Tender Value
₹32.0 Cr
EMD Value
₹64.0 L
Closing Date
8 Oct 2026, 3:00 pm
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
WORKS
16 conditions · 4 needing a document upload
As per Tender Documents Clause 2.3.2(A) (vi) The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less, where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover... .. .. The tenderers shall submit requisite information as per Annexure-I, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
As per Tender Documents Clause 2.3.2(A)(xiv) Tenderer should submit the Bid Capacity For tenders having advertised value more than Rs. 10 crore wherein eligibility criteria includes bid capacity also, the tenderer will be qualified only if its available bid capacity is equal to or more than the total bid value of the present tender.
As per Tender Documents Clause 2.3.2(A) (v) The tenderer must have successfully completed or substantially completed any of the following (by any Government organizations) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender.......................... Note for Technical Eligibility Criteria: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turn over of Rs.500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered atleast 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit alongwith work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Detail instruction as per clause 2.3 of tender document
Similar nature of work:- Similar nature of work are defined as under:- Construction/ rehabilitation of Railway BRIDGES/ ROB /LHS/RUB
18 conditions · 12 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
All bidders are requested to thoroughly read the attached tender documents completely and submit all the documents required as per tender document. Non-submission of documents or documents not in the prescribed format or with any other descripency in comparison to as described in tender document may lead summarily rejection of offer.
The rates are inclusive of GST @ 18%
The rates should be quoted including the payment of octroi/toll tax/sales tax/trade tax or any other tax as leviable by the Central Governmental/State Government/Local Bodies, etc.
Construction of Service building, S&T rooms, gate lodge at level crossing, Rail/ high level passenger platforms, fencing, extension of minor bridges etc. provision of station name board, including dismantling of existing Building structure & fencing, Up gradation/ extension of Level Crossing, Construction of Limited height subway/ Road under bridge in lieu of LC by pushing method of precast box segments under running traffic condition including construction of approaches, provision of height gauges at LHS and L-xings etc. and Linking of BG Track & turnouts, provision of glued joints & SEJs, dismantling of existing track & turnouts, handling, lifting, loading, leading, unloading and spreading of ballast, handling of P.way material including working in BNI/ NI period and other allied works at Dalel Nagar, Chodiala, Aghwanpur station on Lucknow-Moradabad-Saharanapur section in c/with "Longer loops in both direction at Dalel Nagar & Chodiala" and "Extension of Siding to accommodate full train load" in the jurisdiction of Dy CE/C/MB unit on Moradabad division
1-W-Tender-298-Dy-CE-C-MB~NR
1-W-Tender-298-Dy-CE-C-MB
Open
Works - General
12 Months
Moradabad, Uttar Pradesh
₹0
₹64.0 L
16 Sept 2026
16 Sept 2026
24 Sept 2026
698 items across 68 schedules · ₹30,74,38,599.2 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Preparation of foundation for Embankment by clearing, grubbing, stripping top soil (average 150 mm) and stacking beyond foundation area, thereafter ploughing and pulverizing 150 - 200 mm of top of soil with tractor trolley, mixing water to achieve OMC with water sprinkler or left for natural drying, as required, and compaction with vibratory roller of suitable capacity to achieve 98% MDD for laying first layer of soil for embankment construction. | 100 Sqm | 15000.00 | 528.37 | 79,255.5 |
| 2 | Benching of existing embankment manually in steps of 30 cm height for doubling/tripling works in running line to provide proper amalgamation between the old and new embankments as per RDSO latest Specifications and guidelines RDSO/2020//GE: IRS-0004 to the entire satisfaction of Engineer in- charge. The item includes uprooting and disposing of all the vegetation, all lift, descends, ascends and additional earthwork required for filling due to removal of earth in benching in existing bank. Note: (1) The benching Work shall be done for a maximum height of 0.90 m at any time based on the progress of earthwork starting from toe of the embankment. (2) Benching work shall be certified and recorded before starting the earth work. (3) Unit for payment shall be km per metre height of the Bank. Height here means representative average height of the bank in the specified km taken from cross sectional measurements for earthwork. (4) Since the rate includes earthwork in steps, payment under this item shall be made after completion of earthwork to that level. (5) Cut soil from bank shall not be used in embankment construction and disposed off away from bank as per the direction of Engineer-in-charge. | Kilometre | 0.30 | 1,53,238.46 | 45,971.54 |
| Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, platforms etc. with contractor's own earth conforming to Soil Quality Class SQ1/SQ2/SQ3, after preparation of foundations as applicable, benching in existing banks wherever required, spreading in layers with motor grader, bringing the moisture content to OMC, mechanical compaction to specified density and dressing of bank to final profile as per RDSO Specifications: RDSO/2020/GE: IRS-0004 with latest correction slips. Note: 1) Foundation preparation, Benching including additional earthwork on account of this, wherever required, shall be paid extra under relevant schedule item for benching. 2) Payment for Earthwork under this item shall be made based on the cross section measurements calculated (i) with original ground profile of existing bank based on initial ground levels before doing benching and (ii) final profile of the bank worked out with final levels as per prevailing guidelines. | — | — | — | — | |
| 3 | Using Soil Class SQ1 | cum | 13000.00 | 319.97 | 41,59,610 |
| 4 | Using Soil Class SQ2 | cum | 55038.50 | 352 | 1,93,73,552 |
| Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge of the cutting(s) including all lifts, ascent, descent, loading, unloading, bailing & pumping out water, if required, clearance of site and all other works incidental thereto for completing the work as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest updated correction slips and to the satisfaction of the Engineer-in- Charge. Note: (i) All usable earth arising from cut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked away from toe of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked by the contractor and will be property of the Railways. (iii)Cut trees shall be property of Railways and to be deposited in the railway godown unless specified otherwise in the Conditions of Contract. | — | — | — | — | |
| 5 | In all conditions and classifications of soil except rock | cum | 8702.00 | 107.35 | 9,34,159.7 |
| 6 | Mechanical manufacturing of blanketing material by using only hard and durable stone crushed in mechanical crusher to different gradations, wet mixing of the same in designed proportion in Pug mill or wet mix plant to have uniform gradation including all incidental transportation, laying over finished formation in uniform layer(s) with motor grader, compaction with suitable vibratory roller to specified density and finishing to correct profile, complete as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest correction slips. Note: This item shall be used only when entire constituent of blanketing material is mechanically manufactured by crushing of hard and durable stone into desired gradation of designed proportion. | cum | 8517.10 | 2,706.13 | 2,30,48,379.82 |
| Turfing / planting, including all lead & lift and watering as required until properly rooted with. Note: Initially payment of only 40% will be made. Balance 60% will be paid after 3 months of maintenance period, only if the turfing is properly rooted on entire turfed area. | — | — | — | — | |
| 7 | Turfing with sods, 10cm thick and 20cm square closely laid. | 100 Sqm | 1500.00 | 27,446.45 | 4,11,696.75 |
| 8 | Turfing with planted doob grass. | 100 Sqm | 9054.00 | 30,959.88 | 28,03,107.54 |
| P r o v id in g portable fencing along running track where work is to be done in close vicinity of track, maintaining during execution of work and removing after completion of the work as per direction of the Engineer. Fencing shall consist of self supporting steel angles of size 50mm x 50mm x 6mm, 1.5m long provided with hooks etc. and embedded in CC 1:2:4 block of size 0.23m x 0.23m x 0.23m placed at c/c distance of 2m along track. 12mm dia rods in three horizontal layers shall be tack welded with angle posts. Note : Released material will be property of the contractor after completion of work. Cost of cement required for CC blocks shall be paid separately. | — | — | — | — | |
| 9 | With provision of one 50mm wide retro-reflective tape in horizontal direction, duly secured/tight with vertical posts. | Metre | 2350.00 | 261.56 | 6,14,666 |
| 10 | With provision of painting verticals & horizontals with red luminous paints / strips of 30cm each with a gap of 30 cm. | Metre | 500.00 | 152.11 | 76,055 |
| Supplying, laying Non-woven Needle Punched and Mechanically or Thermally bonded type Geotextile for use as Separator/Filtration for Railway formation as per RDSO Specification No. RDSO/2018/GE:IRS- 0004 - Part I made of Polypropylene / Polyethylene / Polyamide or combination there of having apparent opening size of less than or equal to 85 microns and elongation at failure more than 50% in both directions including transportation labour, lead & lift complete as directed by Engineer in-charge. | — | — | — | — | |
| 11 | On top of subgrade or prepared subgrade before laying blanketing layer with minimum strengths in Grab test, Trapezoidal Tear test and Puncture test of 700N, 250 N and 1800 N respectively. | Sqm | 14000.00 | 248.62 | 34,80,680 |
| 12 | Supplying & laying of drainage composite for use behind abutments, wing walls, return walls and Retaining walls Geocomposite drain (Vertical) as per RDSO Specification No. RDSO/2018/GE:IRS-0006 latest version with all material, labour, equipment, tools and plants, lead, lift etc. complete in all respects as per the direction of Engineer-in-Charge. | Sqm | 500.00 | 626.86 | 3,13,430 |
| Schedule total | ₹5,53,40,563.85 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderDocumentofAWPDLQCDL.pdf
ATTACHMENT
StandardConditionsforCDLDLQAWP.pdf Standard Conditions
ATTACHMENT
StandardConditionsforCDLDLQAWP.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .