| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAccepted-AOC | ₹12.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹13.2 L+₹41,185.53 (3.22%)Rejected-AOC | ₹13.2 L+₹41,185.53 (3.22%) | L2 | Rejected-AOC L2 |
| 3 | L3₹13.5 L+₹70,108.71 (5.48%)Rejected-AOC | ₹13.5 L+₹70,108.71 (5.48%) | L3 | Rejected-AOC L3 |
| 4 | L4₹14.0 L+₹1.2 L (9.33%)Rejected-AOC | ₹14.0 L+₹1.2 L (9.33%) | L4 | Rejected-AOC L4 |
| 5 | L5₹14.4 L+₹1.6 L (12.4%)Rejected-AOC | ₹14.4 L+₹1.6 L (12.4%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | Dharmasamvardhini Constructions private limited L11 | V MANI L4 | VICTORY CONSTRUCTIONS L6 | K NANDAKUMAR L2 | G REKHA L7 | THANIGAIVEL L3 | R SUDHAKAR L8 | SELVI HARDWARES L10 | NETHAJI L5 | M/S RK CONSTRUCTIONS L9 | Prasudhan.P L12 | V AND V INTRATECH L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 52.23 | cum | 226 ₹11,803.98 | 212.84 ₹11,116.63 | 100 ₹5,223 Lowest | 150 ₹7,834.5 | 220.26 ₹11,504.18 | 100 ₹5,223 Lowest | 223.25 ₹11,660.35 | 257.3 ₹13,438.78 | 125 ₹6,528.75 | 233.61 ₹12,201.45 | 263.78 ₹13,777.23 | 194.67 ₹10,167.61 |
| 2.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 9.55 | cum | 4,730 ₹45,171.5 | 4,240.06 ₹40,492.57 | 5,440 ₹51,952 | 5,447.22 ₹52,020.95 | 4,643.29 ₹44,343.42 | 2,000 ₹19,100 | 4,544.04 ₹43,395.58 | 5,408 ₹51,646.4 | 1,500 ₹14,325 Lowest | 4,378.51 ₹41,814.77 | 5,447.22 ₹52,020.95 | 3,878.1 ₹37,035.86 |
| 3.00 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc.Up to Basement | 11.25 | cum | 6,500 ₹73,125 | 4,741.14 ₹53,337.83 | 3,190.9 ₹35,897.63 Lowest | 3,400 ₹38,250 | 5,124.36 ₹57,649.05 | 4,800 ₹54,000 | 5,681.57 ₹63,917.66 | 6,032 ₹67,860 | 6,100 ₹68,625 | 5,893.65 ₹66,303.56 | 6,149.28 ₹69,179.4 | 4,336.41 ₹48,784.61 |
| 4.00 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc.Above Basement | 28.5 | cum | 6,500 ₹1,85,250 | 4,741.14 ₹1,35,122.49 | 4,500 ₹1,28,250 | 3,650 ₹1,04,025 Lowest | 5,201.91 ₹1,48,254.44 | 5,900 ₹1,68,150 | 5,803.36 ₹1,65,395.76 | 6,239 ₹1,77,811.5 | 6,100 ₹1,73,850 | 5,887.68 ₹1,67,798.88 | 6,242.15 ₹1,77,901.28 | 4,336.41 ₹1,23,587.69 |
| 5.00 | Reinforced cement concrete 1:1.5:3 mix using 21mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete (sunshade)Column Below | 7.7 | cum | 7,480 ₹57,596 | 7,225.47 ₹55,636.12 | 9,180.8 ₹70,692.16 | 9,180.8 ₹70,692.16 | 7,899.35 ₹60,825 | 9,000 ₹69,300 | 8,246.57 ₹63,498.59 | 8,839 ₹68,060.3 | 9,180.8 ₹70,692.16 | 7,493.07 ₹57,696.64 | 9,180.8 ₹70,692.16 | 6,608.66 ₹50,886.68 Lowest |
| 6.00 | Reinforced cement concrete 1:1.5:3 mix using 21mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete (sunshade)Column Above | 13.57 | cum | 7,700 ₹1,04,489 | 7,225.47 ₹98,049.63 | 9,321.87 ₹1,26,497.78 | 7,500 ₹1,01,775 | 8,017.15 ₹1,08,792.73 | 9,100 ₹1,23,487 | 8,539.8 ₹1,15,885.09 | 8,943 ₹1,21,356.51 | 9,321.87 ₹1,26,497.78 | 7,527.19 ₹1,02,143.97 | 9,321.87 ₹1,26,497.78 | 6,608.66 ₹89,679.52 Lowest |
| 7.00 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Below GL | 41.22 | cum | 419 ₹17,271.18 | 452.85 ₹18,666.48 | 547.5 ₹22,567.95 | 547.5 ₹22,567.95 | 457.16 ₹18,844.14 | 182.5 ₹7,522.65 Lowest | 457.71 ₹18,866.81 | 364 ₹15,004.08 | 500 ₹20,610 | 701.09 ₹28,898.93 | 545.5 ₹22,485.51 | 414.19 ₹17,072.91 |
| 8.00 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Above GL | 127.49 | cum | 841 ₹1,07,219.09 | 912.87 ₹1,16,381.8 | 1,095 ₹1,39,601.55 | 560.54 ₹71,463.24 | 914.33 ₹1,16,567.93 | 500 ₹63,745 | 462.8 ₹59,002.37 | 395 ₹50,358.55 Lowest | 750 ₹95,617.5 | 906.19 ₹1,15,530.16 | 835.02 ₹1,06,456.7 | 834.94 ₹1,06,446.5 |
| 9.00 | Supply and fabrication of steel including cost and conveyance and all labour charges etc. complete. | 2.03 | Mt | 80,000 ₹1,62,400 | 68,567.6 ₹1,39,192.23 | 91,902.66 ₹1,86,562.4 | 91,902.66 ₹1,86,562.4 | 76,751.01 ₹1,55,804.55 | 91,000 ₹1,84,730 | 83,479.92 ₹1,69,464.24 | 81,113 ₹1,64,659.39 | 90,000 ₹1,82,700 | 81,649.35 ₹1,65,748.18 | 91,902.66 ₹1,86,562.4 | 62,714.27 ₹1,27,309.97 Lowest |
| 10.00 | Weathering coarse concrete using 20mm size broken brick jelly with in pure slaked lime over the RCC Roof in the proportion of 32 : 12 1/2 by volume laid in layer beating the concrete with the wooden batters etc as per standard specifications . | 3.64 | cum | 3,440 ₹12,521.6 | 3,205.12 ₹11,666.64 | 4,178.33 ₹15,209.12 | 4,178.33 ₹15,209.12 | 3,362.23 ₹12,238.52 | 3,500 ₹12,740 | 1,140 ₹4,149.6 Lowest | 6,447 ₹23,467.08 | 2,500 ₹9,100 | 3,496.16 ₹12,726.02 | 4,178.33 ₹15,209.12 | 2,931.51 ₹10,670.7 |
Tender Value
Refer Docs
EMD Value
₹17,300
Closing Date
28 Jul 2026, 3:00 pmClosed
The Block Development officer(BP),Arcot Block
The Block Development office,Arcot Block
Construction of New Anganwadi Building at Pudhupadi H/O Pudhupadi Panchayat in Arcot Block
2026_RDTN_685050_1
A2/1711/2026
Open Tender
Civil Works
Works
90 days
The Block Development office, Arcot Block
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹17,300
24 Aug 2026
10 Jul 2026
28 Jul 2026
10 Jul 2026
28 Jul 2026
10 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 52.23 | cum | - | - |
| 2 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 9.55 | cum | - | - |
| 3 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc.Up to Basement | 11.25 | cum | - | - |
| 4 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc.Above Basement | 28.5 | cum | - | - |
| 5 | Reinforced cement concrete 1:1.5:3 mix using 21mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete (sunshade)Column Below | 7.7 | cum | - | - |
| 6 | Reinforced cement concrete 1:1.5:3 mix using 21mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete (sunshade)Column Above | 13.57 | cum | - | - |
| 7 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Below GL | 41.22 | cum | - | - |
| 8 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Above GL | 127.49 | cum | - | - |
| 9 | Supply and fabrication of steel including cost and conveyance and all labour charges etc. complete. | 2.03 | Mt | - | - |
| 10 | Weathering coarse concrete using 20mm size broken brick jelly with in pure slaked lime over the RCC Roof in the proportion of 32 : 12 1/2 by volume laid in layer beating the concrete with the wooden batters etc as per standard specifications . | 3.64 | cum | - | - |
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_823527.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_823527.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .