| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | ₹4.9 L | L1 | Accepted-AOC accept |
| 2 | L2₹5.0 LRejected-Finance | ₹5.0 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | PSN BUILDERS | UPPILIYAPPAN MANUNEEDHI |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation, etc., in all soil sand sub- soils and to full depth as may be directed except in hard rock requiring blasting inclusive of shoring, shuttering, bailing out water wherever necessary refilling the foundation with excavated earth other than sandy soil in layers of not more than 15 cm thick well rammed and depositing the surplus earth with in the compound in place shown by the departmental officers within an initial lead and lift and clearing and levelling the site etc.,complete | 17.4 | M3 | 2,610 ₹2,610 | 2,279.4 ₹2,279.40 |
| 2.00 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 8.7 | M3 | 21,750 ₹21,750 | 20,793 ₹20,793 |
| 3.00 | Cement Conceret 1:4:8 (One Cement four sand and eight aggregate) using 40mm hard broken granite stone jelly for foundation including dewatering and wherever necessary laying in layers of 15cm thick and consolidated and curing complying with standard specification and as directed by the departmental officers etc., complete | 8.7 | M3 | 56,550 ₹56,550 | 56,323.8 ₹56,323.80 |
| 4.00Supplying and errecting centering for plane surfaces such as CC slab,beam etc.,including strutting upto 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm for boarding laid over country wood (silver Oak) joists of size 10cm X 6.5cm spaced at 90cm centres and supported by casurina props of size 10 - 13cm dia spaced at 75cm centres including necessary cross bracings etc., complete complying with standard specifications. | |||||
| 4.01 | up to base | 82.2 | M2 | 41,100 ₹41,100 | 40,195.8 ₹40,195.80 |
| 4.02 | slab shuttering | 14.1 | M2 | 15,298.5 ₹15,298.50 | 15,298.5 ₹15,298.50 |
| 5.00 | Plain Cement concrete in 1:2:4 (One part of cement, Two part of sand Four part of ISS gauge HBG metal) using 20mm ISS gauge HBG metal including cost of conveyance of metal from approved quarry at site including cost of cement and all labour watering including mixing dumpling and laying in layer of not more than 15 cm thick and tampering to consolidation curing and all other incidental any complying with standard specification etc., as per T.N.D.SS.No.28. | 8.3 | M3 | 64,532.5 ₹64,532.50 | 64,532.5 ₹64,532.50 |
| 6.00 | RCC 1:1½:3 (One cement one point five sand and three aggregates) mix using 20mm gauge hard granite broken stone jelly in all RCC works connected to the work excluding shuttering , Centering and cost of Reinforcement grills but including curing ,finishing etc complete with standard specification and as directed by departmental officers etc complete as per standard specification. | 1.9 | M3 | 20,900 ₹20,900 | 19,186.2 ₹19,186.20 |
| 7.00 | Plain Cement Concrete 1:1½:3 Mix (one Part of cement, One and half Part of M- Sand and three Part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 28.4 | M3 | 2,41,400 ₹2.4 L | 2,37,992 ₹2.4 L |
| 8.00 | Providing granolithic floor finish of 50mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed sand (M-Sand) and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 9.9 | M2 | 3,663 ₹3,663 | 3,663 ₹3,663 |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
4 Feb 2026, 3:00 pmClosed
Executive Officer
116, Melasalai, Thirubuvanam
Construction of Storm Water Drain At Ward No 03 Aatrankarai Valinadappu and Providing Ramp at Ward No 03, Ward No 04 Kamaraj Nagar in Thirubuvanam Town Panchayat
2026_DTP_648168_1
165/2025
Open Tender
Civil Works
90 days
Thirubuvanam Town Panchayat
Refer Tender Document
2 documents required · 2 mandatory
₹0
₹6,000
29 Apr 2026
29 Jan 2026
4 Feb 2026
29 Jan 2026
4 Feb 2026
29 Jan 2026
Earth work excavation for foundation, etc., in all soil sand sub- soils and to full depth as may be directed except in hard rock requiring blasting inclusive of shoring, shuttering, bailing out water wherever necessary refilling the foundation with excavated earth other than sandy soil in layers of not more than 15 cm thick well rammed and depositing the surplus earth with in the compound in place shown by the departmental officers within an initial lead and lift and clearing and levelling the site etc.,complete
Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification.
Cement Conceret 1:4:8 (One Cement four sand and eight aggregate) using 40mm hard broken granite stone jelly for foundation including dewatering and wherever necessary laying in layers of 15cm thick and consolidated and curing complying with standard specification and as directed by the departmental officers etc., complete
Supplying and errecting centering for plane surfaces such as CC slab,beam etc.,including strutting upto 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm for boarding laid over country wood (silver Oak) joists of size 10cm X 6.5cm spaced at 90cm centres and supported by casurina props of size 10 - 13cm dia spaced at 75cm centres including necessary cross bracings etc., complete complying with standard specifications.
up to base
slab shuttering
Plain Cement concrete in 1:2:4 (One part of cement, Two part of sand Four part of ISS gauge HBG metal) using 20mm ISS gauge HBG metal including cost of conveyance of metal from approved quarry at site including cost of cement and all labour watering including mixing dumpling and laying in layer of not more than 15 cm thick and tampering to consolidation curing and all other incidental any complying with standard specification etc., as per T.N.D.SS.No.28.
RCC 1:1½:3 (One cement one point five sand and three aggregates) mix using 20mm gauge hard granite broken stone jelly in all RCC works connected to the work excluding shuttering , Centering and cost of Reinforcement grills but including curing ,finishing etc complete with standard specification and as directed by departmental officers etc complete as per standard specification.
Plain Cement Concrete 1:1½:3 Mix (one Part of cement, One and half Part of M- Sand and three Part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
Providing granolithic floor finish of 50mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed sand (M-Sand) and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Supply and delivery fixing of Manhole Cover 60 x 60cm (Heavy Duty) with Frame including cost and conveyance of all labour charges etc., Complete as per std., Specifications.,
Supplying and Fabrication of Steel and placing in position MS / Ribbed tor steel Grills for RCC works as per design given including cost of steel and GI binding wire in Floors etc,. Complete complying with standard specification in force and as directed by department officials.-
Supply of approved quality PVC PIPE 110mm 6Kg/CM pipe With Exice Duty AS PER IS 12818/1992.
Supply and delivery and fixing of 100mmx75mm PVC Nahini / Floor Trap with PVC Grating for including cost and conveyance of floortrap and all labour charges etc., complete as per standard specifications.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_777076.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_777076.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid