Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC 439 D DEFENCE COLONY JAJMAU KANPUR 208010 | KANPUR NAGAR | UTTAR PRADESH | 208010 | ₹1.4 Cr Quoted ₹1.7 Cr | L1 | Accepted-AOC L-1 |
| 2 | L2₹1.7 Cr+₹1.8 L (1.08%)Rejected-Finance | ₹1.7 Cr+₹1.8 L (1.08%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Disqualify |
Tender Value
₹1.7 Cr
EMD Value
₹10.6 L
Closing Date
1 May 2026, 3:00 pmClosed
CHIEF ENGINEER, KMC
Motijheel
Constraction of RCC Nala Both Side from Sai Garment to Halwa Khada Nala at Jarauli Phase -1 in Ward - 82 under zone -3
2026_NNKAN_1140444_1
1549A/AA-2/25-26
Open Tender
Civil Works
Fixed-rate
180 days
zone 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,391
₹10.6 L
21 Jul 2026
22 Apr 2026
1 May 2026
22 Apr 2026
1 May 2026
22 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Excavation by mechanical means (Hydraulic excavator)/manual means in foundations trench or drain excavated soil and disposal of surplus excavated soil as directed, withen a lead of 50m . including dressing of sides and ramming of bottom, lift up to 1.5 mtr etc. | - | cum | - | - |
| 2 | Providing and Laying Cement concrete (1:5:10, 1 cement: 5 Coarse sand: 10 graded Stone aggregate nominal size 40 mm) and curing complete, including cost of formwork in foundation and floors. | - | cum | - | - |
| 3 | Centering and shutring including cost of de- shutring and decentering at all level over height 3.5 m aditional height 1 mtr etc all work | - | sqm | - | - |
| 4 | Providing and Laying in position specified grade of Reinforced Cement Concrete work 1:1.5:3 excluding cost of centering, shuttering and finishing, including cost of curing, etc all completion of work. | 0.4 | cum | - | - |
| 5 | Mild steel or Iron in Reinforcement including all completion of work. | 0.4 | qtls | - | - |
| 6 | Disposal of Earth up to 3 km including all completion of work. | 1 | cum | - | - |
| 7 | Add 18% G.S.T | - | tax | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
drain0105ulbt2.pdf
Tender Documents • 2.11 MB
100stamp.pdf
Tender Documents • 0.30 MB
BOQ_2129678.xls
BOQ • 0.25 MB
date05052026.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .