Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98.4 LAccepted-AOC | ₹98.4 L | L1 | Accepted-AOC As per board recommendation |
| 2 | L2₹98.5 L+₹9,943.13 (0.10%)Rejected-AOC | ₹98.5 L+₹9,943.13 (0.10%) | L2 | Rejected-AOC As per board recommendation |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Required EMD not submitted. |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
27 Jan 2023, 11:00 amClosed
EE-II,IMC
IMC office, Niti Vihar, Itanagar
C/o.RCC Retaining wall at Segment -III, Karsingsa to prevent land slide and to protect the BSNL MICRO Tower ward No.20, 2. C/o Storm Water Drainage System and RCC Retaining wall near DFO Office, 3. C/o CC Pavement Road with CC drain at Karsingsa (Taw
2023_IMCAP_1040_2
MC/EE(Pt-II)/15 FC/RFP/NIT-251/22-23/31
Open Tender
Civil Works
Item Rate
90 days
banderdewa
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Yes
Payable To EE-II,IMC
₹2.0 L
Yes
6 Feb 2023
21 Jan 2023
27 Jan 2023
21 Jan 2023
27 Jan 2023
21 Jan 2023
21 Jan 2023 - 23 Jan 2023
Amount
Earth work in excavation in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions, lead upto 50 m and lift upto 1.50 m.
Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. a) Foundations and plinth
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specificationsg, fitting and placing HYSD bar reinforcement in sub?structure complete as per drawing and technical specificationsb) Tar/TMT steel
Reinforced cement concrete in walls (any thickness) including attacheda) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size) pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces withcement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement ina) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc and removal of formwork for :a) Foundation, footings, bases of columns etc. and mass concrete.
Centring and shuttering including strutting, propping etc and removal of formwork for b) Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granular Material
Earth work in excavation in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions, lead upto 50 m and lift upto 1.50 m
Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. a) Foundations and plinth
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specificationsg, fitting and placing HYSD bar reinforcement in sub?structure complete as per drawing and technical specificationsb) Tar/TMT steel
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces withcement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement ina) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc and removal of formwork for :a) Foundation, footings, bases of columns etc. and mass concrete.
Centring and shuttering including strutting, propping etc and removal of formwork forb) Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granular Material
Earth work in excavation in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions, lead upto 50 m and lift upto 1.50 m.
Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. a) Foundations and plinth
Reinforcement of RCC work including bending, binding and placing in position complete.b) Tar/TMT steel
Centring and shuttering including strutting, propping etc and removal of formwork for :a) Foundation, footings, bases of columns etc. and mass concrete.
Centring and shuttering including strutting, propping etc and removal of formwork for b) Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc.
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm togive a smooth and even surface excluding cost of centring, shuttering and reinforcement in ::a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Earth work in excavation in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions, lead upto 50 m and lift upto 1.50 m.
Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Reinforced cement concrete in walls (any thickness) including attached pilasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in :a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size
Centring and shuttering including strutting, propping etc and removal of form work for : (b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
12 mm cement plaster 1 : 4 (1 cement : 4 fine sand).
Neat cement punning.
Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the ndulations etc. and disposal of surplus earth, lead upto 50 m.)
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.)
Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383,maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing pound, finishing to lines and grades as per drawing )
Centring and shuttering including strutting proping etc. and removal of form work for:
Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the ndulations etc. and disposal of surplus earth, lead upto 50 m.)
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.)
Cement Concrete Pavement (Construction of un-reinforced, dowel jointed,plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383,maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing )
Centring and shuttering including strutting proping etc. and removal of form work for:
Earth work in excavation in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions, lead upto 50 m and lift upto 1.50 m.
Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Reinforced cement concrete in walls (any thickness) including attached pilasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in :a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size
Centring and shuttering including strutting, propping etc and removal of form work for : (b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
12 mm cement plaster 1 : 4 (1 cement : 4 fine sand).
Neat cement punning.
M/s GT Enterprise
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1186.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .