Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
6 Aug 2026, 2:00 pm
SE(Civil)
3rd floor, Main Building IIT Bhubaneswar, Argul Jatni, Dist-Khordha Odisha
Miscellaneous Civil and Electrical Infrastructure Development works at various locations in IIT Bhubaneswar campus
2026_IITBR_917949_1
IITBBS/SE/Engg section/09/2026-27
Open Tender
Civil Works
Works
180 days
Main Building, 3rd floor IIT Bhubaneswar, Argul
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.1 L
Engineering Section
17 Jul 2026
17 Jul 2026
7 Aug 2026
17 Jul 2026
6 Aug 2026
17 Jul 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil works
DSR-2023, Item No.1.1.2
Carriage of material by mechanical transport within 2 KM including loading, unloading and stacking at site as per the direction of Engineer-in-charge. The rates will be applicable to net quantities after deduction of prescribed percentage for voids mentioned in the specification udner subhead "Carriage for all lift". | 20 | Cum | 239.18 | ₹4,783.6 |
| 2 | DSR-2023, Item No.2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | 228 | Cum | 172.71 | ₹39,377.88 |
| 3 | DSR-2023, Item No.2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m for all kinds of soil. | 35 | Cum | 253.27 | ₹8,864.45 |
| 4 | DSR-2023, Item No.2.25
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and lift upto 1.5m | 216 | Cum | 190.71 | ₹41,193.36 |
| 5 | DSR-2023, Item No.4.1.5
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 13 | Cum | 7,097.74 | ₹92,270.62 |
| 6 | DSR-2023, Item No.4.1.8
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominalsize derived from natural sources) | 103 | Cum | 6,628.08 | ₹6,82,692.24 |
| 7 | DSR-2023, Item No.4.3.1
Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases for columns | 56 | Sqm | 381.56 | ₹21,367.36 |
| 8 | DSR-2023, Item No.4.3.3
Centering and shuttering including strutting, propping etc. and removal of form work for :Columns, piers, abutments, pillars, posts and struts | 61.27 | Sqm | 935.34 | ₹57,308.28 |
| 9 | DSR-2023, Item No.4.17
Making plinth protection 50 mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) over 75 mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. | 40 | Sqm | 729.07 | ₹29,162.8 |
| 10 | DSR-2023, Item No.5.1.2
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 10 | Cum | 8,801.51 | ₹88,015.1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.65 MB
BOQ_964667.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].