Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.1 LAccepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹4.3 L+₹25,500 (6.28%)Accepted-Finance | 2 | Accepted-Finance L2 | |
| 3 | 3₹5.0 L+₹92,950 (22.9%)Accepted-Finance | 3 | Accepted-Finance L3 |
Tender Value
₹5.5 L
EMD Value
₹11,027
Closing Date
15 Feb 2023, 6:00 pmClosed
EEC
CTO Complex NG Road Jalandhar
Reconstruction of tilted Portion of Compound Wall from sump well up to TI Staff Qtrs Bathroom in P T Colony Pathankot
2023_BSNL_143673_1
24/EE/BSNL/CD/JL/2022-23
Open Tender
Civil Works
Item Rate
90 days
Amritsar
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
AO Cash BSNL Amritsar
₹11,027
22 Feb 2023
1 Feb 2023
17 Feb 2023
1 Feb 2023
15 Feb 2023
1 Feb 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:5:10 (1 Cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain windowsills, fillets, sunken floor, etc., up to floor five level, excluding the cost of centering, shuttering and finishing :
1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for :
Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc..
Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (Zone III) derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources).
Brick work with Cleaned F.P.S. bricks recovered from demolshing of brick work and supplied free of cost at site of work by the department in foundation and plinth complete as per the direction of Engineer-In-Charge.
Cement mortar 1:6 (1 cement : 6 coarse sand)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
Cement mortar 1:6 (1 cement : 6 coarse sand)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :
Cement mortar 1:6 (1 cement : 6 coarse sand)
12 mm cement plaster of mix :
1:6 (1 cement: 6 fine sand)
15 mm cement plaster on the rough side of single or half brick wall of mix :
1:6 (1 cement: 6 fine sand)
6 mm cement plaster on the RCC of mix :
1:3 (1 cement: 3 fine sand)
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:
New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
In cement mortar
Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured) :
From brick work in cement mortar
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading,transporting, unloading to approved municipal dumping ground or asapproved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Fixing of grill on Compound wall in line and level after straightening includung welding where ever required and scaffolding etc all complete as per the directions of Engineer in Charge ( MS grill will be supplied by the deparerment free of cost and cement concrete blocks shall be paid for seperately).
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.
With G.I. barbed wire
M/s. Vijay Kumar Govt. Contractor
vikram sachdeva
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .