Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹50 L
Closing Date
28 Jul 2026, 11:00 am3d left
ANURANJAN KUMAR
8th Floor, CPC, BHEL Sadan, Noida
EPC PACKAGE FOR COAL HANDLING PLANT and BIOMASS HANDLING PLANT AT 3x800MW, NLC TALABIRA THERMAL POWER PROJECT, JHARSUGUDA, ODISHA
2026_BHEL_60708_1
BHEL/CPC/ TLB/EPC_CHP/27/013
Open Tender
Power/Energy Projects/Products
EPC Contract
1620 days
Talabira
As per Annexure-I of NIT
8 documents required · 8 mandatory
₹0
₹50 L
CPC VC ROOM
28 Jul 2026
2 May 2026
28 Jul 2026
2 May 2026
28 Jul 2026
2 May 2026
2 May 2026 - 9 May 2026
7 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | TOTAL PRICE FOR total scope of work for subject tender ref no. BHEL/CPC/TLB/EPC_CHP/27/013 for
EPC PACKAGE FOR COAL HANDLING PLANT and BIOMASS HANDLING PLANT AT 3x800MW, NLC TALABIRA THERMAL POWER PROJECT, JHARSUGUDA, ODISHA | 1 | Total Price Excluding GST | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.07 MB
Tendernotice_1.pdf
PDF • 0.98 MB
5. 18.01.2021_18A03-DWG-M-002A Rev1 08.01.2021.dwg
Additional Documents • 41.63 MB
6. 11.02.2022_Corrigendum-30_09.02.2022.pdf
Additional Documents • 0.93 MB
7. 06.03.2021_Corr-8-Opt.pdf
Additional Documents • 19.03 MB
7. 06.03.2021_Talabira_Revised Plot Plan_09.03.21.rar
Additional Documents • 19.82 MB
Part-8 to 12_10. 22.03.2021_Corrigendum-10_20.03.2021.pdf
Additional Documents • 1.58 MB
Part-8 to 12_11. 22.04.2021_Corrigendum-12.pdf
Additional Documents • 3.94 MB
Part-8 to 12_11. 22.04.2021_Corrigendum-13.pdf
Additional Documents • 1.26 MB
Part-8 to 12_12. 26.04.2021_Corrigendum-14_26042021.pdf
Additional Documents • 3.18 MB
Part-8 to 12_8. 08.03.2021_Corrigendum-9_06.03.2021.pdf
Additional Documents • 0.53 MB
Part-8 to 12_9. 10.03.2021_Talabira-Site Grading Layout_10.03.2021.rar
Additional Documents • 7.59 MB
13. 13.05.2021_5A.18A03-DWG-M-002A-R3 06.05.21.dwg
Additional Documents • 40.14 MB
13. 13.05.2021_Conversion.txt
Additional Documents • 0.00 MB
13. 13.05.2021_Corrigendum 15-12.05.2021.pdf
Additional Documents • 15.24 MB
13. 13.05.2021_dwgviewr.err
Additional Documents • 0.00 MB
13. 13.05.2021_plot.log
Additional Documents • 0.00 MB
TCC_Annexure-1to7_Annexure-01- Project information.pdf
Other Document • 0.41 MB
TCC_Annexure-1to7_Annexure-02 Combined.pdf
Other Document • 0.90 MB
TCC_Annexure-1to7_Annexure-03 Combined Electrical and CI Scope.pdf
Other Document • 4.02 MB
TCC_Annexure-1to7_Annexure-04 Plot Plan and other Drawings.pdf
Other Document • 15.88 MB
TCC_Annexure-1to7_Annexure-05 _Limiting Auxiliary Power Consump.pdf
Other Document • 0.47 MB
TCC_Annexure-1to7_Annexure-06_Guarantee Declaration rev01.pdf
Other Document • 0.19 MB
TCC_Annexure-1to7_Annexure-07 BBU format for Supply.pdf
Other Document • 0.46 MB
14-22_14. 12.06.2021_Corri-16.pdf
Additional Documents • 1.64 MB
14-22_14. 12.06.2021_Editable version - Price schedule - Section A.doc
Additional Documents • 0.21 MB
14-22_14. 12.06.2021_Editable version - Price schedule - Section B.doc
Additional Documents • 3.24 MB
14-22_15. 20.07.2021_Corrigendum-17-16.06.2021.pdf
Additional Documents • 0.94 MB
14-22_15. 20.07.2021_Corrigendum-18-25.06.2021.pdf
Additional Documents • 1.88 MB
14-22_15. 20.07.2021_Corrigendum-19-19.07.2021.pdf
Additional Documents • 1.24 MB
14-22_16. 17.01.2022_Corrigendum-28_13.01.22.pdf
Additional Documents • 25.94 MB
14-22_17. 02.02.2022_Corrigendum-29.pdf
Additional Documents • 1.35 MB
14-22_18. 21.02.2022_Corrigendum- 31.pdf
Additional Documents • 0.43 MB
14-22_19. 01.03.2022_Corrigendum-32-Clarification-28.02.2022.pdf
Additional Documents • 0.52 MB
14-22_20. 18.04.2022_Corrigendum - 34.pdf
Additional Documents • 0.98 MB
14-22_21. 13.06.2022_Corrigendum-37-10.06.22.pdf
Additional Documents • 3.37 MB
14-22_22. 29.06.2022_Corrigendum-38-23.06.2022.pdf
Additional Documents • 1.40 MB
14-22_22. 29.06.2022_Corrigendum-39_23.06.2022.pdf
Additional Documents • 1.40 MB
14-22_22. 29.06.2022_Corrigendum-40_27.06.2022.pdf
Additional Documents • 0.41 MB
Volume-IA-IB_VOLUME IA Commercial-Invitation for Bid.pdf
Additional Documents • 28.14 MB
Volume-IA-IB_VOLUME IB.pdf
Additional Documents • 24.82 MB
23. 06.09.2023_B1 - Site grading layout R5 2010.dwg
Additional Documents • 10.87 MB
23. 06.09.2023_New folder_Annexure - Technical specification (Section A).pdf
Additional Documents • 3.24 MB
23. 06.09.2023_New folder_Annexure -Technical Specification (Section-B).pdf
Additional Documents • 9.97 MB
23. 06.09.2023_New folder_Annexure-Commercial Specification Changes.pdf
Additional Documents • 0.37 MB
23. 06.09.2023_New folder_Letter to BHEL_05092023.pdf
Additional Documents • 0.42 MB
23. 06.09.2023_New folder_NLCIL reply for Bhel Letter Dt. 06.05.2023.pdf
Additional Documents • 0.16 MB
23. 06.09.2023_New folder_NLCIL reply for Bhel Letter Dt.13.04.2023.pdf
Additional Documents • 0.36 MB
Volume-IIA_VOLUME II A Part II.pdf
Additional Documents • 26.63 MB
Volume-IIA_VOLUME II A Part-I.pdf
Additional Documents • 13.17 MB
23-1-06-09-23_18A03-DWG-M-002A-for Biomass.dwg
Additional Documents • 38.37 MB
Volume-IIIA_VOLUME III-A.pdf
Additional Documents • 17.29 MB
24-27_Amdt_Clar-Cust_Specs_24. 17.10.2023_18A03-DWG-M-002A-for notes.pdf
Additional Documents • 7.84 MB
24-27_Amdt_Clar-Cust_Specs_24. 17.10.2023_2.0 AHS & Plot Plan CIS Final.pdf
Additional Documents • 0.01 MB
24-27_Amdt_Clar-Cust_Specs_24. 17.10.2023_Annexure A - Technical CIS Final (1).pdf
Additional Documents • 1.41 MB
24-27_Amdt_Clar-Cust_Specs_24. 17.10.2023_Annexure C - Section A (1).pdf
Additional Documents • 0.05 MB
24-27_Amdt_Clar-Cust_Specs_24. 17.10.2023_Annexure-A1_ CMDI Pipe_ Spec..pdf
Additional Documents • 0.09 MB
24-27_Amdt_Clar-Cust_Specs_24. 17.10.2023_Annexure-B_Commercial Specification changes-13102023.pdf
Additional Documents • 0.20 MB
24-27_Amdt_Clar-Cust_Specs_24. 17.10.2023_Lr to BHEL-13102023.pdf
Additional Documents • 0.48 MB
24-27_Amdt_Clar-Cust_Specs_24. 17.10.2023_NLCIL reply to BHEL LR dt.30092023.pdf
Additional Documents • 0.16 MB
24-27_Amdt_Clar-Cust_Specs_24. 17.10.2023_NLCIL Reply to BHEL Lr_18.09.2023.pdf
Additional Documents • 0.16 MB
24-27_Amdt_Clar-Cust_Specs_25. 23.10.2023_Annexure-I NLCIL response to BHEL letter Dt.18102023.pdf
Additional Documents • 0.62 MB
24-27_Amdt_Clar-Cust_Specs_25. 23.10.2023_Annexure-II Change in specification-Commercial-21102023.pdf
Additional Documents • 0.57 MB
24-27_Amdt_Clar-Cust_Specs_25. 23.10.2023_Lr to BHEL-21102023.pdf
Additional Documents • 0.48 MB
24-27_Amdt_Clar-Cust_Specs_26. 22.11.2023_20231122-Changes in specification_22112023.pdf
Additional Documents • 0.28 MB
24-27_Amdt_Clar-Cust_Specs_27. 27.11.2023_20231127-Changes in specification_27.11.2023.pdf
Additional Documents • 0.74 MB
Drawing Part-I and II_Drawing part I.pdf
Additional Documents • 15.57 MB
Drawing Part-I and II_Drawing part II.pdf
Additional Documents • 17.85 MB
TCC_Annexure-9to20_and_A-B_Annex-10 3D DRAWINGS SUBMISSION REG (1).pdf
Additional Documents • 0.12 MB
TCC_Annexure-9to20_and_A-B_Annex-11 Combined.pdf
Additional Documents • 4.03 MB
TCC_Annexure-9to20_and_A-B_Annex-12 Proposal cum evaluation report.pdf
Additional Documents • 0.28 MB
TCC_Annexure-9to20_and_A-B_Annex-13 Combined FQP.pdf
Additional Documents • 8.31 MB
TCC_Annexure-9to20_and_A-B_Annex-14_HSEP14R2.pdf
Additional Documents • 4.81 MB
TCC_Annexure-9to20_and_A-B_Annex-15 Combined.pdf
Additional Documents • 2.74 MB
TCC_Annexure-9to20_and_A-B_Annex-16 Roads scope for CHP AHP.pdf
Additional Documents • 10.79 MB
TCC_Annexure-9to20_and_A-B_Annex-17-Attachment 7 BHEL Geotechnical Investigation report.pdf
Additional Documents • 4.45 MB
TCC_Annexure-9to20_and_A-B_Annex-19_BOQ FORMAT Talabira to CPC.pdf
Additional Documents • 0.21 MB
TCC_Annexure-9to20_and_A-B_Annex-20 Declaration.pdf
Additional Documents • 0.25 MB
TCC_Annexure-9to20_and_A-B_Annex-9 DRIVE LIST to be filled by bidder (1).pdf
Additional Documents • 0.09 MB
TCC_Annexure-9to20_and_A-B_Annexure-A - Standard Guidelines for Labour Colony_Final.pdf
Additional Documents • 0.23 MB
TCC_Annexure-9to20_and_A-B_Annexure-B Definitions (1).pdf
Additional Documents • 1.86 MB
TCC_Annexure-9to20_and_A-B_BOQ FORMAT Talabira to CPC.xlsx
Additional Documents • 0.01 MB
Drawing Part-III-IV-V_Drawing part III.pdf
Additional Documents • 4.43 MB
Drawing Part-III-IV-V_Drawing part IV.pdf
Additional Documents • 5.54 MB
Drawing Part-III-IV-V_Drawing part V.pdf
Additional Documents • 25.70 MB
TLB-EPC-CHP_Major_Highlights_of_The_Tender.pdf
Other Document • 0.30 MB
Annex-8_Annexure-A-to-P_Annex-8-Annexure A-Technical-Compressed-Opt.pdf
Additional Documents • 16.84 MB
Annex-8_Annexure-A-to-P_Annex-8-Annexure B-Opt.pdf
Additional Documents • 6.63 MB
Annex-8_Annexure-A-to-P_Annex-8-Annexure C.pdf
Additional Documents • 2.77 MB
Annex-8_Annexure-A-to-P_Annex-8-Annexure D.pdf
Additional Documents • 1.81 MB
Annex-8_Annexure-A-to-P_Annex-8-Annexure E.pdf
Additional Documents • 1.65 MB
Annex-8_Annexure-A-to-P_Annex-8-Annexure F.pdf
Additional Documents • 1.77 MB
Annex-8_Annexure-A-to-P_Annex-8-Annexure G.pdf
Additional Documents • 1.63 MB
Annex-8_Annexure-A-to-P_Annex-8-Annexure I.pdf
Additional Documents • 1.95 MB
Annex-8_Annexure-A-to-P_Annex-8-Annexure J.pdf
Additional Documents • 3.60 MB
Annex-8_Annexure-A-to-P_Annex-8-Annexure K.pdf
Additional Documents • 2.63 MB
Annex-8_Annexure-A-to-P_Annex-8-Annexure L.pdf
Additional Documents • 0.63 MB
Annex-8_Annexure-A-to-P_Annex-8-Annexure N.pdf
Additional Documents • 0.38 MB
Annex-8_Annexure-A-to-P_Annex-8-Annexure O.pdf
Additional Documents • 0.13 MB
Annex-8_Annexure-A-to-P_Annex-8-Annexure P.pdf
Additional Documents • 0.49 MB
1. 03.12.2020_Corri-1_1-corri1850120201118_0015K_COCont_document1.pdf
Additional Documents • 0.99 MB
1. 03.12.2020_Corri-1_2-corri1850120201118_0015K_COCont_document2.pdf
Additional Documents • 12.56 MB
1. 03.12.2020_Corri-1_3-corri1850120201118_0015K_COCont_document3.pdf
Additional Documents • 20.13 MB
2. 08.12.2020_CTO Attachments to bidder_C26 - Township preliminary contour.dwg
Additional Documents • 3.51 MB
2. 08.12.2020_CTO Attachments to bidder_Drainage study report to bidder.pdf
Additional Documents • 9.19 MB
2. 08.12.2020_CTO Attachments to bidder_MINES EMBANKMENT SOIL INVESTIGATION REPORT FOR REFERENCE.pdf
Additional Documents • 1.71 MB
2. 08.12.2020_CTO Attachments to bidder_Talabira Project TPP2007.dwg
Additional Documents • 0.19 MB
2. 08.12.2020_NTTPP - BHEL query attachments-1_1d.PROPOSED WATER INTAKE _ PIPELINE _NLCIL_25.11.2020 (2).dwg
Additional Documents • 3.60 MB
2. 08.12.2020_NTTPP - BHEL query attachments-1_1f. Contour PART_B- Aah Pond area.dwg
Additional Documents • 11.89 MB
2. 08.12.2020_NTTPP - BHEL query attachments-2_5c.Intake water Talabira-- Technical Report.pdf
Additional Documents • 13.06 MB
2. 08.12.2020_NTTPP - BHEL query attachments-2_8a.18A03-DWG-C-0008-R0 Ash dyke GA.pdf
Additional Documents • 0.49 MB
3. 19.12.2020_Corri-3.pdf
Additional Documents • 12.67 MB
4. 11.01.2021_Corrigendum-5_Pre-bid_08.01.2021-1-400.pdf
Additional Documents • 21.37 MB
4. 11.01.2021_Corrigendum-5_Pre-bid_08.01.2021-401-840.pdf
Additional Documents • 8.51 MB
4. 11.01.2021_Corrigendum-5_Pre-bid_08.01.2021-841-1336.pdf
Additional Documents • 11.67 MB
4. 11.01.2021_Corrigendum-5_Pre-bid_08.01.2021-Additional_C26A - Township preliminary contour.dwg
Additional Documents • 3.47 MB
4. 11.01.2021_Corrigendum-5_Pre-bid_08.01.2021-Additional_Corri-5_Covering Letter.pdf
Additional Documents • 0.38 MB
4. 11.01.2021_Corrigendum-5_Pre-bid_08.01.2021-Additional_X1-Talabira Project TPP2007.dwg
Additional Documents • 0.19 MB
NIT27013.pdf
Tender Documents • 0.96 MB
TCC_GCC_FnP_Annex-K-PVC_01_TCC CHP.pdf
Tender Documents • 1.42 MB
TCC_GCC_FnP_Annex-K-PVC_02_GCC-EPC.pdf
Tender Documents • 0.84 MB
TCC_GCC_FnP_Annex-K-PVC_03_PSSR Forms and Procedures Dtd 12-03-2026.pdf
Tender Documents • 6.48 MB
TCC_GCC_FnP_Annex-K-PVC_04_ANNEXURE_K_PVC.pdf
Tender Documents • 0.18 MB
BOQ_65737.xls
BOQ • 0.31 MB
Corrigendum-23_Modification_GCC_Clause.pdf
PDF • 0.27 MB
Corrigendum-22_Due_Dt_Ext.pdf
PDF • 0.28 MB
Corrigendum-21_Modification_NIT.pdf
PDF • 2.12 MB
Corrigendum-20_dtd_23-07-26.pdf
PDF • 14.15 MB
Corrigendum-19_Due_Dt_Ext.pdf
PDF • 0.28 MB
Corrigendum-18_dtd_15-07-26.pdf
PDF • 0.24 MB
Corrigendum-17_Due_Dt_Ext.pdf
PDF • 0.28 MB
Corrigendum-16.pdf
PDF • 0.28 MB
Corrigendum-15_dtd_06-07-26.pdf
PDF • 0.27 MB
Corrigendum-14_for_Due_Dt_Ext.pdf
PDF • 0.28 MB
Corrigendum_13_23062026.pdf
PDF • 0.58 MB
Corrigendum-12_Additional_TCC-Clause.pdf
PDF • 0.23 MB
Corrigendum-11_dtd_19-06-26.pdf
PDF • 0.29 MB
Corrigendum-10.pdf
PDF • 0.27 MB
Corrigendum-9_dtd_15-06-26.pdf
PDF • 0.41 MB
Corrigendum-8_dtd_10-06-26.pdf
PDF • 10.43 MB
Corrigendum-07.pdf
PDF • 0.27 MB
Corrigednum-6_Annexures-Geo-Report-Part-2C_2D_2E_Layout_TCC_Annexure-17_Part-2C_PE-DC-511-602-C001C-R2-GEO_INV_REPORT-PART-4-BOP_AREA.pdf
PDF • 13.28 MB
Corrigednum-6_Annexures-Geo-Report-Part-2C_2D_2E_Layout_TCC_Annexure-17_Part-2D_PE-DC-511-602-C001D-R2-GEOTECH_INVESTIGATION_REPORT_PART-5_CHP-AHP AREA.pdf
PDF • 13.57 MB
Corrigednum-6_Annexures-Geo-Report-Part-2C_2D_2E_Layout_TCC_Annexure-17_Part-2E_PE-DC-511-602-C001E-R1-GEO _NV_REPORT-PART-6_FIELD_TEST_RESULTS.pdf
PDF • 8.02 MB
Corrigednum-6_Annexures-Geo-Report-Part-2C_2D_2E_Layout_TCC_Annexure-17_PE-DG-511-602-C001_R3_GEOTECHNICAL_INVESTIGATION_LAYOUT.pdf
PDF • 3.11 MB
Corrigendum-6_Annexures-Geo-Report-Part-1_2A_2B_TCC_Annexure-17_Part-1_PE-DC-511-602-C001-R03_GEOTECH_REPORT_PART-1-BTG_AREA.pdf
PDF • 9.16 MB
Corrigendum-6_Annexures-Geo-Report-Part-1_2A_2B_TCC_Annexure-17_Part-2A-PE-DC-511-602-C001A_GEOTECH_INVESTIGATION_REPORT_PART 2_R4_COMPOUND_WALL_AREA.pdf
PDF • 15.51 MB
Corrigendum-6_Annexures-Geo-Report-Part-1_2A_2B_TCC_Annexure-17_Part-2B_PE-DC-511-602-C001B_GEOTECH_INVESTIGATION_REPORT_PART-3_R3.pdf
PDF • 9.59 MB
Corrigendum-6_dtd_03-06-26.pdf
PDF • 11.30 MB
Corrigendum-05.pdf
PDF • 0.27 MB
Corrigendum-04.pdf
PDF • 0.27 MB
Corrigendum-3_dtd_25-05-26-Mod_TCC_Reply_PBQ.pdf
PDF • 15.23 MB
Corrigendum-02_18-05.pdf
PDF • 0.27 MB
Corrigendum-1-14-05-2026.pdf
PDF • 0.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].