| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.4 LAccepted-Finance | 1 | Accepted-Finance Financial bid responsive | |
| 2 | 2₹3.5 L+₹12,274.30 (3.64%)Accepted-Finance | 2 | Accepted-Finance Financial bid responsive | |
| 3 | 3₹3.7 L+₹29,878.87 (8.87%)Accepted-Finance | 3 | Accepted-Finance Financial bid responsive | |
| 4 | 4₹3.8 L+₹43,082.30 (12.8%)Accepted-Finance | 4 | Accepted-Finance Financial bid responsive | |
| 5 | 5₹4.0 L+₹59,953.35 (17.8%)Accepted-Finance | 5 | Accepted-Finance Financial bid responsive |
Tender Value
₹4.9 L
EMD Value
₹9,780
Closing Date
25 Sept 2026, 4:00 pmClosed
xen,IFCD Sumbal
irrigation colony sumbal
Construction of culvert near house of Noor Mohammad Ganie at Tundpora Hajin
2026_IFC_323575_2
ENIT04OF2026
Open Tender
Civil Works
Percentage
25 days
Hajin
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
XENIFCDSUMBAL
₹9,780
30 Sept 2026
5 Sept 2026
26 Sept 2026
5 Sept 2026
25 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 32.8 | Cum | 187.3 | ₹6,143.44 |
| 2 | Providing and laying of dry stone solling including cost of stones | 4.05 | Cum | 937.9 | ₹3,798.5 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1.59 | Cum | 5,202.9 | ₹8,272.61 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 22.06 | cum | 7,788.4 | ₹1,71,812.1 |
| 5 | Supply ,Stacking and filling of Nallah muck to specified lines, Grades and cross sections including watering, levelling to camber and consolidation by PRR 8 - 10 tonne Capacity R- Roller Including all carriage of materials from source to site of work (complete Job) | 5.83 | cum | 1,000 | ₹5,830 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work.
Foundation , footings, Bases of columns etc | 37.4 | Sqm | 286.35 | ₹10,709.49 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work.
Suspended floors,roofs,landings,balconies and access platforms | 24.8 | Sqm | 718.2 | ₹17,811.36 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete ( Mild steel and medium tensile steel bars). | 2,206 | kg | 115.35 | ₹2,54,462.1 |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 3.48 | Cum | 218.4 | ₹760.03 |
| 10 | Carriage of material from source upto site of work by mechanical transport,including loading,unloading and stacking etc
a) 20mm stone agg av lead 12 kms | 18.75 | Cum | 305.22 | ₹5,722.88 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.61 MB
BOQ_1089669.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .