Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.2 LAccepted-Finance | ₹59.2 L | L1 | Accepted-Finance Lowest Rate Quoted Than L2 AND L3 |
| 2 | L2₹65.5 L+₹6.3 L (10.7%)Accepted-Finance | ₹65.5 L+₹6.3 L (10.7%) | L2 | Accepted-Finance Highest Rate Quoted Than L1 |
| 3 | L3₹65.8 L+₹6.6 L (11.1%)Accepted-Finance | ₹65.8 L+₹6.6 L (11.1%) | L3 | Accepted-Finance Highest Rate Quoted Than L1 AND L2 |
Tender Value
₹73.6 L
EMD Value
₹73,594
Closing Date
18 Mar 2026, 6:00 pmClosed
Executive Engineer
Executive Engineer, Kharland Survey and Investigation Division, Pen, Dist. Raigad.
Construction of SG at Ch. 2335 m.of Narangi kharland scheme Tal. Alibag, Dist. Raigad.
2026_CWRDK_1285646_1
E-TENDER NOTICE NO.11 FOR 2025-26
Open Tender
Civil Works
Percentage
365 days
Alibag
Please Refer Tender Documents.
2 documents required · 2 mandatory
₹2,360
₹73,594
20 Aug 2026
11 Mar 2026
20 Mar 2026
11 Mar 2026
18 Mar 2026
11 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of SG at Ch. 2335 m.of Narangi kharland scheme Tal. Alibag, Dist. Raigad. | 1 | As Per DTP | 70,52,047.35 | ₹70,52,047.35 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 2.07 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.78 MB
BOQ_2210901.xls
BOQ • 0.37 MB
NarangiDTP.pdf
Tender Documents • 3.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .