| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 216 THONDAIMANVIDUTHI PUDUKKOTTAI | PUDUKKOTTAI | TAMIL NADU | 613301 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
19 Oct 2023, 3:00 pmClosed
BLOCK DEVELIPMENT OFFICER (B.PTS)
KARAMBAKUDI
Construction of Compound wall in M.Therkutheru PUM school at M.therkutheru panchayat
2023_RDTN_377771_2
WORK 1 MLA M.THERKUTHERU PANCHAYAT
Open Tender
Civil Works
Item Rate
180 days
KARAMBAKUDI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7,000
20 Oct 2023
18 Oct 2023
19 Oct 2023
18 Oct 2023
19 Oct 2023
18 Oct 2023
Amount
N/W .Construction of Compound wall at M.Therkutheru PUM School in M.Therkutheru Panchayat
Earth work exacavation and depositing on bank with initial lead and lift in cll clauses of soils such as as per S.S.20B for narrow foundation etc. complete.
Filling with good river sand including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification
Providing form work centering for soffits of slab of plan surface including shuttering 3m high using MS sheets of size 15 x 25 x 3 mm laid over w.joints of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification
RCC 1:11/2:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with cement mortor 1:5 mix 12mm thickness including cost of conveyance of all materials to work site and all labour charges etc.
Painting two coats with ready mixed Plastic Emulsion Paint S.I.358 Plastic emulison paint of'approved quality and colour over a priming coat, including 'thorough scrap ping,clean removal of dirt, etc complete .
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
CMS CONSTRUCTION
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .