| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹9.8 LAccepted-AOC 109 67 NEHRU NAGAR KANPUR | KANPUR | KANPUR | UTTAR PRADESH | ₹9.8 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹9.8 LRejected-Finance | ₹9.8 L | L-2 | Rejected-Finance L-2 |
Tender Value
₹9.9 L
EMD Value
₹98,502
Closing Date
5 May 2026, 3:00 pmClosed
ce knn
ce knn moti jheel
improvement nd covering work of damage nala from abhinav seva sansthan to shanneshwar chauraha at rana pratap nagar in ward-86 under zone -06.
2026_NNKAN_1145010_1
732/AA-6/2025-26
Open Tender
Civil Works
45 days
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹98,502
2 Jul 2026
4 May 2026
5 May 2026
4 May 2026
5 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and work, including T&P and scaffolding wherever necessary, sorting the dismentled material, disposal of unserviceable material and stacking the serviceable material with all and lead of 1000 m as per Tenchnical specification Clause 202. By Mechanical Means Reniforced Cement Concrete R.B. | 27.75 | sqm | 1,200 | ₹33,300 |
| 2 | Nala disilting in in soil mixed with moorum, shingle. Kankar etc reguiring the use of special T&P. such as pickaxel, sabbale etc in or under foul position, including pumping out water as required for open drain Ch-4 (item no 2.6.1b) | 261 | cum | 180 | ₹46,980 |
| 3 | Brick work with common burnt clay (non modular) bricks of class-150 in fondation and plinth in: Cement motar 1:4 (1 cement: 4 coarse sand)m-150 class brick work | 25.48 | cum | 6,600 | ₹1,68,168 |
| 4 | 12 mm cement plaster of mix: 1:4 (1) cement: 4 coarse sand) | 139.8 | sqm | 182 | ₹25,443.6 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttesses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finihing and reinforcement: 1:1.5:3 (1 Cement: 1.5 Coarse sand (zone-III): 3 graded stone aggregate 20 mm (nominal size). | 37.04 | cum | 8,411 | ₹3,11,543.44 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 2,907.64 | kg | 72 | ₹2,09,350.08 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:1.5:3 (1 Cement: 1.5 Coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size). | 5 | cum | 7,160 | ₹35,800 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for (uoto 5th Floor): Foundations, footings, bases for columns. | 20 | cum | 209 | ₹4,180 |
| 9 | TAX18% | 1 | TaX | 1,50,257.72 | ₹1,50,257.72 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.60 MB
BOQ_2139916.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid