| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC SALBAGAN ROAD BENACHITY DURGAPUR BARDHAMAN BARDHAMAN 713213 WEST BENGAL INDIA | DURGAPUR | BARDHAMAN | WEST BENGAL | 713213 | ₹3.2 L | L1 | Accepted-AOC TC recommendation |
| 2 | L2₹3.3 LRejected-Finance | ₹3.3 L | L2 | Rejected-Finance TC recommendation |
| Sl No | Description | Qty | Unit | UNITED ENGINEERING ENTERPRISE L1 | GT ENTERPRISE L2 |
|---|---|---|---|---|---|
| 1.00Discription of items | |||||
| 2.00 | Cleaning of all the ash from the bottom of the boller by breaking of bricks wall | 1 | ls | 6,200 ₹6,200 | 6,324 ₹6,324 |
| 3.00 | Cleaning of all the ash from both side flue pass of the boller by breaking of bricks wall | 1 | ls | 6,200 ₹6,200 | 6,324 ₹6,324 |
| 4.00 | Cleaning of all the ash from both side furnace of boiler by scraping washing of the same at fire side | 1 | ls | 12,000 ₹12,000 | 12,240 ₹12,240 |
| 5.00 | Cleaning of all the scale by straping of the boiler shell plate and both the furnace of the boiler at water side & washing the same | 1 | ls | 14,000 ₹14,000 | 14,280 ₹14,280 |
| 6.00 | Dismantling of all the fire bar from both the furnace, all the valves and depositing the same at colliery store | 1 | ls | 6,400 ₹6,400 | 6,528 ₹6,528 |
| 7.00 | Cost of Roiler Cleaning Chemical | 10 | ltr | 1,200 ₹12,000 | 1,224 ₹12,240 |
| 8.00 | Old both side fusible plug opening boring threading labour charges. | 2 | nos | 3,000 ₹6,000 | 3,060 ₹6,120 |
| 9.00 | New fusible plug both side & same position fitting with IBR T.C | 2 | nos | 8,500 ₹17,000 | 8,670 ₹17,340 |
| 10.00 | Boiler all valve mounting repairing, overhauling & inspection by boller inspector, with consumable & Labour charges. | 1 | ls | 26,000 ₹26,000 | 26,520 ₹26,520 |
Updated dates
Tender Value
₹3.2 L
EMD Value
₹4,100
Closing Date
7 Jan 2026, 9:00 amClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Cleaning Repairing, Hydraulic test and fitting with commissioning of Lancashire Boiler No WBL/10145 of Khandra Colliery VK Unit under Khandra Colliery.
2025_ECL_349954_1
ECL/GM/BA/E TENDER/25-26/ENM/232 Dt 24.12.2025
Open Tender
Electrical and Maintenance Works
30 days
Khandra Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,100
8 May 2026
24 Dec 2025
9 Jan 2026
24 Dec 2025
7 Jan 2026
24 Dec 2025
24 Dec 2025 - 27 Dec 2025
Cleaning of all the ash from the bottom of the boller by breaking of bricks wall
Cleaning of all the ash from both side flue pass of the boller by breaking of bricks wall
Cleaning of all the ash from both side furnace of boiler by scraping washing of the same at fire side
Cleaning of all the scale by straping of the boiler shell plate and both the furnace of the boiler at water side & washing the same
Dismantling of all the fire bar from both the furnace, all the valves and depositing the same at colliery store
Cost of Roiler Cleaning Chemical
Old both side fusible plug opening boring threading labour charges.
New fusible plug both side & same position fitting with IBR T.C
Boiler all valve mounting repairing, overhauling & inspection by boller inspector, with consumable & Labour charges.
Isolated peeting of different shell strake to be build up by MMAW process using low hydrogen electrode and grind smooth
Welding of Blowdown bend throughout the length two layer with cost of low hydrogen electrode
Complete brick work of both side flue pass, bottom of the boiler both side furnace with materials & labour charges
Boiler inspection fees for Drytest & Hydraulic test with TA
Fabrication & fitting of fire bar of L/ boller at both side furnace with cest of cost & electrode
Supply & fitting of 20" long 3/4 dia gauge glass tube
Corking of leaky defective rivet at diffrent position of front plate and both side furnace
for Lancashire boiler bydraulic test arrangement Inspector (Director of Boiler)
Lancashire boiler fitting purchase materials tape joint, cotton tape, steam joint, hole tight, nut bolt, rubber joint, fibre bush, rubber cone gauge glass etc
Lancashire boiler fitting, commissioning steaming & running condition with consumable & labour charges.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.85 MB
Tendernotice_2.pdf
PDF • 1.25 MB
Tendernotice_3.pdf
PDF • 0.16 MB
BOQ_362707.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid