Loading…
Loading…
Tender Value
₹21.6 L
EMD Value
₹43,158
Closing Date
3 Aug 2026, 3:00 pm2d left
Executive Engineer
O/o Executive Engineer, East Road Civil Division (M-212), PWD, Under Akshardham Flyover, Delhi
Comprehensive maintenance of roads under Sub Divison-I of PWD Division East Road (M-212) during 2026-27. (SH- Urgent road repair work of Patparganj road under Sub Division-I).
2026_PWD_295952_1
20/EE/East Road (M-212)/PWD/2026-27
Open Tender
Civil Works - Roads
Works
30 days
East Road-I
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹43,158
27 Jul 2026
27 Jul 2026
3 Aug 2026
27 Jul 2026
3 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. | |||||
| 1.01 | All kinds of soil | 282 | Cum | 177.5 | ₹50,055 |
| 2 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 282 | Cum | 263.95 | ₹74,433.9 |
| 3Providing and applying tack coat using bitumen emulsion conforming to IS: 8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom With medium setting bitumen emulsion | |||||
| 3.01 | On W.B.M / W.M.M. @ 0.4kg/sqm | 640 | Sqm | 21.2 | ₹13,568 |
| 3.03 | On bituminous surface @ 0.25kg/sqm | 1,920 | Sqm | 14.05 | ₹26,976 |
| 4Providing and laying Dense Graded Bituminous Macadam using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge. | |||||
| 4.01 | 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. | 64 | Cum | 11,129.55 | ₹7,12,291.2 |
| 5Providing and laying Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. | |||||
| 5.01 | 40/50 mm compacted thickness with bitumen of grade VG-30 @ 5.5% (percentage by weight of total mix) and lime filler @ 3% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. | 51 | Cum | 12,126.2 | ₹6,18,436.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
BOQ_393876.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].