| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.6 LRejected-Finance NOCHIPALAYAM AUTHUR PO KARUR 2 | ₹19.6 L | L1 | Rejected-Finance Due to Administrative Reason |
| 2 | L2₹20.7 LRejected-Finance | ₹20.7 L | L2 | Rejected-Finance Due to Administrative Reason |
| 3 | L3₹20.8 LRejected-Finance 002 1 NATHAKADU SRI MAHALAKSHMI DYEING PRINTING MILLS CAMPUS BHAVANI MAIN ROAD ERODE 638004 | ERODE | ERODE | TAMIL NADU | 638004 | ₹20.8 L | L3 | Rejected-Finance Due to Administrative Reason |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | K.SELVARAJ L1 | Sathish Kumar & Co L2 | Vidhyut Nirman Corporation L3 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing and removal of slipped earth boulders away from the site including cost of all materials lead, lift and labour charges etc complete. | 222 | One cubic metre only 1 m3 | 300 ₹66,600 | 400 ₹88,800 | 350 ₹77,700 |
| 2.00 | Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B including cost of all materials lead, lift and labour charges etc complete. | 29.6 | One cubic metre only 1 m3 | 200 ₹5,920 | 360 ₹10,656 | 350 ₹10,360 |
| 3.00 | Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting- including cost of all materials lead, lift and labour charges etc complete. | 22.5 | One cubic metre only 1 m3 | 300 ₹6,750 | 517 ₹11,632.5 | 500 ₹11,250 |
| 4.00 | Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in medium rock and dense medium rock not requiring blasting- including cost of all materials lead, lift and labour charges etc complete. | 22.5 | One cubic metre only 1 m3 | 400 ₹9,000 | 800 ₹18,000 | 525 ₹11,812.5 |
| 5.00 | Drilling holes of 40 mm dia – 0.90 m deep in Hard granite surface, fabrication and fixing 25 mm dia RTS grip rods inside the drill holes for Anchor rods and above ground level of total length of (0.90+0.90)=1.80m in all length grouting the same with cement slury or resin capsules including cost of rod all materials, lead, lift, labour charges etc complete., as directed by Engineer in charge drawing and specification. | 84 | One number only 1 No | 676 ₹56,784 | 804 ₹67,536 | 650 ₹54,600 |
| 6.00 | Filling the foundation with M- sand with watering proper consolidation including cost of all materials, lead, lift, labour charges etc., complete. | 7 | One cubic metre only 1 m3 | 1,680 ₹11,760 | 2,000 ₹14,000 | 1,250 ₹8,750 |
| 7.00 | Providing and laying PCC 1:3:6 mix using 40mm HBG metal cost of all materials, lead, lift, necessary curing etc., complete complying with standard specification. | 11 | One cubic metre only 1 m3 | 6,381 ₹70,191 | 6,600 ₹72,600 | 7,000 ₹77,000 |
| 8.00 | Providing and laying PCC 1:2:4 mix using 40mm 12-20mm HBG metal cost of all materials, lead, lift, necessary curing etc., complete complying with standard specification as directed by Engineer-in-charge. | 6 | One cubic metre only 1 m3 | 8,230 ₹49,380 | 7,000 ₹42,000 | 8,250 ₹49,500 |
| 9.00 | Providing and laying RCC 1:2:4 mix using 12 to 20mm HBG Metals cost of all materials, lead,lift, curing, labour charges etc., complete
Up To 3.00 M Height
A) Base Slab ( Without Form Work ) | 22.5 | One cubic metre only 1 m3 | 10,100 ₹2,27,250 | 10,000 ₹2,25,000 | 11,000 ₹2,47,500 |
| 10.00 | Providing and laying RCC 1:2:4 mix using 12 to 20mm HBG Metals cost of all materials, lead,lift, curing, labour charges etc., complete
Up To 3.00 M Height
B) Stem Wall (with Form Work) | 32 | One cubic metre only 1 m3 | 17,000 ₹5,44,000 | 15,100 ₹4,83,200 | 17,000 ₹5,44,000 |
Tender Value
Refer Docs
EMD Value
₹29,700
Closing Date
14 Oct 2025, 2:00 pmClosed
SE/C/HP/ERODE
955, EVN Road, Erode
Construction of RCC Protection wall at the earth slipped area at 14th hair pin bend along the road leading from Kadamparai Arch to Kadamparai Power House and 3rd Bend from Anna statue to Punachi Power House at at Upper Aliyar Dam
2025_EB_610090_1
SECHPERDKadGenCircle01202526
Open Tender
Civil Works
KADAMPARAI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹29,700
29 Jan 2026
29 Sept 2025
15 Oct 2025
29 Sept 2025
14 Oct 2025
29 Sept 2025
Clearing and removal of slipped earth boulders away from the site including cost of all materials lead, lift and labour charges etc complete.
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B including cost of all materials lead, lift and labour charges etc complete.
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting- including cost of all materials lead, lift and labour charges etc complete.
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in medium rock and dense medium rock not requiring blasting- including cost of all materials lead, lift and labour charges etc complete.
Drilling holes of 40 mm dia – 0.90 m deep in Hard granite surface, fabrication and fixing 25 mm dia RTS grip rods inside the drill holes for Anchor rods and above ground level of total length of (0.90+0.90)=1.80m in all length grouting the same with cement slury or resin capsules including cost of rod all materials, lead, lift, labour charges etc complete., as directed by Engineer in charge drawing and specification.
Filling the foundation with M- sand with watering proper consolidation including cost of all materials, lead, lift, labour charges etc., complete.
Providing and laying PCC 1:3:6 mix using 40mm HBG metal cost of all materials, lead, lift, necessary curing etc., complete complying with standard specification.
Providing and laying PCC 1:2:4 mix using 40mm 12-20mm HBG metal cost of all materials, lead, lift, necessary curing etc., complete complying with standard specification as directed by Engineer-in-charge.
Providing and laying RCC 1:2:4 mix using 12 to 20mm HBG Metals cost of all materials, lead,lift, curing, labour charges etc., complete Up To 3.00 M Height A) Base Slab ( Without Form Work )
Providing and laying RCC 1:2:4 mix using 12 to 20mm HBG Metals cost of all materials, lead,lift, curing, labour charges etc., complete Up To 3.00 M Height B) Stem Wall (with Form Work)
Providing and laying RCC 1:2:4 mix using 12 to 20mm HBG Metals cost of all materials, lead,lift, curing, labour charges etc., complete Upto 3 meter to 6 m height A) Base Slab ( Without Form Work)
Providing and laying RCC 1:2:4 mix using 12 to 20mm HBG Metals cost of all materials, lead,lift, curing, labour charges etc., complete Upto 3 meter to 6 m height B) Stem ( Wall with Form Work)
Supplying and laying in position of RTS/TMT rods for reinforcement including transporting, cutting charges, bending, tying including cost of all materials lead, lift, labour charges etc., complete.
Supplying and fixing 110m dia PVC pipe for weep hole including cost of cutting and fixing in PCC wall, cost of all materials, labour, lead, lift etc., complete.
Supply of rubble and back filling the available earth 60% with rubble 40% including cost of consolidation by watering by layer by layer including cost of all materials, labour, lead, lift etc., complete.
Sathish Kumar & Co (BID ID -1485483)
Vidhyut Nirman Corporation (BID ID -1486660)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid