Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15 LAccepted-Finance | 1 | Accepted-Finance Rate is As Per BSR so Accepted |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
14 Aug 2026, 10:00 amClosed
BDO PANCHAYAT SAMITI LOONKARANSAR
PANCHAYAT SAMITI LOONKARANSAR
Khel medan(kusti) ka nirman and any vikash kary Khinyera
2026_PRD_580635_1
PSLKS 320-322 dated 30.7.2026
Open Tender
Civil Works
Percentage
Khinyera
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
BDO PANCHAYAT SAMITI LOONKARANSAR
₹30,000
Yes
17 Aug 2026
1 Aug 2026
14 Aug 2026
1 Aug 2026
14 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earthwork in foundation excavation up to1.5m, ramming bressing both sides backfilling and dosposal of surplus soil within lead of 50m | - | Cum | 178.46 | - |
| 1.02 | Brick work in foundation and plinth using brick of class designation 75 in CM 1:6 | - | Cum | 4,698.68 | - |
| 1.03 | Earth work of filling with ordinary soil | 1 | Cum | 83.07 | ₹82.99 |
| 1.04 | Carriage of Earth work of filling 1km | 1 | Cum | 122.26 | ₹122.14 |
| 1.05 | 20mm thick plaster on new work
including | - | Sqm | 173.75 | - |
| 1.06 | Enamel painting on wall | - | sqm | 131.54 | - |
| 1.07 | Providing and laying Cement Interlocking Bricks M-
30 grade 60mm thick | - | Sqm | 589.05 | - |
| 1.08 | Earth work in foundation excavation up to 1.5m, ramming bottom, dressing sides, back filling and
disposal of surplus soil with in a lead of 50m. | 2.92 | Sqm | 515.26 | ₹1,504.56 |
| 1.09 | Cement concrete in 1:4:8 mix including curing and compaction etc. | - | Cum | 3,531.8 | - |
| 1.1 | Reinforced cement concrete work includingcuring compaction, finishing with rendering incement sand mortar 1:3 and making good andjoints excluding cost of centering, shutteringand reinforcement in 1:1.5:3 (1cement:1.5course sand: 3-graded stone aggregate20mm nominal size) | - | Cum | 5,366.91 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
biddocuments21.pdf
Tender Documents • 11.15 MB
BOQ_1031730.xls
BOQ • 0.25 MB
NITRevisedTender.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .