Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹48.3 L
EMD Value
₹98,000
Closing Date
25 Aug 2025, 9:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Karnataka Power Corporation Limited
SHAIKH FEROZ ALI
Work of Erection and Dismantling of Cuplok scaffolding system and water washing & descaling of furnace walls, PLSH coils and RH coils of 4 x 210 MW U-1 to 4 boilers
KPCL/2025-26/PS/WORK_INDENT3325
KPCL/2025-26/PS/WORK_INDENT3325
Open
Power stations
Two Tender Document System(Two Cover)
KPCL Executive Engineer BM1 Office RTPS Raichur
4 documents required · 0 mandatory · 4 optional
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
Proposals for subcontracting components of works amounting to more than 20% of the contract price (for each, the qualifications and experience of the identified sub-contractor in the relevant fields should be attached)
The intending bidder should have satisfactorily completed, as a prime contractor, at least one similar works such as Works of Erection and Dismantling of Cup lock scaffolding system and water washing & descaling of furnace walls, PLSH coils and RH coils of 210 MW boilers or above units of value not less than Rs. 24.5 Lakhs in the last five years (i.e., 2020-21, 2021-22, 2022-23, 2023-24 & 2024-25) in any Thermal Power Stations of 210MW or above capacity Units. As a proof of this, the bidder should upload Work Done Certificate issued by officers not less than the rank of Chief Engineer or equivalent of Thermal Power station of 210MW or above or equivalent rank in support of his experience. (Work done of previous years shall be given weightage of 10% per year to bring them to the present price level of the financial year 2025-26).
The intending bidder should be an authorized special class Boiler Repairer. As a proof of this, bidder should upload the Valid Certificate issued by competent authority of Govt. of Karnataka State, (If the Certificate is from any other state, same shall be endorsed by the competent authority of Govt. of Karnataka State).
The intending bidder, in his name should have achieved minimum annual financial turnover of Rs. 49 Lakhs in at least two financial years during the last five years. (i.e., 2020-21, 2021-22, 2022-23, 2023-24 & 2024-25). As a proof of this, the bidder shall upload the certified copy of Profit & Loss Account or Turn over Certificate duly certified by the Chartered Accountant. (Financial turnover of previous years shall be given weightage of 10% per year to bring them to the present price level of the financial year 2025-26)
₹1,210
₹98,000
11 Aug 2025
11 Aug 2025
27 Aug 2025
23 Aug 2025
Work of Erection and Dismantling of Cuplok scaffolding system and water washing & descaling of furnace walls, PLSH coils and RH coils of 4 x 210 MW U-1 to 4 boilers
Loading,Transportation of scaffolding materials from stores to site and placing at 9 mtr and 40 mtr elevation of boiler. ---- Bidders are requested to go through the Bid document
Erection of base of scaffolding at 9 mtr level neck ---- Bidders are requested to go through the Bid document
Erection of cuploks structure and platforms above base from 9 mtr level to 50 mtr level all around the furnace including approach ladders (For one tier erection) ---- Bidders are requested to go throu...
Erection & dismantling of cuploks structure and full working platforms at around 35 mtr and 48 mtr of the furnace including approach ladders (For one tier erection) ---- Bidders are requested to go th...
Shifting /changing/erection in the existing erected tiers between erection and dismantling period as per site requirement of different works. ---- Bidders are requested to go through the Bid document
Dismantling of cuploks structure and platforms above base from 9 mtr level to 50 mtr level all around the furnace including approach ladders. (For one tier erection) ---- Bidders are requested to go ...
Dismantling of base of scaffolding at 9 mtr level neck ---- Bidders are requested to go through the Bid document
Loading, Transportation of scaffolding materials from site to stores to site and placing at designated area ---- Bidders are requested to go through the Bid document
Water washing and Descaling of furnace 4 sides of water wall, 4 burner panels and roof tubes using high pressure furnace water wash pump. Rate calculated considering 5 walls(4SideWalls+1RoofWalls) an...
Water washing and descaling of complete 29 Nos of PLSH coils and 59 Nos. of RH coils using high pressure furnace water wash pump. Rate calculated considering 8 Shifts. Per Boiler. ---- Bidders are re...
Water washing and descaling of rear arch area and extended water wall using high pressure furnace water wash pump. Rate calculated considering 6 Shifts. Per Boiler ---- Bidders are requested to go th...
Cleaning of slag /ash on cuplok platform at all elevation and all around the furnace. Per Boiler ---- Bidders are requested to go through the Bid document
Hire Charges for High Pressure Water Pump. Per Shift ---- Bidders are requested to go through the Bid document
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
04 bid document_cuplok 2025-26.docx
Tender Document • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .