Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹65.7 L+₹4.9 L (8.05%)Rejected-Finance UTTAR PRADESH UP | L2 | Rejected-Finance L2 | |
| 3 | L3₹65.8 L+₹5.0 L (8.20%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹67.4 L+₹6.6 L (10.8%)Rejected-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L4 | Rejected-Finance L4 | |
| 5 | L5₹68.4 L+₹7.6 L (12.5%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | SHIVAM ENTERPRISES L4 | J P INFRATECH L1 | Arun Kumar L2 | GANPATI CONSTRUCTIONS L7 | Arvind Kumar L5 | ARUN KUMAR GUPTA L3 | M/S RIDAM ASSOCIATES L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning Thick Bushes & Throny Jungle without uprooting and uprooting jhunds i/c back filling with disposal with all cost of labour and T&P etc | 1,400 | Sqm | 3 ₹4,200 | 3.9 ₹5,460 | 1.98 ₹2,772 Lowest | 4 ₹5,600 | 2 ₹2,800 | 1.99 ₹2,786 | 2 ₹2,800 |
| 2.00 | Laying Cement Concrete in 1:1.5:3 (M-20 ) including all cost of material, labour and T&P etc. | 112 | Cum | 5,112 ₹5,72,544 | 4,900.11 ₹5,48,812.32 Lowest | 5,489 ₹6,14,768 | 5,400 ₹6,04,800 | 5,500 ₹6,16,000 | 5,490 ₹6,14,880 | 5,000 ₹5,60,000 |
| 3.00 | P/Laying Brick work 1:4 including all cost of material, labour and T&P etc. | 46 | Cum | 4,550 ₹2,09,300 Lowest | 4,800 ₹2,20,800 | 5,400 ₹2,48,400 | 5,000 ₹2,30,000 | 6,000 ₹2,76,000 | 5,400 ₹2,48,400 | 4,800 ₹2,20,800 |
| 4.00 | 12mm thick Cement Plaster 1:4 CM on New Brick work including all cost of material, labour and T&P etc. | 150 | Sqm | 154 ₹23,100 | 149 ₹22,350 Lowest | 179 ₹26,850 | 170 ₹25,500 | 150 ₹22,500 | 180 ₹27,000 | 150 ₹22,500 |
| 5.00 | 12mm thick Cement Plaster 1:4 CM after dismatling old plaster including all cost of material, labour and T&P etc. | 600 | Sqm | 176 ₹1,05,600 | 158 ₹94,800 | 188 ₹1,12,800 | 170 ₹1,02,000 | 150 ₹90,000 Lowest | 189 ₹1,13,400 | 180 ₹1,08,000 |
| 6.00 | Finishing walls with Acrylic Smooth exterior paint of required shade : 13.46.1 New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) | 6,510 | Sqm | 102 ₹6,64,020 | 80.6 ₹5,24,706 | 68 ₹4,42,680 Lowest | 100 ₹6,51,000 | 80 ₹5,20,800 | 69 ₹4,49,190 | 90 ₹5,85,900 |
| 7.00 | Painting with Two coat of synthetic Enamel Paint of approved quality including priming coat on Steel surface of Existing Railing jali including all cost of material, labour and T&P etc. | 825 | Sqm | 118 ₹97,350 | 80 ₹66,000 Lowest | 98 ₹80,850 | 130 ₹1,07,250 | 105 ₹86,625 | 99 ₹81,675 | 85 ₹70,125 |
| 8.00 | Earth work in cutting in all type of soil with all lift and lead and lift upto 1.50m with all cost of labour and T&P etc. | 3.5 | Cum | 82 ₹287 | 65 ₹227.5 Lowest | 68 ₹238 | 100 ₹350 | 80 ₹280 | 69 ₹241.5 | 100 ₹350 |
| 9.00 | Providing and Laying Cement Concrete in 1:3:6 (M-10) including all cost of material, labour and T&P etc. | 1.7 | Cum | 4,163 ₹7,077.1 | 4,571 ₹7,770.7 | 4,200 ₹7,140 | 5,000 ₹8,500 | 5,000 ₹8,500 | 4,200 ₹7,140 | 4,000 ₹6,800 Lowest |
| 10.00 | Providing & Fixing Steel Railing on Bridges including all cost of material, labor and T&P etc | 43,112 | Kg. | 111 ₹47,85,432 | 100.6 ₹43,37,067.2 Lowest | 111 ₹47,85,432 | 119 ₹51,30,328 | 115 ₹49,57,880 | 111.02 ₹47,86,294.24 | 116 ₹50,00,992 |
Tender Value
₹82.3 L
EMD Value
₹1.6 L
Closing Date
27 Jul 2026, 2:00 pmClosed
SE GNSM Meerut
Office of SE GNSM Meerut
As per the NIT
2026_UPIDC_1168851_7
02/SE/2026-27
Open Tender
Civil Works
Piece-work
150 days
Haridwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
₹1.6 L
Office of SE GNSM Meerut
13 Aug 2026
14 Jul 2026
27 Jul 2026
14 Jul 2026
27 Jul 2026
14 Jul 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning Thick Bushes & Throny Jungle without uprooting and uprooting jhunds i/c back filling with disposal with all cost of labour and T&P etc | 1,400 | Sqm | 4.4 | ₹6,160 |
| 2 | Laying Cement Concrete in 1:1.5:3 (M-20 ) including all cost of material, labour and T&P etc. | 112 | Cum | 468.6 | ₹52,483.2 |
| 3 | P/Laying Brick work 1:4 including all cost of material, labour and T&P etc. | 46 | Cum | 993.65 | ₹45,707.9 |
| 4 | 12mm thick Cement Plaster 1:4 CM on New Brick work including all cost of material, labour and T&P etc. | 150 | Sqm | 1,611.2 | ₹2,41,680 |
| 5 | 12mm thick Cement Plaster 1:4 CM after dismatling old plaster including all cost of material, labour and T&P etc. | 600 | Sqm | 6,395.9 | ₹38,37,540 |
| 6 | Finishing walls with Acrylic Smooth exterior paint of required shade : 13.46.1 New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) | 6,510 | Sqm | 6,045 | ₹3,93,52,950 |
| 7 | Painting with Two coat of synthetic Enamel Paint of approved quality including priming coat on Steel surface of Existing Railing jali including all cost of material, labour and T&P etc. | 825 | Sqm | 83.64 | ₹69,003 |
| 8 | Earth work in cutting in all type of soil with all lift and lead and lift upto 1.50m with all cost of labour and T&P etc. | 3.5 | Cum | 1,123.75 | ₹3,933.13 |
| 9 | Providing and Laying Cement Concrete in 1:3:6 (M-10) including all cost of material, labour and T&P etc. | 1.7 | Cum | 100 | ₹170 |
| 10 | Providing & Fixing Steel Railing on Bridges including all cost of material, labor and T&P etc | 43,112 | Kg. | 575 | ₹2,47,89,400 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
TDLOT7.pdf
Tender Documents • 1.51 MB
BOQ_2193090.xls
BOQ • 0.27 MB
DateExten.pdf
PDF • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .