Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.7 LAccepted-AOC M 46 HOUSING BOARD UNIT MATHAYANKUTTAI METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | 1 | Accepted-AOC L1 | |
| 2 | 2₹10.9 L+₹41,832.50 (3.99%)Rejected-AOC 5 12C 1A STATE BANK QUARTERS BACKSIDE METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | 2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹11,800
Closing Date
22 Nov 2023, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I MP Unit I Complete inspection of Mill internals reconditioning renewal of worn out parts and bearings etc in Mills 1C and 1E
2023_EB_387138_1
CE / MTPS-I / SE/ M-I /MP/OT.331 /2023-24
Open Tender
Power/Energy Projects/Products
Works
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹11,800
Yes
24 Mar 2025
8 Nov 2023
23 Nov 2023
8 Nov 2023
22 Nov 2023
8 Nov 2023
Amount
Charges for arresting the coal pipe firmly, dismantling victaulic coupling and lowering down the mill outlet elbows to 4.5 m. floor including charges for scaffolding.
Charges for inspection of mill outlet elbows and changing the deflector block if any lifting the elbows and assembling with proper alignment with the existing pipe line and removing coal pipe supports and devolution of scraps to stores.
Charges for dismantling the centre feed pipe, spool pieces, multiple port outlet bodies and transition pipes 4 Nos. each after assembling the coal pipe inspection with center feed pipe structures including transportation of supporting material from stores to site and re-fixing the Spool piece, MPO bodies and transition pieces and assembling to its original position and carrying out necessary related works. and devolution of scraps to stores etc. for a mill.
Charges for Dismantling of separator body top along with classifier assembly and reassembling the separator body top as per direction of engineer in charge. This includes making the fixture for lifting arrangements, lead, lift retaping and cleaning the threaded holes in the flange etc.
Charges for Dismantling of bowl hub with bowl from the vertical shaft and assembling new bowl and bowl hub as per the direction of engineer in charge. This includes making necessary fixture and supporting for lifting arrangements and lead, lift and transporting of materials from stores, reaming of holes in the bowl and bowl hub etc.
Charges for gas heating the bowl and bowl hub assembly using 3 Nos. cutting set in order to expand the bowl hub for releasing it from the vertical shaft and also providing ice bag in the vertical shaft above the upper radial bearing to cool the shaft portion.
Charges for dismantling the triangular liners, cutting the bulged Mill bottom plate, applying refractory cement at the Mill bottom plate 1 set by providing bolts and welding
Charges for cleaning the gearbox internals like worm shaft and worm wheel. Draining the cooling water from cooling coil, cleaning and inspection of worm wheel teeth, cleaning the cooling coil and reconditioning the coil. Arresting the leakages in the water line, assembling back the cooling coil covers, filling the gearbox oil up to normal level.
Charges for removing the old coupling halves from the motor and worm shaft ends. The charges includes gas heating the new/old coupling halves in the motor shaft and worm shaft and assembling the new/ old coupling in motor shaft and worm shaft.
Charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing and reassembling the new / old radial bearing in the new/old radial bearing housing and assembling the new/old pump hub and bushing.
Charges for dismantling of upper bearing housing cover with bearing housing, removing the vertical shaft along with upper radial bearings, lower bearings, worm wheel, dismantling of worn out worm wheel and changing new worm wheel and inserting the vertical shaft after inspecting the bearings, providing wedges for the vertical shaft lock nut and fitting as per direction of engineer in charge. This includes making suitable fixture for lifting arrangements
Charges for Dismantling of mill bottom after removing broken M 24 size –16 Nos. bolt by drilling / gouging, tapping all the holes and assembling as per the direction of Engineer in charge. This includes making necessary fixture and supporting for lifting arrangements and lead, lift and transporting of materials from stores, reaming of holes in the mill bottom etc.
Charges for dismantling of Gear housing cover with Upper bearing housing and if necessary to replace the broken M24 studs completely removing, tapping all the holes and assembling back.
Charges for cleaning, surface, edge preparation, metal filling, cutting MS plate to the required size 300x300x40mm thick, and welding the gap in between mill base and MS Plate.
Charges for pre heating and welding the cracked portion of mill base and gear housing outside the mill near reject chute mouth area.
Charges for Removal of worn out / eroded side liner assembly and top liners, air intake vanes, etc. and assembling new liners including drawl of new liners from stores and devolution of old liners to stores.
Cost of MS Welding electrodes
Cost of 3 mm non metallic gasket
Cost of Special welding electrode make ESAB- 802
Cost of Cutting gas
Cost of Style 113 Graphite PTFE packing rings
Charges for consumables and T & Ps
RAMASAMY ENGINEERING
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .