Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹40.1 Cr
EMD Value
₹20.1 L
Closing Date
9 Dec 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Central Mumbai (P.W) Division,
Executive Engineer, Central Mumbai (P.W) Division, Worli
Construction of New Transport Commissioner Office (Transport Bhavan) on CTS No.773 and 774 at Worli, Mumbai (2 Basement Plus G Plus 4 Floor) Including Electrical work.
2026_PWR_1359075_1
NIT_NO_25_FOR_2026_27
Open Tender
Civil Works
Item Rate
400 days
Worli
As Per Tender Documents
2 documents required · 2 mandatory
₹5,900
₹20.1 L
Chief Engineer, Mumbai P.W. Region,
25 Nov 2026
25 Nov 2026
11 Dec 2026
25 Nov 2026
9 Dec 2026
25 Nov 2026
25 Nov 2026 - 2 Dec 2026
2 Dec 2026
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 2,831.21 | Per One Cubic Metre | - | - |
| 2 | Excavation by using splitters for foundations, substructures, basements, tanks, sumps, walls, chambers, manholes, trenches, poles, pits & general building works in hard rock, reinforced concrete, for depths/lifts upto 1.5M, including drilling, breaking in small pieces, mucking, dressing/trimming the sides, leveling of bottoms, manual dewatering,
removing rank vegetation, backfilling in layers not more than 200mm thickness, watering, consolidating, compacting to achieve not less then 97%
Modified Proctor density conforming to relevant IS, stacking in
measurable heaps for future use within owners space or disposing within an initial lead of 150m as directed by Engineer-in-Charge, loading, unloading, leveling excluding shoring, strutting etc. complete.
Note:
1) The rate includes the handling/supporting the existing utilities such as cables, drains, pipes, water mains etc.
2) It also includes the royalty and other taxes if any.
[Note : Sanction of Director/DMC(SE)/DMC(E) should be obtained for including the above item in BOQ during the approval of Draft Tender.] | 2,419.05 | Per One Cubic Metre | - | - |
| 3 | Excavation by controlled blasting with necessary safety precautions as per statutory requirement, for foundations, substructures, basements, tanks, sumps, walls, chambers, manholes, trenches, poles, pits & general building works in hard rock for depths/ lifts upto 1.5M, including drilling, breaking in small pieces, mucking, dressing/ trimming the sides, leveling/ grading of bottoms, manual dewatering, removing rank vegetation, backfilling in layers not more than 200mm thickness, watering, consolidating, compacting to achieve not less then 97% Modified Proctor density conforming to relevant IS, stacking in measurable heaps for future use within owners space or disposing within an initial lead of 150m as directed, loading, unloading, leveling excluding shoring, strutting etc. complete as directed by Engineer-in- Charge.
Note:
1) The rate includes the handling/supporting the existing utilities such as cables, drains, pipes, water mains etc.
2) It also includes the royalty and other taxes if any. For more details refer General Notes.
R3-CS-EW-7-a Extra over the items CS-EW-03 to CS-EW-06 for lift from 1.5m to 3.0m. | 2,419.05 | Per One Cubic Metre | - | - |
| 4 | Excavation by controlled blasting with necessary safety precautions as per statutory requirement, for foundations, substructures, basements, tanks, sumps, walls, chambers, manholes, trenches, poles, pits & general building works in hard rock for depths/ lifts upto 1.5M, including drilling, breaking in small pieces, mucking, dressing/ trimming the sides, leveling/ grading of bottoms, manual dewatering, removing rank vegetation, backfilling in layers not more than 200mm thickness, watering, consolidating, compacting to achieve not less then 97% Modified Proctor density conforming to relevant IS, stacking in measurable heaps for future use within owners space or disposing within an initial lead of 150m as directed, loading, unloading, leveling excluding shoring, strutting etc. complete as directed by Engineer-in- Charge.
Note:
1) The rate includes the handling/supporting the existing utilities such as cables, drains, pipes, water mains etc.
2) It also includes the royalty and other taxes if any. For more details refer General Notes.
Extra over the items CS-EW-03 to CS-EW-06 for lift from 3m to 4.5m. | 2,419.05 | Per One Cubic Metre | - | - |
| 5 | Excavation by controlled blasting with necessary safety precautions as per statutory requirement, for foundations, substructures, basements, tanks, sumps, walls, chambers, manholes, trenches, poles, pits & general building works in hard rock for depths/ lifts upto 1.5M, including drilling, breaking in small pieces, mucking, dressing/ trimming the sides, leveling/ grading of bottoms, manual dewatering, removing rank vegetation, backfilling in layers not more than 200mm thickness, watering, consolidating, compacting to achieve not less then 97% Modified Proctor density conforming to relevant IS, stacking in measurable heaps for future use within owners space or disposing within an initial lead of 150m as directed, loading, unloading, leveling excluding shoring, strutting etc. complete as directed by Engineer-in- Charge.
Note:
1) The rate includes the handling/supporting the existing utilities such as cables, drains, pipes, water mains etc.
2) It also includes the royalty and other taxes if any. For more details refer General Notes.
Extra over the items CS-EW-03 to CS-EW-06 for lift from 4.5m to 6.0m. | 2,419.05 | Per One Cubic Metre | - | - |
| 6 | Excavation by controlled blasting with necessary safety precautions as per statutory requirement, for foundations, substructures, basements, tanks, sumps, walls, chambers, manholes, trenches, poles, pits & general building works in hard rock for depths/ lifts upto 1.5M, including drilling, breaking in small pieces, mucking, dressing/ trimming the sides, leveling/ grading of bottoms, manual dewatering, removing rank vegetation, backfilling in layers not more than 200mm thickness, watering, consolidating, compacting to achieve not less then 97% Modified Proctor density conforming to relevant IS, stacking in measurable heaps for future use within owners space or disposing within an initial lead of 150m as directed, loading, unloading, leveling excluding shoring, strutting etc. complete as directed by Engineer-in- Charge. Note:1) The rate includes the handling/supporting the existing utilities suchas cables, drains, pipes, water mains etc.
2) It also includes the royalty and other taxes if any. For more details refer General Notes.
Extra over the items CS-EW-03 to CS-EW-06 for lift from 6.0m to 7.5m. | 2,419.05 | Per One Cubic Metre | - | - |
| 7 | Excavation by controlled blasting with necessary safety precautions as per statutory requirement, for foundations, substructures, basements, tanks, sumps, walls, chambers, manholes, trenches, poles, pits & general building works in hard rock for depths/ lifts upto 1.5M, including drilling, breaking in small pieces, mucking, dressing/ trimming the sides, leveling/ grading of bottoms, manual dewatering, removing rank vegetation, backfilling in layers not more than 200mm thickness, watering, consolidating, compacting to achieve not less then 97% Modified Proctor density conforming to relevant IS, stacking in measurable heaps for future use within owners space or disposing within an initial lead of 150m as directed, loading, unloading, leveling excluding shoring, strutting etc. complete as directed by Engineer-in- Charge.
Note:1) The rate includes the handling/supporting the existing utilities such as cables, drains, pipes, water mains etc.
2) It also includes the royalty and other taxes if any. For more details refer General Notes.
Extra over the items CS-EW-03 to CS-EW-06 for lift from 7.5m to 9.0m. | 1,898.97 | Per One Cubic Metres | - | - |
| 8 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 1,662.89 | Per One Square Metre | - | - |
| 9 | Providing and fixing collapsible steel gate in one / two leaves with hot rolled vertical channels of 18 x 9 x 3 mm minimum size, crossings of M.S. flats of size 18 x 5 mm T or E section for runner of minimum 40 x 6 mm size for flange, M.S. flat for top runner of minimum size 40 x 12 mm with roller wheels confirming to grade F.G. 150 fitted with snap headed rivets of minimum size 6 mm max. spacing of vertical channels be 100 mm enclosed gate position and clear space of 150 mm between two sets of crossings with hold fasts, stoppers, spaces, handles, locking arrangement and one coat of red lead primer and oil painting etc. complete. (I.S. 105211983). | 20 | Per One Running Metre | - | - |
| 10 | Cutting down trees including trunks and branches with girths above 30cm to 60cm and stacking the materials neatly with all lifts and lead of 1000m as directed and earth filling in the depression / pit if any. | 40 | Per One Number | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_2318123.xls
BOQ • 0.68 MB
E-25-1.pdf
Tender Documents • 15.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .