Loading…
Loading…
Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAccepted-Finance NO 28 A SUNTHARA VINAYAGAR KOVIL STREET PALAYAPETTAI GANDHI NAGAR POST TIRUNELVELI 627 008 | TIRUNELVELI | TIRUNELVELI | TAMIL NADU | 627008 | L1 | Accepted-Finance L1 | |
| 2 | L2₹4.0 Cr+₹51.3 L (14.7%)Rejected-Finance NO 137 TRICHY MAIN ROAD PIDAGAM POST VILLUPURAM TK 605 401 | VILLUPURAM | VILLUPURAM | TAMIL NADU | 605401 | L2 | Rejected-Finance L2 | |
| 3 | L3₹4.1 Cr+₹62.6 L (18.0%)Rejected-Finance D NO 271D3 5 ANDAL NAGAR K R NAGAR NALATINPUTHUR KOVILPATTI TK 628 716 | KOVILPATTI | TUTICORIN | TAMIL NADU | 628716 | L3 | Rejected-Finance L3 | |
| 4 | Rejected-Technical 5 255 1 EB COLONY SALAIPUDUR KOVILPATTI 628 503 | KOVILPATTI | THOOTHUKUDI | TAMIL NADU | 628503 | - | Rejected-Technical BQR condition not satisfied |
| Sl No | Description | Qty | Unit | Sp Constructions L1 | K Rajkumar L2 | S CHELLADURAI CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing scrub jungle and dispose them away from the site including cost of lead, lift etc., complete | 5,000 | Sqm | 1.4 ₹7,000 Lowest | 5.11 ₹25,550 | 3 ₹15,000 |
| 2.00 | Earth work excavation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth, earth mixed with small size boulders and hard gravelly soilincluding initial lead of 10m and lift of 2m | 522 | Cum | 104 ₹54,288 Lowest | 231 ₹1,20,582 | 144 ₹75,168 |
| 3.00 | In soft disintegrated rock, laterite not requiring blasting.including initial lead of 10m and lift of 2m | 174 | Cum | 115 ₹20,010 Lowest | 251 ₹43,674 | 195 ₹33,930 |
| 4.00 | In medium rock and dense medium rock requiring blasting including initial lead of 10m and lift of 2m | 174 | Cum | 200 ₹34,800 Lowest | 301 ₹52,374 | 450 ₹78,300 |
| 5.00 | In hard rock measured in solid including blasting and stacking including initial lead of 10m and lift of 2m | 696 | Cum | 300 ₹2,08,800 | 501 ₹3,48,696 | 240 ₹1,67,040 Lowest |
| 6.00 | Removing hard rock by wedging, chiseling and trimming to proper shape where blasting is prohibited including initial lead of 10m and lift of 2m | 174 | Cum | 500 ₹87,000 | 1,001 ₹1,74,174 | 1 ₹174 Lowest |
| 7.00 | Providing anti-termite treatment in 4 stages (I). immediately after earthwork excavation and before laying foundation concrete. (ii). after refilling for sides of foundation. (iii). Before laying of flooring concrete and (iv). outside of basement up to 1m alround the building using termite 250ml for 5 litres of water. | 192 | Sqm | 50 ₹9,600 Lowest | 101 ₹19,392 | 90 ₹17,280 |
| 8.00 | Supplying and filling of M sand in foundation and basement with well watering and consolidation as per STD specification including cost of materials, lead, lift, etc., complete. | 25 | Cum | 1,000 ₹25,000 Lowest | 1,601 ₹40,025 | 1,600 ₹40,000 |
| 9.00 | PCC 1:3:6 mix using 40mm HBG machine crushed metal for foundation without form work including cost of labour materials, lead, lift, curing etc., complete. | 28 | Cum | 4,500 ₹1,26,000 Lowest | 6,001 ₹1,68,028 | 5,700 ₹1,59,600 |
| 10.00 | PCC 1:3:6 mix using 20mm HBG machine crushed metal for foundation without form work including cost of labour materials, lead, lift, curing etc., complete. | 417 | Cum | 4,200 ₹17,51,400 Lowest | 6,501 ₹27,10,917 | 6,000 ₹25,02,000 |
Tender Value
Refer Docs
EMD Value
₹3.8 L
Closing Date
23 Mar 2026, 12:00 pmClosed
CE/TP SO/Madurai
CE/TP SO/Madurai
Construction Control room building establishment 110 KV SS at Gangaikondan SIPCOT premises
2026_EB_673979_1
CE/TP SO/MDU Specn.No.024/2025-26
Open Tender
Civil Works - Others
Works
180 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3.8 L
2 Jul 2026
12 Mar 2026
24 Mar 2026
12 Mar 2026
23 Mar 2026
12 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing scrub jungle and dispose them away from the site including cost of lead, lift etc., complete | - | Sqm | - | - |
| 2 | Earth work excavation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth, earth mixed with small size boulders and hard gravelly soilincluding initial lead of 10m and lift of 2m | - | Cum | - | - |
| 3 | In soft disintegrated rock, laterite not requiring blasting.including initial lead of 10m and lift of 2m | - | Cum | - | - |
| 4 | In medium rock and dense medium rock requiring blasting including initial lead of 10m and lift of 2m | - | Cum | - | - |
| 5 | In hard rock measured in solid including blasting and stacking including initial lead of 10m and lift of 2m | - | Cum | - | - |
| 6 | Removing hard rock by wedging, chiseling and trimming to proper shape where blasting is prohibited including initial lead of 10m and lift of 2m | - | Cum | - | - |
| 7 | Providing anti-termite treatment in 4 stages (I). immediately after earthwork excavation and before laying foundation concrete. (ii). after refilling for sides of foundation. (iii). Before laying of flooring concrete and (iv). outside of basement up to 1m alround the building using termite 250ml for 5 litres of water. | - | Sqm | - | - |
| 8 | Supplying and filling of M sand in foundation and basement with well watering and consolidation as per STD specification including cost of materials, lead, lift, etc., complete. | - | Cum | - | - |
| 9 | PCC 1:3:6 mix using 40mm HBG machine crushed metal for foundation without form work including cost of labour materials, lead, lift, curing etc., complete. | - | Cum | - | - |
| 10 | PCC 1:3:6 mix using 20mm HBG machine crushed metal for foundation without form work including cost of labour materials, lead, lift, curing etc., complete. | - | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 0.19 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_810109.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .