Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.4 LAccepted-AOC | ₹15.4 L | L1 | Accepted-AOC AOC ISSUE |
| 2 | L2₹15.4 L+₹3,113.23 (0.20%)Rejected-Finance | ₹15.4 L+₹3,113.23 (0.20%) | L2 | Rejected-Finance L2 Bidder |
| 3 | L3₹15.6 L+₹18,679.36 (1.21%)Rejected-Finance | ₹15.6 L+₹18,679.36 (1.21%) | L3 | Rejected-Finance L3 Bidder |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹15.6 L
EMD Value
₹1.6 L
Closing Date
5 May 2026, 3:00 pmClosed
Chief Engineer, KNN
Chief Engineer office, KNN, Motijheel
Improvement work by C.C. from H.no.-100/188 to 100/126 and from 100/123 to 100/444 Bada maidan ward-97 zone-4.
2026_NNKAN_1142798_1
699/AA-4/25-26
Open Tender
Civil Works
Percentage
60 days
ward-97
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹1.6 L
6 Jun 2026
30 Apr 2026
5 May 2026
30 Apr 2026
5 May 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of cement concrete or brick or granolithic floors including base concrete and including stacking of materials as directed by engg. i/c. within a distance of 60mtr | 703.96 | sqm | 67 | ₹47,165.32 |
| 2 | Dismantling of B.O.E. Soling/interlocking tiles including stacking of sericable material and disposal of unservicable material witrhin a lead of 50m as per direction of E/I | 66.85 | sqm | 11 | ₹735.35 |
| 3 | Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5 m in width as well 10 sqm on plan including getting out | 7.2 | cum | 174 | ₹1,252.8 |
| 4 | Providing and laying in position cement cocrete of specified grade excluding the cost of centering and shuttering - All work up to the plinth level in 1:4:8 (1 cement: 4 | 0.64 | rmt | 5,220 | ₹3,340.8 |
| 5 | Providing, laying and jointing of 300mm dia R.C.C. NP-2 hume pipe with all charges complete. | 10 | cum | 771.1 | ₹7,711 |
| 6 | Construction of granular sub base (GSB) by providing coarse graded 6 material, spreading in uniform layer with mortor grader on prepared surface, mixing by mixin place | 100.15 | cum | 3,671 | ₹3,67,650.65 |
| 7 | Providing and laying in position cement cocrete of specified grade excluding the cost of centering and shuttering - All work up to the plinth level in 1:1.5:3 (1 cement: 1.5 coarse sand ízone-ⅲ) 3 graded stone | 100.15 | sqm | 7,160 | ₹7,17,074 |
| 8 | Providing and laying of 125micron plastic sheet etc all complete. | 1,001.49 | sqm | 18 | ₹18,026.82 |
| 9 | Additional of non metallic C.C. surface hardner etc all complete. | 1,001.5 | sqm | 96.25 | ₹96,394.38 |
| 10 | Brick work with common burnt clay 1 (non modular) bricks of class-150 in foundation and plinth in cement mortar 1:4 (1 cement: 4 coarse sand) | 0.92 | cum | 6,600 | ₹6,072 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2134245.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.60 MB
BOQ_2134245.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .