| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.2 LAccepted-AOC 5A 582 CALDWELL COLONY TUTICORIN 628008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | ₹12.2 L Quoted ₹14.4 L | 1 | Accepted-AOC L1 |
| 2 | 2₹14.9 LRejected-AOC | ₹14.9 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | C.S.R ENTERPRISES L2 | CKEE ENGINEERING PRIVATE LIMITED L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for cleaning ash deposit from the impeller and inside casing and checking the blades, in one ID Fan | 8 | No. | 65,072 ₹76,784.96 | 63,072 ₹74,424.96 |
| 2.00 | Charges for arresting water/oil leakages in the lub oil cooler provided in the ID fan. | 4 | No. | 26,568 ₹31,350.24 | 25,748 ₹30,382.64 |
| 3.00 | Charges for checking of water leakages and arresting, checking of oil rings and renewing the same with new one if necessary in ID fan bearing housing. | 6 | No. | 85,668 ₹1.0 L | 83,034 ₹97,980.12 |
| 4.00 | Charges for arresting oil leakages in main drive system in APH by changing oil seal and commissioning. | 6 | No. | 53,826 ₹63,514.68 | 52,170 ₹61,560.60 |
| 5.00 | Charges for alignment of APH drive motor with speed reducer through fluid coupling. | 6 | No. | 44,520 ₹52,533.60 | 43,152 ₹50,919.36 |
| 6.00 | Charges for overhauling of APH lub oil pumps and valves for Support bearing and guide bearing.
This work includes Dismantling, cleaning, Inspection of bearings, Gears, internals and replacement of the same if required then reassembling and alignment works etc | 8 | No. | 1,25,832 ₹1.5 L | 1,21,960 ₹1.4 L |
| 7.00 | Charges for removal and relaying of insulation in ID Fan, APH, ESP and their ducts etc., including scaffolding charges. | 40 | Sq. M. | 44,880 ₹52,958.40 | 43,480 ₹51,306.40 |
| 8.00 | Charges for transporting of 6mm M.S. Chequered plates from stores to Boiler area, cutting into required size, leading, lifting, positioning on the eroded portions of above 1.5 meter side wall portion of the duct/platforms and welding the same. | 12 | Sq. M. | 32,928 ₹38,855.04 | 31,920 ₹37,665.60 |
| 9.00 | Charges for removing the existing eroded duct supports, supports in Boiler Area and transporting of new pipes/angles/channels from Central Stores, cutting into required size leading lifting, positioning and welding. | 64 | M | 21,824 ₹25,752.32 | 21,120 ₹24,921.60 |
| 10.00 | Charges for renewal of sector plate adjuster rod assembly (or) Connecting plate of axial seal plate to sector plate at hot (or) cold ends (or) Repairing of defective APH soot blowers (or) Renewal of Air Motor (or) Inspection and correction of radial seals & removal of foreign materials from the rotor. | 12 | No. | 1,88,700 ₹2.2 L | 1,82,892 ₹2.2 L |
Tender Value
Refer Docs
EMD Value
₹10,100
Closing Date
22 Dec 2025, 2:00 pmClosed
CE/ TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin
TTPS Mech II BM Unit IV V Attending Breakdown works in ID Fans APHs structural supports and platforms and Clearing of Coal powder from Airpreheater outlet to ESP inlet of Flue Gas Duct path A B C D of Unit IV V for the period from 01 04 2026 and upto
2025_EB_629330_1
CE/TTPS/SE/M-II/No.04/2026-27
Open Tender
Miscellaneous Works
365 days
TTPS
As per BQR conditions in NIT
8 documents required · 8 mandatory
₹0
₹10,100
Yes
20 Mar 2026
5 Dec 2025
23 Dec 2025
5 Dec 2025
22 Dec 2025
5 Dec 2025
Charges for cleaning ash deposit from the impeller and inside casing and checking the blades, in one ID Fan
Charges for arresting water/oil leakages in the lub oil cooler provided in the ID fan.
Charges for checking of water leakages and arresting, checking of oil rings and renewing the same with new one if necessary in ID fan bearing housing.
Charges for arresting oil leakages in main drive system in APH by changing oil seal and commissioning.
Charges for alignment of APH drive motor with speed reducer through fluid coupling.
Charges for overhauling of APH lub oil pumps and valves for Support bearing and guide bearing. This work includes Dismantling, cleaning, Inspection of bearings, Gears, internals and replacement of the same if required then reassembling and alignment works etc
Charges for removal and relaying of insulation in ID Fan, APH, ESP and their ducts etc., including scaffolding charges.
Charges for transporting of 6mm M.S. Chequered plates from stores to Boiler area, cutting into required size, leading, lifting, positioning on the eroded portions of above 1.5 meter side wall portion of the duct/platforms and welding the same.
Charges for removing the existing eroded duct supports, supports in Boiler Area and transporting of new pipes/angles/channels from Central Stores, cutting into required size leading lifting, positioning and welding.
Charges for renewal of sector plate adjuster rod assembly (or) Connecting plate of axial seal plate to sector plate at hot (or) cold ends (or) Repairing of defective APH soot blowers (or) Renewal of Air Motor (or) Inspection and correction of radial seals & removal of foreign materials from the rotor.
Charges for checking of any oil leak from APH guide bearing, support bearing, & ID Fan lub oil system, cleaning and removing of fire hazardous materials such as oil soaked cotton wastes, wooden pieces, coal powder from APH Bearing areas & ID Fan lub oil system areas in one unit including charges for T&P’s and consumables.
Charges for cleaning the ash from Airpreheater hoppers and duct portion and disposals including cost of consumables .
Charges for dynamic balancing of ID fans by putting trial weight checking and observing the vibration readings up to normal operating condition including preparing various range of weight and welding / removing in the impeller including charges for T&P’s and consumables.
Charges for Clearing of coal powder and spread coal over the Flue gas duct path A,B,C & D below feeder floor end to ESP inlet and related structures etc., Cleaning of Flue gas duct, removal of other foreign materials, any fire hazardous material from Airpreheater outlet to ESP inlet of Flue Gas Duct path A, B, C & D in Unit IV
Charges for Clearing of coal powder and spread coal over the Flue gas duct path A,B,C & D below feeder floor end to ESP inlet and related structures etc., Cleaning of Flue gas duct, removal of other foreign materials, any fire hazardous material from Airpreheater outlet to ESP inlet of Flue Gas Duct path A, B, C & D in Unit V
C.S.R ENTERPRISES (BID ID -1538297)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_752543.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid