Superintending Engineer and Project Director PIU-I
Office of the Superintending Engineer and Project Director Project Implementation Unit - I,P.W. (Roads) Directorate, 3No. Commissariat Road Hastings Kolkata-700022.
Basulichak-Boga road (VR), from 0.000 km to 19.700 km, Widening and Strengthening work under Tamluk Division, P.W.Dte. in the District of Purba Medinipur.
2026_WBPWD_5019063_1
WBPWD/PW(R)/SEPD/PIU-I/NIT-04 OF 2026-2027
Open Tender
CIVIL WORKS
Percentage
450 days
Basulichak
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.4 Cr
Yes
Project Implementation Unit - I, P.W.(Roads) Direc
18 Aug 2026
18 Aug 2026
11 Sept 2026
19 Aug 2026
9 Sept 2026
26 Aug 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0PART-1 (ROAD WORKS):- | |||||
| 1.01 | Construction of embankment with approved material obtained from borrow pits (land owned/arranged by the Agency with Royalty) with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 & 300-1 .The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305). Cost of compensation for Earth material & its carriage from private land at 5km distance have been included in the rate.
[Note: Royalty as appicable will be deducted from Agency's bill if not produce Royalty clearance certificate from the competent authority.] | 1 | Cum. | 216.71 | ₹216.49 |
| 1.02 | Excavation in Soil by Manual Means
Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to
embankment site with all lifts and lead upto 1000 metres (Reference to MoRT&H's specification clause 301).
(Note: In case there is a situation where the cross-section is of cut and fill and cut earth is required to be used in embankment in the immediate vicinity, the item of carriage in the truck (i.e. ₹40.90) shall be omitted.) | 1 | Cum. | 208.66 | ₹208.45 |
| 1.03 | Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately
By Manual Means
Granular courses | - | Cum. | 577.14 | - |
| 1.04 | Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately
By Mechanical Means
Bituminous course | 1 | Cum. | 307.17 | ₹306.86 |
| 1.05 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Reference to MoRT&H's specification clause 301). | 1 | Cum. | 83.99 | ₹83.91 |
| 1.06 | Construction of Subgrade and Earthen Shoulders
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits (land owned/arranged by the Agency with Royalty) with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Reference to MoRT&H's specification clause 305).
[Note: In case earth is available from Govt. land, compensation for earth i.e. ₹ 43.00/m3 to be deducted from the Rate]
[Note: Royalty as appicable will be deducted from Agency's bill if not produce Royalty clearance certificate from the competent authority.] | 1 | Cum. | 255.22 | ₹254.96 |
| 1.07 | Fine Sand Filling in Foundation Trenches with good local sand free from earth not exceeding 150 mm compacted thickness including inundating each layer by profuse water and porking and rammimg layer by layer. Quality of sand is to be approved by the Engineer-in-charge.(Reference to MORT&H's specification 304).
(Payment will be made on the basis of finished compacted volume) | - | Cum. | 981.63 | - |
| 1.08 | Water Bound Macadam
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages
to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density (Reference to
MoRT&H's specification 404).
using Screening Crushable type such as pickup materials (Sulvage materials)
(Payment will be made on the basis of finished compacted volume) | 1 | Cum. | 377 | ₹376.62 |
| 1.09 | Water Bound Macadam Sub Base by consolidating Jhama metal of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
For Construction of Sub Base by consolidating Jhama metal (63 mm to 45 mm) with moorum screening :
(Payment will be made on the basis of finished compacted volume) | 1 | Cum. | 2,870.42 | ₹2,867.55 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 21.30 MB
FORM2911ii_Supervision_Consultant.pdf
Tender Documents • 0.67 MB
BOQ_5090774.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].