Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 CrAccepted-AOC | ₹12.8 Cr | L1 | Accepted-AOC L1 |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Bid not Submitted on Prahari Portal |
| 3 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
| 4 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | M/S ARCHANA CONSTRUCTION |
|---|---|---|---|---|
| 1.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 57,064.3 | cum. | 63,91,201.6 ₹63.9 L |
| 2.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (2.000Km Carted) | 1,266 | cum. | 2,34,210 ₹2.3 L |
| 3.00 | Earth work in trench cutting in proper camber according to required depth for laying garnular sub base including rolling with road roller upto required M.D.D., dressing, cost of labour, T&P and hire charges of machinery etc. complete work as per | 3,993.2 | cum. | 2,03,653.2 ₹2.0 L |
| 4.00 | Construction of Granular sub base by providing coarse graded material, mixing in a place method at O.M.C. carriage of mixed material to work site, spreading in uniform layer with motor grader on prepared surface and compacting with vibtatory power roller to achive the desired density complete as per clause 401. | 8,459.25 | cum. | 1,88,72,586.75 ₹1.9 Cr |
| 5.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 12,772.35 | cum. | 3,08,19,680.55 ₹3.1 Cr |
| 6.00 | Earth filling in patri in including rolling with road roller upto required M.D.D., dressing the surface to required level and slope & also including 1.50 m. lift and 30 m. lead, cost of labour, T&P and hire charges of machinery etc. complete work as per direction of Engineer-in-Charge. | 17,698.5 | cum. | 19,82,232 ₹19.8 L |
| 7.00 | Earth filling in patri in including rolling with road roller upto required M.D.D., dressing the surface to required level and slope & also including 1.50 m. lift and 30 m. lead, cost of labour, T&P and hire charges of machinery etc. complete work as per direction of Engineer-in-Charge (carted 2000m). | 2,151.8 | cum. | 3,98,083 ₹4.0 L |
| 8.00 | Providing and applying primer coat with S.S.-1 Grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.75 kg/sqm using mechanical means. | 82,920 | sqm. | 29,02,200 ₹29.0 L |
| 9.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. | 3,712.5 | cum. | 2,93,77,012.5 ₹2.9 Cr |
| 10.00 | Providing and applying tack coat with V.G. 10 grade bitumen using emlusion pressure dristributor @ 0.20 kg. per sqm. on the prepared bituminous surface cleaned with machenical broom. As per MORT&H on wmm steblization as per Clause 503 | 41,670 | Sqm | 4,16,700 ₹4.2 L |
Tender Value
₹12.9 Cr
EMD Value
₹25.8 L
Closing Date
9 Jan 2026, 12:00 pmClosed
SE BANDA CIRCLE PWD BANDA
OFFICE OF THE SE BANDA CIRCLE PWD BANDA
WIDENING AND STRENGTHENING OF THE ROAD -OTHER DISTRICT ROAD- FROM KHURHAND RAILWAY STATION TO BANDA BISANDA ROAD VIA JAMREHI
2025_CEBAN_1090207_1
4617/35 C - Banda Circle/2025-26 Dt. 07-11-2025
Open Tender
Civil Works
365 days
BANDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,260
Yes
₹25.8 L
Yes
4 Mar 2026
31 Dec 2025
9 Jan 2026
31 Dec 2025
9 Jan 2026
31 Dec 2025
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (2.000Km Carted)
Earth work in trench cutting in proper camber according to required depth for laying garnular sub base including rolling with road roller upto required M.D.D., dressing, cost of labour, T&P and hire charges of machinery etc. complete work as per
Construction of Granular sub base by providing coarse graded material, mixing in a place method at O.M.C. carriage of mixed material to work site, spreading in uniform layer with motor grader on prepared surface and compacting with vibtatory power roller to achive the desired density complete as per clause 401.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Earth filling in patri in including rolling with road roller upto required M.D.D., dressing the surface to required level and slope & also including 1.50 m. lift and 30 m. lead, cost of labour, T&P and hire charges of machinery etc. complete work as per direction of Engineer-in-Charge.
Earth filling in patri in including rolling with road roller upto required M.D.D., dressing the surface to required level and slope & also including 1.50 m. lift and 30 m. lead, cost of labour, T&P and hire charges of machinery etc. complete work as per direction of Engineer-in-Charge (carted 2000m).
Providing and applying primer coat with S.S.-1 Grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.75 kg/sqm using mechanical means.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Providing and applying tack coat with V.G. 10 grade bitumen using emlusion pressure dristributor @ 0.20 kg. per sqm. on the prepared bituminous surface cleaned with machenical broom. As per MORT&H on wmm steblization as per Clause 503
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder as per job mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects on DBM
Compaction of embankment at site from excavated material graded and compacted to meet requirement of table 300-2.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
Construction of Out Fall Drain. (RCR) Earth work in excavation in trenches for foundation in ordnary soil including lift up to 1.5 m, lead upto 30 m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in-charges with in a distance of
Providing and laying of sand including cost of material, labour, water charges and T&P etc. required for proper completion of work as per S.I. No. 255
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (as per MoRT&H Specification No. 2100 S.l No. 12.4)
Random course Rubble massonary in 1:4 cement and fine sand mortar in foundation and plinth, including supply of all materials, labour & T&P etc. required for proper completion of the work.
Cement concrete with 2cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work.
Providing and laying R.C.C. 1 : 2 : 4 ( 1 cement : 2 coarse sand : 4 graded stone grit 20 mm) by laid over drain including supply of all material, curing, labour and T & P etc required for proper completion of the work.
M.S. or Iron in plane work such as in reinforced concrete to required shaps as necessary including bending for completion of work and inlcuidng supply of tor steel its westage bend hooks and authoriesd over labpping shall be ineasued up to floor two level
Construction of RCR Retaining Wall (2m height) Excavation in foundation in B.C. soil including lift upto 1.50m.and lead upto 30.00m (100 ft.) and including filling watering and ramming or excavated earth into the trenches or in to space between and building and the sides
Coarse sand filling in plinth including supply of necessary quantity of coarse sand from the side of work & including watering ,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for proper completion of the work.
Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Random course Rubble massonary in 1:4 cement and fine sand mortar in foundation and plinth, including supply of all materials, labour & T&P etc. required for proper completion of the work.
Raised cement pointing with 1:2 cement, fine sand mortar including supply of all materials, labour and tools and plants etc. Required for proper completion of the work.
Cement concrete with 2cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work.
P/L of 100 mm. dia. A.C. pipe in weap hole.
Constructuion of Gule Culverts Single Row 0.350 m Dia Excavation in foundation in B.C soil including lift up to 15 meter and lead upto 30 m (100 ft) and including filling, watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M from the foundation trenches.(S.I.No. 251)
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 Km from the site of work & including watering, dressing etc. Rate to include cost of all materials, labour and tools & plants etc. required for proper completion of the work. (S.I.No. 255)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (as per MoRT&H Specification No. 2100 S.l No. 12.4)
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications
S & Laying in the Hume pipe with collars in position with cement and sand mortar in 1:2 withsun including labour and T & P etc. required for proper completion of work as per direction of by the Engineer-in-charge N.P-3-Type (a) 350 mm dia
12mm thick plaster on brick work minimum thickness not less than 10mm with 1part of cement and 4 part of find sand of 1.25 fineness modulus. As per SI. No.-584
Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all materials, labour, tools and plants etc. required for proper completion of work.
Cement concrete with 2cm gauge approved stone ballast, approved coarse sand. cement in the proportion 1:2:4 including supply of all materials,labour and tools and plants etc. required for proper completion of the work.
Lettering painting of Culvert Nos. etc.
Constructuion of Culverts Single Row 0.600 m Dia Excavation in foundation in B.C soil including lift up to 15 meter and lead upto 30 m (100 ft) and including filling, watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M from the foundation trenches.(S.I.No. 251)
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 Km from the site of work & including watering, dressing etc. Rate to include cost of all materials, labour and tools & plants etc. required for proper completion of the work. (S.I.No. 255)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (as per MoRT&H Specification No. 2100 S.l No. 12.4)
S & Laying in the Hume pipe with collars in position with cement and sand mortar in 1:2 withsun including labour and T & P etc. required for proper completion of work as per direction of by the Engineer-in-charge N.P-3-Type (a) 600 mm dia
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications
12mm thick plaster on brick work minimum thickness not less than 10mm with 1part of cement and 4 part of find sand of 1.25 fineness modulus. As per SI. No.-584
Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all materials, labour, tools and plants etc. required for proper completion of work.
Lettering painting of Culvert Nos. etc.
Construction of Culverts Single Row 1.00 m Dia Excavation in foundation in B.C soil including lift up to 15 meter and lead upto 30 m (100 ft) and including filling, watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M from the foundation trenches.(S.I.No. 251)
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 Km from the site of work & including watering, dressing etc. Rate to include cost of all materials, labour and tools & plants etc. required for proper completion of the work. (S.I.No. 255)
Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 1:4:8 including supply of all materials,labour and tools and plants etc. required for proper completion of the work.
Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work.
Providing and laying reinforced concrete pipe NP3 in single row for culverts on 'Type A' (Concrete cradle) bedding with M 15 grade cement concrete including fixing coller with cement mortar 1:2 but excuding excavation protrction work, backfilling, concrete and masonary works in head walls and parapets clause 1106 as per Data Book item No. 9.3 (B)
12mm thick plaster on brick work minimum thickness not less than 10mm with 1part of cement and 4 part of find sand of 1.25 fineness modulus. As per SI. No.-584
Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all materials, labour, tools and plants etc. required for proper completion of work.
Cement concrete with 2cm gauge approved stone ballast, approved coarse sand. cement in the proportion 1:2:4 including supply of all materials,labour and tools and plants etc. required for proper completion of the work.
Lettering painting of Culvert Nos. etc.
Construction of RCC Slab Culvert 2.00 m Span Excavation in foundation in B.C soil including lift up to 15 meter and lead upto 30 m (100 ft) and including filling, watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or i
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km (5 miles) from the side of work & including watering ,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for p
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Class-150 brick work in 1:3 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants eyc. Required for proper completion of the work.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 Using Batching Plant, transit Mixer and Manual placing (For Slab and Approach Slab)
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Cement concrete with 20mm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. As per S.I. 279(a).
12 mm thick plaster on brick work not less than 10mm with cement mortar in proportion 1:3 cement and fine sand of 1.25 F.M. including cost of all matetials labour, T& P etc. required completion of the work as per direction of the Engineer-in-charge SI
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification clauses 617. 709, 1204.3.7
Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all materials, labour, tools and plants etc. required for proper completion of work.
Construction of RCC Slab Culvert 3.00 m Span Excavation in foundation in B.C soil including lift up to 15 meter and lead upto 30 m (100 ft) and including filling, watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or i
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km (5 miles) from the side of work & including watering ,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for p
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Class-150 brick work in 1:3 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants eyc. Required for proper completion of the work.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 Using Batching Plant, transit Mixer and Manual placing (For Slab and Approach Slab)
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Cement concrete with 20mm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. As per S.I. 279(a).
12 mm thick plaster on brick work not less than 10mm with cement mortar in proportion 1:3 cement and fine sand of 1.25 F.M. including cost of all matetials labour, T& P etc. required completion of the work as per direction of the Engineer-in-charge SI
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification clauses 617. 709, 1204.3.7
Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all materials, labour, tools and plants etc. required for proper completion of work.
Providing and applying tack coat with bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.25kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom. (Before BC)
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Road Safety Providing and laying of hot appiled thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, Thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC: 35 The finished surface to be level, uniform and free from streak and holes
Providing and laying of hot appiled thermoplastic compound 15.00 mm thick including reflectorising glass beads @ 250 gms per sqm area, Thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC: 35 The finished surface to be level, uniform and free from streak and holes Bar Strip in Abadi Portion
Supply and fixing of retroreflective high intensity informatory sign board/ cautionary sign board etc. As per MoRTH specification. Stop Sign Board
Supply and fixing of retroreflective high intensity informatory sign board/ cautionary sign board etc. As per MoRTH specification.T Junction Sign Board
Supply and erection of direction and place identification retro reflctorised sign as per IRC 67 made of high intensity grade sheeting vede clause 801.30, fixed over aluminium sheeting, 2 mm. thick steel single angle iron post 75 x 75 x 6 mm. firmly fixed to the ground by means of properly designed fondation with M-15 grade cement concrete 45 x45 x 60 mm. 60 cm. below ground level as per approved drawing (informatry Borad of Size less than .9 SQM)
Supply and erection of direction and place identification retro reflctorised sign as per IRC 67 made of high intensity grade sheeting vede clause 801.30, fixed over aluminium sheeting, 2 mm. thick steel single angle iron post 75 x 75 x 6 mm. firmly fixed to the ground by means of properly designed fondation with M-15 grade cement concrete 45 x45 x 60 mm. 60 cm. below ground level as per approved drawing (informatry Borad of Size more than .9 SQM)
Providing, Fixing & Hoisting complete in position of welded built up Structure of MS Pipe medium for Single Pipe Over Head Signage comprising of vertical posts 6 Mtr. Ht. from top of the R.C.C. foundation made of 300 mm. dia. Pipe (single pole) 10 mm. MS Plate at top & bottom for bearing & horizontal frame 32 mm. N.B. (M) main Pipes & 25 mm. N.B. (M) bracing except at junctions & comers as per drawing with one cat of steel primer & two coat of synthetic enamel paint including excavation lean concrete 1:4:8 with cement coarse and approved 20 mm. grit & R.C.C. 1:2:4 as per drawing enclosed.
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick as per MORT&H specification.
Maintenance of Concrete surface including Crack Sealing spot patching including restoration of rain cuts and dressing of side slop / berms, making up of berms / shoulders.maintenance of drain, maintenance of culverts and cause ways, maintennance of guard rails and parapet.maintenance of road sign, speed breakers, standing tree at adjacent to road wherever required maintenance of 200m Stone(Hectometr) and kilometr stones, cutting of branches of trees, shurb and trimming of grass and weeds etc white whashing of parapet including CD Work,painting of guard stones, refixing of displaced guard stone (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23- 1099/113/2023 dated 16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024 subjected to approval from Govt Maintence of 1st year after completion of work @Zero % of total cost of work (Item No 01 to 83)
Maintenance cost for 2nd year @ 0.25% cost of Work (Item No 01 to 83)
Maintenance cost for 3rd year @ 0.50% cost of Work (Item No 01 to 83)
Maintenance cost for 4th year @ 0.75% cost of Work (Item No 01 to 83)
Maintenance cost for 5th year @ 1.00% cost of Work (Item No 01 to 83)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.51 MB
Tendernotice_2.pdf
PDF • 2.27 MB
Tendernotice_3.pdf
PDF • 1.42 MB
BOQ_2034088.xls
BOQ • 0.46 MB
SBD.pdf
Tender Documents • 3.68 MB
Download all tender documents and submit your bid