ₹8.5 L | L1 | Accepted-Finance BOQ Accepted |
| 2 | L2₹13.4 LAccepted-Finance | ₹13.4 L | L2 | Accepted-Finance BOQ Accepted |
| 3 | Rejected-Technical | - | - | Rejected-Technical BQR No.1 not accepted |
| Sl No | Description | Qty | Unit | A.K.B RAJA ENTERPRISES L1 | C.ABDULLA ENGINEERING CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for Inspection and giving clearance to Coal Handling control room operator to start the secondary crusher, Eccentric disc screen, belt feeder, shuttle feeders and Dust extraction system and allied equipments one by one whenever required, After starting the system, inspection of all the running equipments and condition of system and inform to CHS -5 operator to start coal feeding, Checking the out put size of crushed coal below 30 mm size in coal yard conveyor 49 & 54 by visual inspection, To change the discharge coal feeding either conveyor 49 or conveyor 54 to coal yard, by operating to move the BFD direction as per the instruction of site incharge and coal handling control room operator, Checking the ring granulator bearing housing, drive & driven pulley, feeder pulley bearings temperature of all the running equipments to be recorded in shift log book, Checking the oil level in all gearboxes, Checking the all drive fluid coupling, gear box and connecting multidisc assembly bolts and inspect any oil spray found in the system. If any abnormalities found in the system, inform to the maintenance engineer of SCH-II, During coal feeding any abnormality found in system immediately stop the crusher and alternate stand by system put in to service position, Checking of all the running drive ‘V’ belts, conveyor belt and adjusting the belt tension if necessary, Isolation of equipments as per guidance to follow the LC works in secondary crusher house-II, Arranging to attend the defect then and there in secondary crusher running equipments in coordination with maintenance incharge of SCH-II, Inform the condition of all the running equipments position to the field maintenance engineer incharge, All the shift duty operation activities are recorded in the shift log book then and there, Inspection and Monitoring all the running equipments bearing temperature by hand touch, vibration of running equipments by hand touch, oil level in gear box, fluid coupling, cleaning the air breather in all gear box, all bolts and nuts of all running equipments bed frame structure, all bearing housing assembly and tightness checking, any abnormality of running equipments, the belt scrapper, return belt scrappers, tracking the conveyor belt and also checking the belt joints, adjusting the skirt board rubber to minimize the spillage coal, Positioning the Shuttle feeder, when every changing of crusher, Inspection of all coal transfer chutes and deflecter plate, and free rotation of idler. | 480 | Operation | 8,47,200 ₹9,99,696 Lowest | 13,44,000 ₹15,85,920 |
Tender Value
Refer Docs
EMD Value
₹12,700
Closing Date
17 Aug 2026, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
ECHP-II-Inspection, Checking and monitoring of the mechanical equipments with allied works in SCH-II
2026_EB_690165_1
CE/TTPS/SE/MI/82/2026-2027
Open Tender
Miscellaneous Works
Works
228 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,700
Yes
20 Aug 2026
1 Aug 2026
18 Aug 2026
1 Aug 2026
17 Aug 2026
1 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for Inspection and giving clearance to Coal Handling control room operator to start the secondary crusher, Eccentric disc screen, belt feeder, shuttle feeders and Dust extraction system and allied equipments one by one whenever required, After starting the system, inspection of all the running equipments and condition of system and inform to CHS -5 operator to start coal feeding, Checking the out put size of crushed coal below 30 mm size in coal yard conveyor 49 & 54 by visual inspection, To change the discharge coal feeding either conveyor 49 or conveyor 54 to coal yard, by operating to move the BFD direction as per the instruction of site incharge and coal handling control room operator, Checking the ring granulator bearing housing, drive & driven pulley, feeder pulley bearings temperature of all the running equipments to be recorded in shift log book, Checking the oil level in all gearboxes, Checking the all drive fluid coupling, gear box and connecting multidisc assembly bolts and inspect any oil spray found in the system. If any abnormalities found in the system, inform to the maintenance engineer of SCH-II, During coal feeding any abnormality found in system immediately stop the crusher and alternate stand by system put in to service position, Checking of all the running drive ‘V’ belts, conveyor belt and adjusting the belt tension if necessary, Isolation of equipments as per guidance to follow the LC works in secondary crusher house-II, Arranging to attend the defect then and there in secondary crusher running equipments in coordination with maintenance incharge of SCH-II, Inform the condition of all the running equipments position to the field maintenance engineer incharge, All the shift duty operation activities are recorded in the shift log book then and there, Inspection and Monitoring all the running equipments bearing temperature by hand touch, vibration of running equipments by hand touch, oil level in gear box, fluid coupling, cleaning the air breather in all gear box, all bolts and nuts of all running equipments bed frame structure, all bearing housing assembly and tightness checking, any abnormality of running equipments, the belt scrapper, return belt scrappers, tracking the conveyor belt and also checking the belt joints, adjusting the skirt board rubber to minimize the spillage coal, Positioning the Shuttle feeder, when every changing of crusher, Inspection of all coal transfer chutes and deflecter plate, and free rotation of idler. | 480 | Operation | 55 | ₹26,400 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_829645.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].