Tender Value
₹24.7 L
EMD Value
₹27,000
Closing Date
26 Aug 2022, 3:00 pmClosed
Project Director,DRDA,Virudhunagar
DRDA, Collectorate, Virudhunagar
Repair/Renovation of Class room buildings - 16 nos., Kitchen Sheds - 4 nos. and Toilets - 6 nos.and Providing water supply - 1 no. in 14-PU Primary/Middle Schools in Vembakottai Block of Virudhunagar District under SIDS for the year 2021-22
2022_RDTN_243316_9
C2/5754-Tender/2021 dtd.06.07.2022
Open Tender
Construction Works
Item Rate
120 days
Vembakottai
Single cover system. Refer tender document.
4 documents required · 4 mandatory
₹0
₹27,000
DRDA, Collectorate, Virudhunagar
17 Oct 2022
22 Jul 2022
26 Aug 2022
22 Jul 2022
26 Aug 2022
1 Aug 2022
1 Aug 2022
Amount
Part-1:- Repair/Renovation of 2 Class rooms in East building West Facing & West building North facing in PU Primary School at Inamreddiapatti Village of Inamreddiapatti V.Pt.
Chipping and cleaning of existing damaged cement plaster
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Pointing with cement mortar 1:3 to full depth of tiles using water proofing compound including cost and conveyance of all materials to site and all labour charges etc complete
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete
Painting the Black Boards two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Supplying and fixing of MS Window 0.90x1.20m
Part-2:- Repair/Renovation of Toilet to Boys in PU Primary School at Inamreddiapatti Village of Inamreddiapatti V.Pt.
Chipping and cleaning of existing damaged cement plaster
Paving the Floor with scratch proof ceramic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with glazed tiles of size 300 x 200 x 6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete
Part-3:- Repair/Renovation of Class room in RCC building in PU Primary School at Pandiapuram Village of Inamreddiapatti V.Pt.
Pointing with cement mortar 1:3 to full depth of tiles using water proofing compound including cost and conveyance of all materials to site and all labour charges etc complete
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete
Painting the Black Boards two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Part-4:- Repair/Renovation of 2 Class rooms in North RCC building East & West Facing in PU Primary School at E.Mettur Village of Kangarakottai V.Pt.
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete
Painting the Black Boards two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Part-5:- Repair/Renovation of Kitchen Shed in PU Primary School at E.Mettur Village of Kangarakottai V.Pt.
Chipping and cleaning of existing damaged cement plaster
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete
Part-6:- Repair/Renovation of 2 Class rooms in North & South RCC Building in PU Primary School at Keelachellaiyapuram Village of Kangarakottai V.Pt.
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over old wood work such as doors, windows, ventilators, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete
Painting the Black Boards two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Supplying and fixing of MS Window 0.90x1.20m
Supplying and fixing of MS Door 1.00x2.00m
Part-7:- Repair/Renovation of Toilet to Boys in PU Primary School at Kovilchellaiyapuram Village of Kangarakottai V.Pt.
Dismantling of Reinforced Cement Concrete
Centering charges for sides and soffits of R.C.C.works including labour etc., complete as per standard specification.-Below GL
Supplying and fabrication of steel for R.C.C. works including all cost and conveyance of materials, labour charges such as cutting, bending, tying and placing in position, etc., complete as per standard specification.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Chipping and cleaning of existing damaged cement plaster
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Paving the Floor with scratch proof ceramic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with glazed tiles of size 300 x 200 x 6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete
Part-8:- Repair/Renovation of Kitchen Shed in PU Primary School at Kovilchellaiyapuram Village of Kangarakottai V.Pt.
Chipping and cleaning of existing damaged cement plaster
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete
Part-9:- Repair/Renovation of Toilet to Boys in PU Primary School at krishnapuram Village of Kangarakottai V.Pt.
Chipping and cleaning of existing damaged cement plaster
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Paving the Floor with scratch proof ceramic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with glazed tiles of size 300 x 200 x 6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete
Part-10:- Repair/Renovation of Toilet to Boys in PU Primary School at Marakanathapuram Village of Kangarakottai V.Pt.
Chipping and cleaning of existing damaged cement plaster
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Part-11:- Repair/Renovation of Kitchen Shed in PU Primary School at Marakanathapuram Village of Kangarakottai V.Pt.
Chipping and cleaning of existing damaged cement plaster
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Pointing with cement mortar 1:3 to full depth of tiles using water proofing compound including cost and conveyance of all materials to site and all labour charges etc complete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete
Part-12:- Repair/Renovation of Class room in RCC building in PU Primary School at Vellaiyapuram Village of Kangarakottai V.Pt.
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement
Chipping and cleaning of existing damaged cement plaster
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete
Painting the Black Boards two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Part-13:- Repair/Renovation of Toilet to Boys in PU Primary School at Vellaiyapuram Village of Kangarakottai V.Pt.
Chipping and cleaning of existing damaged cement plaster
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Paving the Floor with scratch proof ceramic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with glazed tiles of size 300 x 200 x 6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete
Part-14:- Providing Water Supply in PU Primary School at Kottaipatti Village of Kottaipatti V.Pt
Geo Physical Survey Charges to locate the favourable drilling point
Drilling of 150mm dia borewell in Loose Soil area including labour charges for insertion of casing pipes in to the drilled hole
Drilling of 150mm dia borewell in hardrock area including labour charges for insertion of casing pipes in to the drilled hole
Supply and delivery of 165mm dia PVC casing pipe
charges for condutuon yield test by submersible pumpset
Supply and delivery of submersible pumpset of duty 15LPM x 125 M Head 1.5 HP
Supply and delivery of Panel Board suitable for submersible pumpset
2.5 sq.mm Submersible Cable
32mm GI pipe
32mm GI Coupling
1000 litre HDPE tank
32 mm GI coupling
32mm NRV
32mm clampset
32mm Hex Nipple
Meter Board
20mm GI pipe
6'' Bore well cover
32 mm GM Gate Valve
Labour charges for erection of submersible pumpset
Earth work excauation in all types of soil for laying of PVC pipe including all charges etc., complete
refilling Excavated earth Inculding all Labour charges etc., complete
Supply and delivery of PVC Pipes 63 mm 4kg/cm2
Laying and jointing of 63mm PVC pipes with lead of 200m lowering into trends laying proper grade and 1km lead
Part-15:- Repair/Renovation of 2 Class rooms in RCC building South side East facing and North building west Facing in PU Primary School at Kottaipatty Village of Kottaipatty V.Pt.
Dismantling of old damaged Pressed tiles-One Course laid in C.M.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement-Using 40% Old tiles
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete
Painting the Black Boards two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Part-16:- Repair/Renovation of Class room in RCC building in PU Primary School at Melaottampatti Village of Melaottampatti V.Pt.
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement
Chipping and cleaning of existing damaged cement plaster
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Providing granolithic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete
Painting the Black Boards two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Part-17:- Repair/Renovation of Class room in RCC building in PU Primary School at Mankundanpatti Village of Thayilpatti V.Pt.
Chipping and cleaning of existing damaged cement plaster
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement-Using 50% Old tiles
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over old wood work such as doors, windows, ventilators, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete
Painting the Black Boards two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Part-18:- Repair/Renovation of Toilet to Boys in PU Primary School at Mankundanpatti Village of Thayilpatti V.Pt.
Chipping and cleaning of existing damaged cement plaster
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete
Part-19:- Repair/Renovation of Kitchen Shed in PU Primary School at Mankundanpatti Village of Thayilpatti V.Pt.
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete
Pointing the RR Masonry with cement mortar 1:3 mix including cost and conveyance of all materials to site and all labour charges etc complete
Part-20:- Repair/Renovation of 2 Class rooms in RCC building West side East Facing, East Side South Facing in PU Primary School at Mela Thayilpatti Village of Thayilpatti V.Pt.
Chipping and cleaning of existing damaged cement plaster
Paving the floor with Vitrified tiles of size using C.M.1:3-20mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Providing granolithic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Pointing with cement mortar 1:3 to full depth of tiles using water proofing compound including cost and conveyance of all materials to site and all labour charges etc complete
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete
Painting the Black Boards two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement-Using 50% Old tiles
Part-21:- Repair/Renovation of Class room in RCC Building West side north facing in PU Primary School at Vembakottai Village of Vembakottai V.Pt.
Pointing with cement mortar 1:3 to full depth of tiles using water proofing compound including cost and conveyance of all materials to site and all labour charges etc complete
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete
Painting the Black Boards two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Part-22:- Repair/Renovation of Class room in RCC Building north facing in PU Primary School at Vilamarathupatti Village of Vembakottai V.Pt.
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement(Using 20% Old tiles)
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete
Painting the Black Boards two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
GMARIAPPANANDCO
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_287634.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .