Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L1 | Accepted-AOC Lowest tender accepted | |
| 2 | L2₹5.9 L+₹1,400 (0.24%)Rejected-Finance | L2 | Rejected-Finance Other than lowest tender | |
| 3 | L3₹5.9 L+₹4,100 (0.70%)Rejected-Finance WZ 346 E IIND FLOOR NEAR SALVAGE PARK NANGAL RAYA NEW DELHI 110046 | NEW DELHI | DELHI | 110046 | L3 | Rejected-Finance Other than lowest tender | |
| 4 | L4₹5.9 L+₹4,200 (0.72%)Rejected-Finance | L4 | Rejected-Finance Other than lowest tender | |
| 5 | L5₹5.9 L+₹5,500 (0.94%)Rejected-Finance | L5 | Rejected-Finance Other than lowest tender |
Tender Value
₹5.9 L
Closing Date
21 Mar 2020, 6:00 pmClosed
GE UTILITY PLANT AND MACHINERY DELHI CANTT-10
GE UTILITY PLANT AND MACHINERY KIRBY PLACE DELHI CANTT-10
COMPREHENSIVE MAINT OF LAN SYSTEM AT E-IN-Cs BRANCH ,ARMY HQ, NEW DELHI
2020_MES_332103_1
GE(U)/PM/3011/B/JO/R-242/E3
Limited
Miscellaneous Works
Piece-work
180 days
Delhi Cantt
PLEASE REFER NOTICE INVITING QUOTATION
1 document required · 1 mandatory
₹0
Exempted
13 May 2020
6 Mar 2020
23 Mar 2020
9 Mar 2020
21 Mar 2020
9 Mar 2020
Amount
Administration of LAN Infrastructure of 08 Nos Servers ,configuration of connected 71 Nos Layer-2/ Layer-3 switches and LAN lines from Servers till 517 Nos Computers/Laptops at Automation Cell, E-in-C’s Branch (Three Persons Only) DURATION OF AMC WOULD BE FOR SIX MONTHS Scope of Work: (a) Repair and maintenance of software/hardware of 08 Nos Servers mentioned at Para 2(a) below. (b) Configuration , maintenance and upkeep of 71 Nos Layer-2/Layer-3 Switches including hardware connection of LAN lines originating from/terminating to the side switches. (c ) Maintenance and upkeep of LAN lines between 08 Nos Servers,71 Nos Layer-2/Layear-3 Switches and 517 Nos computers/Laptops. (d) Any service required for replacement of spares (Spares will be supplied by the department free for fixing)The details of Servers , Switches and Computers/Laptops at different locations are as mentioned Below:- (a) The Details of Servers ,Configuration and deployment is as mentioned below:- mentioned Below:- WSUS Server PC Nos - 01 Intel Processor [email protected] RAM 4 GB, 500 GB Hard Disc Drive OS- Window Server 12 R2 Make : Dell optiplex 9020 (ii) FTP Server PC Nos - 01 Intel Processor [email protected] RAM 4 GB, 500 GB Hard Disc Drive OS- Window Server 12 R2 Make : Dell optiplex 9020
(iii ) Antivirus Server (Trend Micro) Nos - 01 Intel Processor [email protected] RAM 4 GB, 500 GB Hard Disc Drive OS- Window Server 12 R2 Make : Dell optiplex 9020 (iv) Sarvatra e-Office Server PC Nos - 01 Intel Processor [email protected] RAM 4 GB, 500 GB Hard Disc Drive OS- Window Server 12 R2 Make : Dell optiplex 9020 (v) Domain Controller,PDC and ADC Nos - 01 Intel Processor [email protected] RAM 4 GB, 500 GB Hard Disc Drive OS- Window Server 12 R2 Make : Dell optiplex 9020 (vi) e-Mail Server PC Nos – 01 Intel Processor [email protected] RAM 4 GB, 500 GB Hard Disc Drive OS- Window Server 12 R2 Make : Dell optiplex 9020 (vii) E1B Server Nos – 01 Intel Processor [email protected] RAM 4 GB, 500 GB Hard Disc Drive OS- Window Server 12 R2 Make : Dell optiplex 9020
(viii) MP VIP Server MIS Civ Nos – 01 Intel Processor [email protected] RAM 4 GB, 500 GB Hard Disc Drive OS- Window Server 12 R2 Make : Dell optiplex 9020 (b)The details of 71 Nos Switches for configuration within the LAN Infrastructure is as mentioned below :- (i) Cisco Catalyst 2960-48TC-L-2 Switch - 13 Nos (ii) Cisco Catalyst 2960-24TC-L-2 Switch -13 Nos (iii) D-Link Switch 16 Port - 20 Nos (iv) D- Link Switch 8 Port - 20 Nos (V) L3 Managed Switchs - 01 No (vi) Unmanaged L2 Switchs (E1B) - 02 Nos (Vii) L2 Managed Switches for Leased Line - 02 Nos (c )The Dte wise details of Desktop Computers/Laptops till which the LAN lines originating from Servers mentioned at para 2(a) above are to be administered and maintained are as mentioned below:- (a) Dte wise PCs Details :- (i) E-in-C’s Sectt – 15 Nos (ii) Coord&PersDte – 91 Nos (iii) WksDte - 156 Nos (iv) PersDte - 67 Nos (v) E1B LAN – 25 Nos (vi) ESP Dte - 30 Nos (vii) New PC – 56 Nos (viii) Lap tops – 12 Nos (iX) Leased Line PCs- 65 Nos
(b) Configuration of above mentioned Desktop/Laptop (i) OS – Win 8.1, Win 8, Win 7, Win Vista, Boss/Ubuntu Linux (ii) Processor – P4 , Dual Core, Core 2 Duo Core i3, Core i5 Note : (a) Contractor is advised to visit the site of work to assess the scope of work before quoting their rates. (b) Administration of LAN Network System is five days in a weak from 0800 to 0500 Hrs (08 Hrs per day) (c) The system administrator must be present in E-in-C's branch during all working hours on all working days. (d) The Net work administrator must have thorough knowledge of OSI- Model of networking ans should be able to program and configure Layer-2, Layer-3 switches deployed in E-in-C's branch. (e) The Net work administrator must also be well versed with Domain controlles and be able to configure and implement domain policies and settings and troubleshoot any problems arising out of it. (f) The Network admin would be responsible for maintenance of physical connectivity fron the server to all nodes of the network. Any connectivity issues will also be dealt with by system administrator. (g) The Network admin must deploy at least one Microsoft Server 2012 R2 and above certified professional /CCNP certified professional on site along with an assistant in E-in-C's branch during all working hours and all working days. Prior intimation and replacement must be provided in case of any emergency. (h) In the event that services of the Network admin are found to be not up to the mark, the contract is liable for fore closure and remaining work would be carried at the risk and cost of the said contractor. (i) Contractor is advised to visit the site of work to assess the scope of work before quoting their rates. (j) The work will be carried out at a restricted area with in restricted working hours. (k) Any personal visiting on-site must possess a police verification certificate and daily attendance register must be maintained . (l) Attendance register must be maintained at site and the same would be put up to Engr-in-Charge on a monthly basis. If the administrator is absent without prior intimation, penalty of 1000/- per day shall be be charged.
M/s U F F CON
ANAND ASSOCIATES
Nakul Enterprises
Trade Link
Tushar Enterprises
DUBEY ENTERPRISES
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
finance_371413.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .