| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAccepted-AOC NO 1 HPPWD DIVISION DHARAMSHALA HIMACHAL PRADESH | KANGRA | HIMACHAL PRADESH | 176001 | ₹3.1 Cr | L1 | Accepted-AOC WORK AWARDED VIDE THIS OFFICE LETTER NO. 99-107 DATED 10-04-2023 |
| 2 | L2₹4.3 Cr+₹1.2 Cr (39.7%)Rejected-Finance | ₹4.3 Cr+₹1.2 Cr (39.7%) | L2 | Rejected-Finance REJECTED |
| 3 | L3₹4.4 Cr+₹1.3 Cr (42.3%)Rejected-Finance INDORA TEHSIL INDORA DISTT KANGRA HIMACHAL PRADESH | KANGRA | HIMACHAL PRADESH | 175013 | ₹4.4 Cr+₹1.3 Cr (42.3%) | L3 | Rejected-Finance REJECTED |
| 4 | L4₹5.7 Cr+₹2.6 Cr (83.0%)Rejected-Finance VPO MAJARI TEHSIL SHRI NAINA DEVI DISTT BILASPUR HP | ₹5.7 Cr+₹2.6 Cr (83.0%) | L4 | Rejected-Finance REJECTED |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Chamunda Construction Company L3 | MS Kamal Dev Sharma L4 | Shadil Thakur L1 | P C Construction L2 |
|---|---|---|---|---|---|---|---|
| 1.00Site development for various civil works such as Intake Structure, pump houses,Main balancing reserviors,Service storage reservior,retaining walls,breast wall etc complete as directed by engineer in charge. | |||||||
| 1.01 | Excavation in earth work in all kinds of soil such as pick, jumper, blasting work in hard / soft rocks i/c wedging out of hard/ soft rocks i/c dewatering in saturated soil upto all leads and lifts stacking the excavated soil/ materials not more than 3 meter clear from the edge of excavation and then returning the stacked soil in 15 cm layers when required into plinth side of foundations etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth with in all leads and lifts as per Direction of Engineer - in Charge. | 215.63 | Per Cum. | 530 ₹1,14,283.9 | 788 ₹1,69,916.44 | 300 ₹64,689 Lowest | 421 ₹90,780.23 |
| 2.00Providing form work with steel plates 3.15milimetres thick welded with angle iron in frame 30x30x5mm So as give a fair finish including centring shuttering , strutting and propping etc. with wooden battans & ballies, height of propping & centring below supporting floor to celing not exceeding 4.00 metres & removal of the same for in situ reinforced concrete & plain concrete work in :- | |||||||
| 2.01 | Vertical surface such as wall (any thickness) partitions walls & the like including the attached pillaster,s buttresses plinth string courses & the like as per the direction of the engineer-in-charge with in all lead & lifts. | 830.28 | Per Sqm. | 450 ₹3,73,626 | 548 ₹4,54,993.44 | 200 ₹1,66,056 Lowest | 415 ₹3,44,566.2 |
| 2.02 | Providing and laying cement concrete 1:5:10 mix (1 cement : 5sand :10stone aggregate 40mm nominal size) with 15% plum and curing complete excluding the cost of form work in foundation and plinth in Retaining wall as per direction of Engineer- in-Charge with in all lead & lifts. | 367.2 | Per Cum. | 5,200 ₹19,09,440 Lowest | 14,862 ₹54,57,326.4 | 5,500 ₹20,19,600 | 11,465 ₹42,09,948 |
| 2.03 | Providing and laying PVC pipe 65mm dia complete for weep holes as per direction of engineer in charge with in all leads and lifts. | 244.8 | Per Rmt. | 230 ₹56,304 | 245 ₹59,976 | 175 ₹42,840 Lowest | 188 ₹46,022.4 |
| 3.00Fencing work around all the civil works such as intake structure, Pump Houses, Main balancing reserviors,Service storage reservior,etc complete as directed by engineer in charge as per relevent data sheet and scope of work. | |||||||
| 3.01 | Excavation in foundation trenches etc. In earth work in all kinds of soil such as pick, jumper, blasting work in hard / soft rocks i/c wedging out of hard/ soft rocks i/c dewatering in saturated soil upto all leads and lifts stacking the excavated soil/ materials not more than 3 meter clear from the edge of excavation and then returning the stacked soil in 15 cm layers when required into plinth side of foundations etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth with in all leads and lifts as per Direction of Engineer - in Charge. | 75.6 | Per Cum. | 790 ₹59,724 | 788 ₹59,572.8 | 300 ₹22,680 Lowest | 595 ₹44,982 |
| 3.02 | Providing and laying cement concrete 1:3:6 mix (1 cement : 3 sand :6 stone aggregate 40mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in Retaining wall as per direction of Engineer- in-Charge with in all lead & lifts. | 94.5 | Per Cum. | 9,000 ₹8,50,500 | 16,500 ₹15,59,250 | 6,500 ₹6,14,250 Lowest | 12,574 ₹11,88,243 |
| 4.00Providing form work with steel plates 3.15milimetres thick welded with angle iron in frame 30x30x5mm So as give a fair finish including centring shuttering , strutting and propping etc. with wooden battans & ballies, height of propping & centring below supporting floor to celing not exceeding 4.00 metres & removal of the same for in situ reinforced concrete & plain concrete work in :- | |||||||
Tender Value
₹4.0 Cr
EMD Value
₹4.4 L
Closing Date
5 Oct 2022, 5:00 pmClosed
Executive Engineer
Jal Shakti Division Dalhousie
Providing L.W.S.S. for Sihunta and other multi villages rural piped water supply scheme for part of block Bhattiyat
2022_HPIPH_65244_1
JSVD-DLU-EA-I/9775-9824 dated 19.09.2022
Open Tender
Civil Works
Item Rate
548 days
Sihunta
Providing L.W.S.S. for Sihunta and other multi villages rural piped water supply scheme for part of block Bhattiyat
8 documents required · 8 mandatory
₹2,500
Yes
EE Dalhousie
₹4.4 L
Yes
7 May 2026
21 Sept 2022
6 Oct 2022
21 Sept 2022
5 Oct 2022
21 Sept 2022
21 Sept 2022 - 5 Oct 2022
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.81 MB
NIT.pdf
Tender Documents • 1.80 MB
termsandcondition.pdf
Tender Documents • 0.81 MB
form6.pdf
Tender Documents • 0.79 MB
form12.pdf
Tender Documents • 0.94 MB
datasheet.pdf
Additional Documents • 0.36 MB
Leadchart.pdf
Additional Documents • 0.15 MB
BOQ_98216.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .