Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 25 OTTHAVADA STREET NEAR NEW BUS STAND ARAKKONAM 631 001 | ARAKKONAM | RANIPET | TAMIL NADU | 631001 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | Admitted-Finance |
| 4 | Admitted-Finance NO 10A 50 REDDY PALAYAM ATHIPATTU CHENNAI 600 120 | CHENNAI | CHENNAI | TAMIL NADU | 600120 | Admitted-Finance |
| 5 | Admitted-Finance 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | PUDUKKOTTAI | TAMIL NADU | 621308 | Admitted-Finance |
Tender Value
₹42.4 L
EMD Value
₹42,400
Closing Date
5 Oct 2020, 2:00 pmClosed
SE/GCC-I/CNI
3rd floor 230 KV GIS SS, A-10, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai-32
as per NIT
2020_EB_180567_1
PT-008/20-21 of SE/GCC-I/CNI
Open Tender
Civil Works
Works
120 days
Athipet
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹42,400
Yes
29 Oct 2020
19 Sept 2020
6 Oct 2020
19 Sept 2020
5 Oct 2020
19 Sept 2020
Amount
Labour charges for Clearing of juliflora jungle away from site including cost of all labour, transport, T&P, lead lift etc., complete as directed by the department engineer at site.
Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site.
Providing and laying Sand filling for foundation including cost of labour, transport, consolidation, lead and lift etc., complete as per standerd specification and as directed by the department at site.
Plain Cement Concrete 1:3:6 using 40 mm HBG stone for foundation including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site .
R:C:C 1:1.5:3 using 12 to 20mm HBG metal for raft including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Without form work
R.C.C. 1:1.5:3 using 12- 20mm metal for foundation for Plinth with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Providing and laying P:C:C 1:2:4 using 20mm HBG metal for plinth below GL without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site
Providing and laying P.C.C 1:2:4 using 20mm HBG stone for Transformer Plinths above GL with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Supply, fabrication and placing in position of steel reinforcement for all RCC works including cost of all materilas steel, binding wire, labour, lead, lift, cutting, bending, typing and binding and placing in position etc., complete as directed by the department engineer at site.
Labour charges for assembling of template in correct position and aligenment for various equipment plinth and grouting the foundation bolts including cost of all materials transport, labour, lead, lift etc., complete as directed by the dept. Engineer at site.
Supplying and providing 90 lbs rails in transformer plint and labour charges for fixing in correct position and aligenment as directed by dept.Engineer at site including cost of Rail, cutting charges , transport to site, labour, lead, lift etc. Complete as directed by the department engineer at site.
Supplying and fixing GI angles 65 x 65 x 6mm for cable duct including the cost of cutting to required length, fixing in position and all materials, labour, lead, lift, etc.,complete and as directed by the department engineer at site.
Plastering in CM 1:3 12 mm thick including cost of all materials, transport, curing, labour, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site .
Colour washing with two coats over a primer coat including cost of paint, all materials labour, lead, etc., complete and as directed by the Department Engineer at site.
Labour charges for romoval of surplus earth wherever necessary including transport upto 2 KM away from the site, loading and unloading, transport, labour, lead, lift etc., complete as directed by the department engineer at site.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
ULTRAPOWER BUILDERS
S S AND CO
JAI ENGINEERING
K RAJARAM
K DHINAKARAN
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .