| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.8 LAccepted-AOC | ₹80.8 L Quoted ₹81.5 L | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹86.8 L+₹5.3 L (6.45%)Rejected-Finance | ₹86.8 L+₹5.3 L (6.45%) | L2 | Rejected-Finance NOT L1 |
| 3 | L3₹1.0 Cr+₹21.0 L (25.8%)Rejected-Finance HOUSE NO 2 4 136 LINGREDDY MANSION BLOCK NO IV OPP HANUMAN TEMPLE TADBUND SECUNDERABAD 500009 | SECUNDERABAD | HYDERABAD | TELANGANA | 500009 | ₹1.0 Cr+₹21.0 L (25.8%) | L3 | Rejected-Finance NOT L1 |
| 4 | L4₹1.1 Cr+₹32.2 L (39.5%)Rejected-Finance BALLIA UTTAR PRADESH | BALLIA | UTTAR PRADESH | 221701 | ₹1.1 Cr+₹32.2 L (39.5%) | L4 | Rejected-Finance NOT L1 |
Tender Value
₹76 L
EMD Value
₹1.4 L
Closing Date
2 Apr 2021, 6:00 pmClosed
CWE (ARMY) SECUNDERABAD
CWE (ARMY) MUDFORT COMPLEX, SECUNDERABAD- 500003
PROVISION OF SEWAGE TREATMENT PLANT(STP) OF 80 KLD AT CTW, MCEME UNDER GE(UIILITY) SECUNDERBAD
2021_MES_419355_1
CWE(S)/UTILITY/TOKEN-28 OF 2020-2021
Open Tender
Electrical and Maintenance Works
Lump-sum
270 days
Secunderabad
As per NIT
6 documents required · 6 mandatory
₹1,000
GE (Utility) Secunderabad
₹1.4 L
Yes
12 May 2021
5 Feb 2021
5 Apr 2021
5 Feb 2021
2 Apr 2021
12 Mar 2021
Amount
Schedule 'A' Part I This Schedule is not pre-priced by MES and the prepriced rate has not been indicated in column No 5 and shall be treated as Rs 0.00 indicates this fact only.The tenderer is required to quote their rates in Col 7.
Lump sum price worked out by the tenderer for "Construction of Building for Pump house in single storey with RCC framed structure complete all as shown on drawings and as specified " NOTE:- The lumpsum price to be quoted by the Contractor.
Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part-II Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs. 19,167.73 inserted by the MES in Schedule ‘A’ Part-II
Lump sum price worked out by the Contractor for “EXTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part-III Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs.1,30,542.83 inserted by the MES in Schedule ‘A’ Part-III
Lump sum price worked out by the Contractor for ROAD/PATH ” as listed in Schedule‘A’ Part-IV Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs.30,425.53 inserted by the MES in Schedule ‘A’ Part-IV
Lump sum price worked out by the Contractor for SEWAGE DISPOSAL ” as listed in Schedule‘A’ Part-IV Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs.2,34,840.77 inserted by the MES in Schedule ‘A’ Part-V
Lump sum price worked out by the Contractor for STP-(CIVEL WORKS) ” as listed in Schedule‘A’ Part-IV Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs.19,17,862.62 inserted by the MES in Schedule ‘A’ Part-VI
Lump sum price worked out by the Contractor for MISCELLANEOUS CIVEL WORKS (STP)” as listed in Schedule‘A’ Part-IV Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs.3,54,981.30 inserted by the MES in Schedule ‘A’ Part-VII
Lump sum price worked out by the Contractor for “EXTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part-V Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs.35,649.80 inserted by the MES in Schedule ‘A’ Part-VIII
Schedule 'A' Part IX (STP) This Schedule is not prepriced by MES and the prepriced rate has not been indicated in column No 5 and shall be treated as Rs 0.00 indicates this fact only.The tenderer is required to quote their rates in Column 7. This Schedule consists of items Serially numbered as 9.01
Rate for item No. 1 as listed in Schedule 'A' Part -IX (STP)
Schedule 'A' Part X (MISCELLANEOUS) This Schedule is not prepriced by MES and the prepriced rate has not been indicated in column No 5 and shall be treated as Rs 0.00 indicates this fact only.The tenderer is required to quote their rates in Column 7. This Schedule consists of items Serially numbered as 10.01 to 10.33
Rate for item No. 1 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 2 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 3 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 4 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 5 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 6 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No.7 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No.8 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 9 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 10 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 11 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 12 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 13 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 14 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 15 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 16 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 17 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 18 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 19 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 20 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 21 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 22 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 23 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 24 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 25 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 26 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No.27 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 28 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 29 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 30 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 31 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 32 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 33 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
POWER CONSTRUCTION COMPANY
omsai thermax engineers
Chandel Construction Company
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .