Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC R O BOGDANG | L1 | Accepted-AOC found lowest one bidder | |
| 2 | L2₹5.5 L+₹53,234 (10.7%)Rejected-AOC | L2 | Rejected-AOC Quoted high rates as compmare to L1 bidder | |
| 3 | L3₹5.7 L+₹74,756 (15.0%)Rejected-AOC | L3 | Rejected-AOC Quoted high rates as compmare to L1 bidder |
Tender Value
₹5.8 L
Closing Date
4 Jul 2022, 2:00 pmClosed
Executive Engineer
Rural Engineeering wing Leh
Construction of culvert for vehicle at Abi canal Choglamsar II
2022_RDD_6749_2
NIT 12 - UTL REWL OF 2022-23
Open Tender
Civil Works - Others
Item Rate
60 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Payable To Executive Engineer
Exempted
19 Jul 2022
18 Jun 2022
6 Jul 2022
18 Jun 2022
4 Jul 2022
18 Jun 2022
Amount
Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil
providing and laying dry stone soling in horizontal including cost of stone all including carriage
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) (A) Crushed
Providin.9 and laying in position specified grade of reinforced cement concrete excluding the cost of centenng. shuttering, finishing and reinforcement-All work upto plinth level.1.1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size)
Centring and shuttermg including strutting, propping etc. and removal of form for·Small lintels not exceeding 1.5m clear span , mouldin'g as in cornices, window sills, string courses, bands, coping, bed plates, anchor blocks and the like
Centring and shuttermg including strutting, propping etc. and removal of form for·ns, Pillars, Piers, Abutments, Posts and Struts
Centring and shuttermg including strutting, propping etc. and removal of form for· Suspended floors, roofs, landings, balco nies and access platform
Centring and shuttermg including strutting, propping etc. and removal of form for·Edges of slabs and breaks in floors and walls. Above 20cms wide
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars.
carriage of sand and bajree average distance of 15kms by M.T
M/S SONAM NORBOO
M/S LOBZANG TSERING
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .