| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.9 CrAccepted-Finance MAIN STREET GONDER 35 VILL GONDER KARNAL HARYANA 132024 | KARNAL | KARNAL | HARYANA | 132024 | ₹1.9 Cr | 1 | Accepted-Finance L1 Bidder |
| 2 | 2₹2.4 Cr+₹47.1 L (25.0%)Rejected-Finance | ₹2.4 Cr+₹47.1 L (25.0%) | 2 | Rejected-Finance Higher than L1 Bid |
| 3 | 3₹2.4 Cr+₹51.9 L (27.5%)Rejected-Finance PLOT NO LB 137 PHASE 2 BHIMATANGI PS AIRFIELD BHUBANESWAR DIST KHURDA ODISHA 751002 | BHUBANESWAR | KHURDA | ODISHA | 751002 | ₹2.4 Cr+₹51.9 L (27.5%) | 3 | Rejected-Finance Higher than L1 Bid |
| 4 | Rejected-Technical | - | - | Rejected-Technical Disqualified in the technical bid |
| 5 | Rejected-Technical | - | - | Rejected-Technical Disqualified in the technical bid |
| Sl No | Description | Qty | Unit | SHREE SHYAM INTERNATIONAL L2 | Nabalok Das L3 | Pavee Construction L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:
All kinds of soil | 1,340 | sqm | 125 ₹1,67,500 | 75 ₹1,00,500 | 70 ₹93,800 Lowest |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
All kinds of soil | 1,706 | cum | 390 ₹6,65,340 | 185 ₹3,15,610 | 120 ₹2,04,720 Lowest |
| 3.00 | Extra for levelling & neatly dressing of disposed soil completely as directed by Engineer-in-charge. | 896 | cum | 90 ₹80,640 | 80 ₹71,680 Lowest | 100 ₹89,600 |
| 4.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 1,145 | cum | 192 ₹2,19,840 | 165 ₹1,88,925 | 100 ₹1,14,500 Lowest |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 233 | cum | 6,750 ₹15,72,750 | 7,200 ₹16,77,600 | 5,000 ₹11,65,000 Lowest |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 442 | Sqm | 390 ₹1,72,380 | 430 ₹1,90,060 | 300 ₹1,32,600 Lowest |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts | 1,250 | Sqm | 930 ₹11,62,500 | 650 ₹8,12,500 | 400 ₹5,00,000 Lowest |
| 8.00 | Centering and shuttering including strutting, propping etc. and removal of form for :
Lintels, beams, plinth beams, girders, bressumers and cantilevers | 725 | sqm | 734 ₹5,32,150 | 550 ₹3,98,750 | 500 ₹3,62,500 Lowest |
| 9.00 | Centering and shuttering including strutting, propping etc. and removal of form for all heights :
Suspended floors, roofs, landings, balconies and access platform | 50 | sqm | 925 ₹46,250 | 550 ₹27,500 | 400 ₹20,000 Lowest |
| 10.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars Grade of steel: Fe 500 | 32,400 | Kg | 104 ₹33,69,600 | 80 ₹25,92,000 Lowest | 80 ₹25,92,000 Lowest |
Tender Value
₹2.6 Cr
EMD Value
₹7.9 L
Closing Date
15 Jul 2026, 12:00 pmClosed
Senior Manager (E-C)-I
O/o Airport Director, Dibrugarh Airport, Airports Authority of India, Dibrugarh
Miscellaneous Works in Non-operational area. (SH-II_ Reconstruction of City side property wall, Provision of shed over Vehicle gate, Fixing SS Bollards, fencing grill works and other minor capital works at Dibrugarh Airport)
2026_AAI_281914_1
AAI/DIB/Engg.-Civil/Maint-I/ Misc. works Non-Ops /2026-27
Open Tender
Civil Works
Item Rate
180 days
Dibrugarh Airport
Please refer Tender documents.
12 documents required · 12 mandatory
₹1,180
₹7.9 L
3 Aug 2026
24 Jun 2026
16 Jul 2026
24 Jun 2026
15 Jul 2026
24 Jun 2026
24 Jun 2026 - 1 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:
All kinds of soil | 1,340 | sqm | 100 | ₹1,34,000 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
All kinds of soil | 1,706 | cum | 10 | ₹17,060 |
| 3 | Extra for levelling & neatly dressing of disposed soil completely as directed by Engineer-in-charge. | 896 | cum | 10 | ₹8,960 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 1,145 | cum | 10 | ₹11,450 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 233 | cum | 10 | ₹2,330 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 442 | Sqm | 10 | ₹4,420 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts | 1,250 | Sqm | 100 | ₹1,25,000 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for :
Lintels, beams, plinth beams, girders, bressumers and cantilevers | 725 | sqm | 10 | ₹7,250 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for all heights :
Suspended floors, roofs, landings, balconies and access platform | 50 | sqm | 100 | ₹5,000 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars Grade of steel: Fe 500 | 32,400 | Kg | 10 | ₹3,24,000 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
TD.pdf
Tender Documents • 13.07 MB
BOQ_328969.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .