Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.2 LAdmitted-Finance B 13 ROOM NO 2 2 SHIVA PALM BEACH SOCIETY SECTOR4 NERUL WEST NAVI MUMBAI 400 706 | THANE | MAHARASHTRA | 400706 | L1 | Admitted-Finance | |
| 2 | L2₹37.4 L+₹1.2 L (3.29%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹38.0 L+₹1.8 L (4.99%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹40.2 L+₹4.0 L (11.0%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹41.0 L+₹4.8 L (13.3%)Admitted-Finance ROOM NO D 297 PART III GANESH MURTI NAGAR CUFF PARADE ROAD COLABA MUMBAI 400005 | MUMBAI | MAHARASHTRA | 400005 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SN CONSTRUCTION L6 | Anil Industrial Corporation L1 | GANGAJAL L5 | M/s R S ENTERPRISES L2 | shone infra private limited L3 | SR Construction L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00NOTE- Removal of debris to Mod land should be done entirely by contractors own arrangement. | |||||||||
| 1.01 | Taking down cement or cement lime plaster of any description on brick or stone walls, etc including raking out joints, hacking for key, scrubbing down with water, etc complete all as specified and as directed. | 500 | Sqm | 15 ₹7,500 Lowest | 19 ₹9,500 | 37 ₹18,500 | 16 ₹8,000 | 69 ₹34,500 | 20 ₹10,000 |
| 2.00 | Demolition of brick work or stone masonary built in cement mortar including all quoins, arches, pillars, etc but excluding ashlar facings, dressed stonework and precast concrete articles. | 2 | Cum | 250 ₹500 Lowest | 345 ₹690 | 555 ₹1,110 | 400 ₹800 | 1,290 ₹2,580 | 300 ₹600 |
| 3.00 | Material and labour for brick work with sub class "B" bricks, straight or curved on plan exc 6m mean radius, built in CM (1:4), complete all as specified. | 2 | Cum | 5,000 ₹10,000 | 4,567 ₹9,134 Lowest | 6,200 ₹12,400 | 6,000 ₹12,000 | 5,590 ₹11,180 | 5,000 ₹10,000 |
| 4.00 | Chipping , removing carefullly concrete work by low impact hammer, breakar without damaging the structure & cleaning and disposal of debris out side the premises etc. complete as directed by Engineer-in-Charge.
(Note : Hard concrete should not be removed by force.) | 50 | Sqm | 35 ₹1,750 | 55 ₹2,750 | 47 ₹2,350 | 28 ₹1,400 Lowest | 172 ₹8,600 | 40 ₹2,000 |
| 5.00 | Material and labour for cleaning existing reinforcement with wire/rotary wire brush,making the surfaces free from loose material dirt etc, applying two coats of alkaline rust converting primer FEOVERT or equivalent specification confirming to ASTM-B-117, on the rebars, including cleaning the reinforcement, wire brushing to remove loose rust spalls, with time interval of 6 hour between the coats and applying protective coating IPNET-RB complete all as specified and directed. | 50 | Sqm | 170 ₹8,500 | 88 ₹4,400 | 125 ₹6,250 | 60 ₹3,000 Lowest | 258 ₹12,900 | 150 ₹7,500 |
| 6.00 | M&L for Replacement of steel reinforcement with TMT bars of appropriate size where 30% of cross section is reduced including dismantling of rusted steel complete all as specified and directed. | 30 | Kg | 80 ₹2,400 | 88 ₹2,640 | 92 ₹2,760 | 72 ₹2,160 Lowest | 86 ₹2,580 | 90 ₹2,700 |
| 7.00 | Material & labour for carry out application of Bi-polar migratory corrosion inhibitor EPCO-KP-100/ Protectsil CIT/Ferogard 903 on concrete surface (this inhibitor shall have migratory kind of properly which permits the material to migrate to a virtual extent of 100 mm, through pores of concrete, inhibitor the corrosion and de-passivating the Electro-chemical reaction. It should have properly to attack as well as cathode, which is purely alkaline in nature (pH-9.5), So it has no carcinogen activity with concrete all as per manufacturer's instructions and directed. | 50 | Sqm | 180 ₹9,000 | 234 ₹11,700 | 151 ₹7,550 | 144 ₹7,200 Lowest | 344 ₹17,200 | 200 ₹10,000 |
| 8.00 | M&L for Drilling Holes of 12mm dia, upto 100mm deep holes in structural members at the intervals of 300 to 500mm in staggered manner or along the crack as directed by the Engr-in-charge in RC structural element including Cleaning of the holes by air blower and Inserting 12mm dia. Teflon nozzles compatible with epoxy injector and having machined external end to receive outlet of grouting gun. Fix it inside the holes by applying thixotropic epoxy putty to ensure complete sealing and allow to cure the system for min.8 hrs before grouting including removing nozzle projections, excess putty if any over concrete element grinding, levelling and finishing the external surface, after completion of the work, etc complete. | 20 | Each | 1,200 ₹24,000 | 77 ₹1,540 | 72 ₹1,440 Lowest | 270 ₹5,400 | 129 ₹2,580 | 350 ₹7,000 |
| 9.00 | M&L for Grouting Injecting low viscosity high molecular weight thermosett polymer Monopol 250 H by pressure and using pressure epoxy injector with accessories till nozzles refused to accept the grout, Including Mixing material components part a and part b in required quantities as per mfg instruction by weigh batching Filling the grouting gun with monopol 250 H and maintaining desired pressure in the gun, air compressor and at exit (minimum 3 to 4 kg/Cm2) by a mechanism to monitor both pressure gauges and controlling the same by release valves and release the grout as per requirement simultaneously to grout the structural element through prefixed nozzles till its refusal. Seal the nozzle with thixotropic epoxy putty after the refusal. Note : leakages through other nozzles or cracks are required to be monitored while grouting and such points to be sealed as and when required without any extra cost. | 20 | Each | 120 ₹2,400 Lowest | 333 ₹6,660 | 425 ₹8,500 | 520 ₹10,400 | 430 ₹8,600 | 700 ₹14,000 |
