| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹1.8 L (1.43%)Admitted-Finance | ₹1.2 Cr+₹1.8 L (1.43%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KULANDAIVELU L1 | SRI SARAVANA CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling Plain cement Concrete including all cost andlabour charges etc, complete (PWD SOR 2022-23 Annexure -3 SI.No .28) | 1,465 | m3 | 438 ₹6,41,670 Lowest | 444.15 ₹6,50,679.75 |
| 2.00 | Removal of Excavated Excess Earth (Dismantling PCC)away from the site to 5K.M including loading andtransportation charges etc, complete as per standard | 1,465 | m3 | 105.5 ₹1,54,557.5 Lowest | 107.6 ₹1,57,634 |
| 3.00 | Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 1,465 | m3 | 6,977 ₹1,02,21,305 Lowest | 7,077 ₹1,03,67,805 |
| 4.00 | Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification | 568 | m1 | 507 ₹2,87,976 Lowest | 514 ₹2,91,952 |
| 5.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | 1,040 | m2 | 281.15 ₹2,92,396 Lowest | 285.1 ₹2,96,504 |
| 6.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 132 | m3 | 4,884 ₹6,44,688 Lowest | 4,950 ₹6,53,400 |
| 7.00 | Providing and erecting of Direction and placeIndentification Retro-reflectorised sign made out of HighIndensity Prismatic Grade sheeting confirming to Type-IVstandards of IRC-67 : 2012 and ASTM D 4956-09specification and fixed over 2mm thick aluminiun sheetfixed over a back supporting frame of 25mm x 25mm x 3mmMild steel angle and suppoted on a mild steel angle post75x75x6mm with a clear height of not less than 2.10m fromthe ground level to the bottom of the sign board and 0.60mbelow ground level. The sign post should be painted as perIRC 67-2012 and firmly fixed to the ground by means ofproperly designed foundation with M15 grade cementconcrete 45cm x 45cm x 60cm size including cost andconveyance of all material, eqipment , machinery and labourwith all leads and life, loading charges necessary forsatisfactory completion of the work as directed by theengineer in charges . High intensity metro Reflectro sheetshall consist of Miniumum coefficient of Retro -reflection asper Table 6.6 of IRC 67-2012 The retro -reflective sheetingshall be covered under 7 years warranty issued for fieldperformance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012 (asper MORTH&H Specification No .801) | 2 | no | 12,336 ₹24,672 Lowest | 12,513 ₹25,026 |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
20 Jan 2023, 3:00 pmClosed
MUNICIPAL COMMISSIONER
RAJAPALAYAM MUNICIPALITY
RAJAPALAYAM CC ROADS IN WARD ,21,22,24,25,26,27,28,29,30,31,32,33
2023_MAWS_279003_12
E1-5126-2022
Open Tender
Civil Works - Roads
Works
180 days
RAJAPALAYAM MUNICIPALITY
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.4 L
Yes
RAJAPALAYAM MUNICIPALITY
25 Jan 2023
5 Jan 2023
20 Jan 2023
5 Jan 2023
20 Jan 2023
5 Jan 2023
12 Jan 2023
Amount
Dismantling Plain cement Concrete including all cost andlabour charges etc, complete (PWD SOR 2022-23 Annexure -3 SI.No .28)
Removal of Excavated Excess Earth (Dismantling PCC)away from the site to 5K.M including loading andtransportation charges etc, complete as per standard
Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38
Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Providing and erecting of Direction and placeIndentification Retro-reflectorised sign made out of HighIndensity Prismatic Grade sheeting confirming to Type-IVstandards of IRC-67 : 2012 and ASTM D 4956-09specification and fixed over 2mm thick aluminiun sheetfixed over a back supporting frame of 25mm x 25mm x 3mmMild steel angle and suppoted on a mild steel angle post75x75x6mm with a clear height of not less than 2.10m fromthe ground level to the bottom of the sign board and 0.60mbelow ground level. The sign post should be painted as perIRC 67-2012 and firmly fixed to the ground by means ofproperly designed foundation with M15 grade cementconcrete 45cm x 45cm x 60cm size including cost andconveyance of all material, eqipment , machinery and labourwith all leads and life, loading charges necessary forsatisfactory completion of the work as directed by theengineer in charges . High intensity metro Reflectro sheetshall consist of Miniumum coefficient of Retro -reflection asper Table 6.6 of IRC 67-2012 The retro -reflective sheetingshall be covered under 7 years warranty issued for fieldperformance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012 (asper MORTH&H Specification No .801)
SRI SARAVANA CONSTRUCTIONS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
bid12.pdf
Tender Documents • 0.71 MB
BOQ_331567.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .