| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 CrAccepted-AOC 1630 SECTOR 7C CHANDIGARH 160019 | CHANDIGARH | CHANDIGARH | CHANDIGARH | 160019 | ₹8.0 Cr | L1 | Accepted-AOC Lowest |
| 2 | L2₹8.0 Cr+₹83,492.27 (0.10%)Rejected-Finance 04 L BLOCK MARKET SECTOR 11 NOIDA 201301 UP GAUTAM BUDHA NAGAR | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹8.0 Cr+₹83,492.27 (0.10%) | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹8.3 Cr+₹26.6 L (3.34%)Rejected-Finance | ₹8.3 Cr+₹26.6 L (3.34%) | L3 | Rejected-Finance Not Lowest |
| 4 | L4₹8.6 Cr+₹64.7 L (8.10%)Rejected-Finance | ₹8.6 Cr+₹64.7 L (8.10%) | L4 | Rejected-Finance Not Lowest |
| 5 | L5₹9.0 Cr+₹97.0 L (12.1%)Rejected-Finance 5037 5038 URBAN ESTATE PH 1 PATIALA 147002 PUNJAB | PATIALA | PATIALA | PUNJAB | 147002 | ₹9.0 Cr+₹97.0 L (12.1%) | L5 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | SHRI GANESH ENTERPRISES L3 | Sant Construction Co. L5 | Shekhar Enterprises L6 | GEPS PROJECTS L2 | M/S LALIT BHATIA & CO L10 | TRIVENI CONSTRUCTIONS L4 | TEJHA POWER CONTROLS PRIVATE LIMITED L9 | SAGGI ELECTRIC COMPANY L1 | HTE INFRA LLP L7 | Powersol Infra Services Pvt. Ltd L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Lump sum price worked out by the Contractor for “BUILDING AND STRUCTURES, " as listed in Schedule ‘A’ Part - I representing __________ % _______________ percent Above / Below the lump sum price of `16,00,000.00 inserted by the MES in Schedule ‘A’ Part - I | 1 | LUMP SUM | 16,00,000 ₹16,00,000 | 17,60,000 ₹17,60,000 | 16,00,000 ₹16,00,000 | 16,00,000 ₹16,00,000 | 20,80,000 ₹20,80,000 | 17,32,000 ₹17,32,000 | 15,98,400 ₹15,98,400 Lowest | 25,84,000 ₹25,84,000 | 18,00,000 ₹18,00,000 | 24,19,000 ₹24,19,000 |
| 2.00 | Lump sum price worked out by the Contractor for “SITE CLEARANCE AND DEVELOPMENT INCLUDING DEMOLITION & EARTHWORK EXCAVATION, " as listed in Schedule ‘A’ Part - II representing __________ % _______________ percent Above / Below the lump sum price of `40,00,438.10 inserted by the MES in Schedule ‘A’ Part - II | 1 | LUMP SUM | 10,00,000 ₹10,00,000 Lowest | 42,00,460 ₹42,00,460 | 46,00,503.81 ₹46,00,503.81 | 40,00,438.1 ₹40,00,438.1 | 52,00,000 ₹52,00,000 | 32,25,550 ₹32,25,550 | 33,98,258 ₹33,98,258 | 24,32,000 ₹24,32,000 | 25,00,000 ₹25,00,000 | 41,61,439.92 ₹41,61,439.92 |
| 3.00 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIC SUPPLY” as listed in Schedule ‘A’ Part - III representing __________ % ____________ percent Above / Below the lump sum price of `1,23,499.23 inserted by the MES in Schedule ‘A’ Part - III | 1 | LUMP SUM | 1,23,499.23 ₹1,23,499.23 | 1,42,024.11 ₹1,42,024.11 | 1,23,499.23 ₹1,23,499.23 | 1,23,499.23 ₹1,23,499.23 | 1,25,000 ₹1,25,000 | 1,00,000 ₹1,00,000 Lowest | 1,69,870 ₹1,69,870 | 1,52,000 ₹1,52,000 | 1,86,000 ₹1,86,000 | 2,64,318.82 ₹2,64,318.82 |
| 4.00 | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - IV representing __________ % ____________ percent Above / Below the lump sum price of ₹19,586.30 inserted by the MES in Schedule ‘A’ Part - IV | 1 | LUMP SUM | 19,586.3 ₹19,586.3 | 27,420.82 ₹27,420.82 | 24,482.87 ₹24,482.87 | 19,586.3 ₹19,586.3 | 25,000 ₹25,000 | 25,000 ₹25,000 | 23,503 ₹23,503 | 18,025 ₹18,025 Lowest | 35,000 ₹35,000 | 37,264.4 ₹37,264.4 |
| 5.00 | Lump sum price worked out by the Contractor for “ROADS / PATH/ HARDSTANDING ” as listed in Schedule ‘A’ Part - V representing ________ % ____________ percent Above / Below the lump sum price of ₹1,57,269.51 inserted by the MES in Schedule ‘A’ Part - V | 1 | LUMP SUM | 1,57,269.51 ₹1,57,269.51 | 2,20,177.31 ₹2,20,177.31 | 1,72,996.46 ₹1,72,996.46 | 1,57,269.51 ₹1,57,269.51 | 1,75,000 ₹1,75,000 | 1,65,000 ₹1,65,000 | 1,40,649 ₹1,40,649 | 1,34,256 ₹1,34,256 Lowest | 2,50,000 ₹2,50,000 | 10,17,042 ₹10,17,042 |