Tender Value
₹44.2 L
EMD Value
₹88,402
Closing Date
22 Jun 2026, 6:00 pmClosed
GE (NW) NOFRA
Dr Homi Bhabha Road, Navy Nagar, Colaba, Mumbai
SPECIAL REPAIR TO P-2 BUILDING AT PASTA LANE, COLABA, MUMBAI UNDER GE (NW) NOFRA
2026_MES_768145_1
8539/E8 GE (NW) NOFRA
Open Tender
Civil Works
Item Rate
365 days
Mumbai
Please refer tender documents
8 documents required · 8 mandatory
₹500
GE (NW) NOFRA
₹88,402
Yes
25 Jun 2026
27 May 2026
24 Jun 2026
27 May 2026
22 Jun 2026
10 Jun 2026
27 May 2026 - 3 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Taking down cement or cement lime plaster of any description on brick or stone walls, etc including raking out joints, hacking for key, scrubbing down with water, etc complete all as specified and as directed. | 500 | Sqm | - | - |
| 2 | Demolition of brick work or stone masonary built in cement mortar including all quoins, arches, pillars, etc but excluding ashlar facings, dressed stonework and precast concrete articles. | 2 | Cum | - | - |
| 3 | Material and labour for brick work with sub class "B" bricks, straight or curved on plan exc 6m mean radius, built in CM (1:4), complete all as specified. | 2 | Cum | - | - |
| 4 | Chipping , removing carefullly concrete work by low impact hammer, breakar without damaging the structure & cleaning and disposal of debris out side the premises etc. complete as directed by Engineer-in-Charge.
(Note : Hard concrete should not be removed by force.) | 50 | Sqm | - | - |
| 5 | Material and labour for cleaning existing reinforcement with wire/rotary wire brush,making the surfaces free from loose material dirt etc, applying two coats of alkaline rust converting primer FEOVERT or equivalent specification confirming to ASTM-B-117, on the rebars, including cleaning the reinforcement, wire brushing to remove loose rust spalls, with time interval of 6 hour between the coats and applying protective coating IPNET-RB complete all as specified and directed. | 50 | Sqm | - | - |
| 6 | M&L for Replacement of steel reinforcement with TMT bars of appropriate size where 30% of cross section is reduced including dismantling of rusted steel complete all as specified and directed. | 30 | Kg | - | - |
| 7 | Material & labour for carry out application of Bi-polar migratory corrosion inhibitor EPCO-KP-100/ Protectsil CIT/Ferogard 903 on concrete surface (this inhibitor shall have migratory kind of properly which permits the material to migrate to a virtual extent of 100 mm, through pores of concrete, inhibitor the corrosion and de-passivating the Electro-chemical reaction. It should have properly to attack as well as cathode, which is purely alkaline in nature (pH-9.5), So it has no carcinogen activity with concrete all as per manufacturer's instructions and directed. | 50 | Sqm | - | - |
| 8 | M&L for Drilling Holes of 12mm dia, upto 100mm deep holes in structural members at the intervals of 300 to 500mm in staggered manner or along the crack as directed by the Engr-in-charge in RC structural element including Cleaning of the holes by air blower and Inserting 12mm dia. Teflon nozzles compatible with epoxy injector and having machined external end to receive outlet of grouting gun. Fix it inside the holes by applying thixotropic epoxy putty to ensure complete sealing and allow to cure the system for min.8 hrs before grouting including removing nozzle projections, excess putty if any over concrete element grinding, levelling and finishing the external surface, after completion of the work, etc complete. | 20 | Each | - | - |
| 9 | M&L for Grouting Injecting low viscosity high molecular weight thermosett polymer Monopol 250 H by pressure and using pressure epoxy injector with accessories till nozzles refused to accept the grout, Including Mixing material components part a and part b in required quantities as per mfg instruction by weigh batching Filling the grouting gun with monopol 250 H and maintaining desired pressure in the gun, air compressor and at exit (minimum 3 to 4 kg/Cm2) by a mechanism to monitor both pressure gauges and controlling the same by release valves and release the grout as per requirement simultaneously to grout the structural element through prefixed nozzles till its refusal. Seal the nozzle with thixotropic epoxy putty after the refusal. Note : leakages through other nozzles or cracks are required to be monitored while grouting and such points to be sealed as and when required without any extra cost. | 20 | Each | - | - |
| 10 | M&L for Providing and applying structural grade EPIBOND-21-LP or equivalent prior to application of any type of mortar plaster confirming to ASTM-C-882-91 (Arizona slant shear test) to ensure bond between old concrete and new concrete complete all as per manufacturer's instructions and as directed by Engineer-in-Charge. | 50 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_860219.xls
BOQ • 2.23 MB
tenderpages8539.pdf
Tender Documents • 1.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .