| 1 | L1₹5.6 LAccepted-AOC D NO 271D3 5 ANDAL NAGAR K R NAGAR NALATINPUTHUR KOVILPATTI TK 628 716 | KOVILPATTI | TUTICORIN | TAMIL NADU | 628716 | ₹5.6 L Quoted ₹6.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.2 LRejected-Finance | ₹7.2 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | K.T. PAUL RAJ L2 | S CHELLADURAI CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Clearing juliflora jungle without uprooting and disposing the same to far away place as directed by the Engineer in charge including all cost of labour lead lift etc complete | 20,267 | M2 | 8 ₹1,62,136 | 6 ₹1,21,602 Lowest |
| 2.00 | Providing LED street lights 60 W inside the store yard wherever the exisitng lights were worn out, including the cost of labour for fixing cost of all materials, lead lift etc complete | 16 | Nos | 3,000 ₹48,000 Lowest | 5,000 ₹80,000 |
| 3.00 | EWE and depositing on bank with initial lead of 10m & initial lead of 2m in hard stiff clay, stiff black cotton, hard red earth,shales, murram, gravel, stoney earth and earth mixed with smallsize boulders SS 20B | 40 | M3 | 280 ₹11,200 | 120 ₹4,800 Lowest |
| 4.00 | PCC 1:3:6 using 40mm metal including the cost of all materials, labour, lead, lift, etc., complete | 13 | M3 | 6,400 ₹83,200 | 5,400 ₹70,200 Lowest |
| 5.00 | Random Rubble Masonary in C.M 1:6 including the cost of all materials, labour, lead, lift etc., complete. | 32 | M3 | 5,400 ₹1,72,800 | 5,100 ₹1,63,200 Lowest |
| 6.00 | Filling with good quality gravel in layers including consolidation by watering and preparing the top surface for flooring including the cost of all materials, labour, lead, lift etc., complete | 29 | M3 | 400 ₹11,600 Lowest | 450 ₹13,050 |
| 7.00 | PCC 1:2:4 using 20mm metal including the cost of all materials, labour, lead, lift, etc., complete | 9 | M3 | 8,500 ₹76,500 | 6,300 ₹56,700 Lowest |
| 8.00 | Plastering with C.M;1:3, 20 mm thick including the cost of all materials, lead,lift, etc., complete. | 100 | M2 | 380 ₹38,000 Lowest | 450 ₹45,000 |
| 9.00 | Pointing the exposed faces of R.R Masonary with C.M;1:3, 12mm thick including the cost of all materials, lead,lift, etc., complete. | 20 | M2 | 300 ₹6,000 Lowest | 300 ₹6,000 Lowest |
| 10.00 | SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | LS | 9 ₹54,849.24 | 9 ₹50,449.68 Lowest |
Tender Value
Refer Docs
EMD Value
₹6,500
Closing Date
11 Feb 2026, 12:00 pmClosed
SE/GCC/Madurai
SE/GCC/Madurai
Providing raised plate form clearing Juliflora jungle inside the stub stores at Maharajanagar, TIN
2026_EB_651863_1
SE/GCC/Madurai F. Specn. No.067/2025-26
Limited
Civil Works
Works
60 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,500
27 May 2026
5 Feb 2026
12 Feb 2026
5 Feb 2026
11 Feb 2026
5 Feb 2026
Clearing juliflora jungle without uprooting and disposing the same to far away place as directed by the Engineer in charge including all cost of labour lead lift etc complete
Providing LED street lights 60 W inside the store yard wherever the exisitng lights were worn out, including the cost of labour for fixing cost of all materials, lead lift etc complete
EWE and depositing on bank with initial lead of 10m & initial lead of 2m in hard stiff clay, stiff black cotton, hard red earth,shales, murram, gravel, stoney earth and earth mixed with smallsize boulders SS 20B
PCC 1:3:6 using 40mm metal including the cost of all materials, labour, lead, lift, etc., complete
Random Rubble Masonary in C.M 1:6 including the cost of all materials, labour, lead, lift etc., complete.
Filling with good quality gravel in layers including consolidation by watering and preparing the top surface for flooring including the cost of all materials, labour, lead, lift etc., complete
PCC 1:2:4 using 20mm metal including the cost of all materials, labour, lead, lift, etc., complete
Plastering with C.M;1:3, 20 mm thick including the cost of all materials, lead,lift, etc., complete.
Pointing the exposed faces of R.R Masonary with C.M;1:3, 12mm thick including the cost of all materials, lead,lift, etc., complete.
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_781657.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].