| 6.00 | Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL” as listed in Schedule ‘A’ Part - VI representing _________ % __________________ percent Above / Below the lump sum price of `1,54,878.90 inserted by the MES in Schedule ‘A’ Part - VI | 1 | LUMP SUM | 1,54,878.9 ₹1,54,878.9 | 1,93,598.62 ₹1,93,598.62 | 1,62,622.85 ₹1,62,622.85 | 1,54,878.9 ₹1,54,878.9 | 1,67,000 ₹1,67,000 | 1,54,878.9 ₹1,54,878.9 | 1,38,751 ₹1,38,751 Lowest | 1,43,000 ₹1,43,000 | 2,50,000 ₹2,50,000 | 1,89,726.3 ₹1,89,726.3 |
| 7.00 | Lump sum price worked out by the Contractor for “AREA DRAINAGE” as listed in Schedule ‘A’ Part - VII representing __________ % _________________ percent Above / Below the lump sum price of ₹4,85,748.85 inserted by the MES in Schedule ‘A’ Part - VII | 1 | LUMP SUM | 4,85,748.85 ₹4,85,748.85 | 6,07,186.06 ₹6,07,186.06 | 4,85,748.85 ₹4,85,748.85 | 4,85,748.85 ₹4,85,748.85 | 5,15,000 ₹5,15,000 | 3,50,000 ₹3,50,000 | 3,15,446 ₹3,15,446 Lowest | 4,50,280 ₹4,50,280 | 7,50,000 ₹7,50,000 | 4,04,334.08 ₹4,04,334.08 |
| 8.00 | Lump sum price worked out by the Contractor for “RCC RETAINING WALL” as listed in Schedule ‘A’ Part - VIII representing __________ % _________________ percent Above / Below the lump sum price of ₹8,93,835.50 inserted by the MES in Schedule ‘A’ Part - VIII | 1 | LUMP SUM | 8,93,835.5 ₹8,93,835.5 | 10,27,910.82 ₹10,27,910.82 | 9,56,404 ₹9,56,404 | 8,93,835.5 ₹8,93,835.5 | 9,95,000 ₹9,95,000 | 8,00,000 ₹8,00,000 Lowest | 8,44,032 ₹8,44,032 | 8,30,372 ₹8,30,372 | 13,75,000 ₹13,75,000 | 9,80,969.4 ₹9,80,969.4 |
| 9.00 | Lump sum price worked out by the Contractor for “CHAIN LINK FENCING” as listed in Schedule ‘A’ Part - IX representing __________ % _________________ percent Above / Below the lump sum price of ₹2,74,117.47 inserted by the MES in Schedule ‘A’ Part - IX | 1 | LUMP SUM | 2,74,117.47 ₹2,74,117.47 | 3,15,235.09 ₹3,15,235.09 | 2,74,117.47 ₹2,74,117.47 | 2,74,117.47 ₹2,74,117.47 | 3,25,000 ₹3,25,000 | 1,90,000 ₹1,90,000 Lowest | 2,76,132 ₹2,76,132 | 2,19,999 ₹2,19,999 | 4,20,000 ₹4,20,000 | 3,77,297.92 ₹3,77,297.92 |
| 10.00 | Lump sum price worked out by the Contractor for “EXTERNAL ELECTRIC SUPPLY” as listed in Schedule ‘A’ Part - X representing __________ % ____________ percent Above / Below the lump sum price of ₹7,57,000.95 inserted by the MES in Schedule ‘A’ Part - X | 1 | LUMP SUM | 7,57,000.95 ₹7,57,000.95 Lowest | 8,32,701.05 ₹8,32,701.05 | 7,57,000.95 ₹7,57,000.95 Lowest | 7,57,000.95 ₹7,57,000.95 Lowest | 7,99,000 ₹7,99,000 | 7,57,000.95 ₹7,57,000.95 Lowest | 8,64,537 ₹8,64,537 | 8,78,484 ₹8,78,484 | 9,00,000 ₹9,00,000 | 14,56,916.5 ₹14,56,916.5 |
Tender Value
₹10.4 Cr
EMD Value
₹8.5 L
Closing Date
19 Jun 2025, 6:00 pmClosed
CHIEF ENGINEER RND SECUNDERABAD
CHIEF ENGINEER RND SECUNDERABAD PICKET OPP JUBILEE BUS STATION SECUNDERABAD 500003
PROVISION OF ADDITIONAL 5 MVA ELECTRICAL POWER AT CHESS VIGNYANKANCHA HYDERABAD
2025_MES_708387_1
84039
Open Tender
Electrical and Maintenance Works
Lump-sum
365 days
RCI Hyderabad
Class S
category b(ii)
8 documents required · 8 mandatory
₹3,000
GARRISON ENGINEER I RND RCI HYDERABAD
₹8.5 L
Yes
23 Oct 2025
15 May 2025
21 Jun 2025
15 May 2025
19 Jun 2025
12 Jun 2025
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_793439.xls
BOQ • 0.65 MB
170579272.pdf
Tender Documents • 0.50 MB
170579283.html
Tender Documents • 0.06 MB
84039Tender.pdf
Tender Documents • 1.60 MB
84039_Drawings.rar
Tender Documents • 26.37 MB
Prepriced_schedules.pdf
Tender Documents • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .