| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.4 LAdmitted-Finance | ₹47.4 L | L1 | Admitted-Finance |
| 2 | L2₹48.3 LAdmitted-Finance VILL P O AMJAI BARDHAMAN BARDHAMAN 713203 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713203 | ₹48.3 L | L2 | Admitted-Finance |
| 3 | L3₹48.4 LAdmitted-Finance | ₹48.4 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K R ENTERPRISE L1 | F.R. ENTERPRISE L2 | N.K. ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00Part A:Installation of 11 X Dip 1200mm complete belt conveyor for a length of 90 metre at CM 4 Panel 11 | ||||||
| 1.01 | Transportation of one 6.6KV VCB, DOL HT Starter from 8L/1D to 47Dip/-3L after loading it on MUV then unloading and placing manually on platform | 1 | WORK | 11,250 ₹11,250 | 11,475 ₹11,475 | 11,497.95 ₹11,497.95 |
| 1.02 | Transportation of 500 mtr., 6.6KV grade 120 Sq.mm armoured cable from surface to cm panel with the help of MUV and laying and hanging it at underground | 1 | WORK | 47,650 ₹47,650 | 48,603 ₹48,603 | 48,700.21 ₹48,700.21 |
| 1.03 | Transportation and installation of drive head Complete with Drive Drum, Driven Drum, Gear Box, Motor, Couplings, Bearing Blocks, Fenching etc. to CM panel with the help of MUV | 1 | WORK | 6,69,828 ₹6.7 L | 6,83,224.56 ₹6.8 L | 6,84,591.01 ₹6.8 L |
| 1.04 | Transportation and installation of Discharge Unit Complete with Cleaner at CM panel with the help of MUV | 1 | WORK | 76,380 ₹76,380 | 77,907.6 ₹77,907.60 | 78,063.42 ₹78,063.42 |
| 1.05 | Transportation and installation of Loop Take-up Unit Complete with fencing at CM panel with the help of MUV | 1 | WORK | 86,720 ₹86,720 | 88,454.4 ₹88,454.40 | 88,631.31 ₹88,631.31 |
| 1.06 | Transportation and installation of Tail-end Unit Complete at CM panel 6 with the help of MUV | 1 | WORK | 17,640 ₹17,640 | 17,992.8 ₹17,992.80 | 18,028.79 ₹18,028.79 |
| 1.07 | Transportation and installation of 90 mtr. of belt structure, after loading it on MUV at CM panel (weight of 1200mm structures is 0.085 Te/mtr. ) | 1 | WORK | 1,09,548 ₹1.1 L | 1,11,738.96 ₹1.1 L | 1,11,962.44 ₹1.1 L |
| 1.08 | Transporting, laying, lapping & jointing of 200 mtr. of belting (20 mtr. belt in loop ) | 1 | WORK | 45,000 ₹45,000 | 45,900 ₹45,900 | 45,991.8 ₹45,991.80 |
| 1.09 | Laying of Sequence cable(100m), pull cord, lockout cable and audio cable throughout the belt line of 90 metre. Fitting of pull chord switches and communication devices along the belt. | 1 | WORK | 16,320 ₹16,320 | 16,646.4 ₹16,646.40 | 16,679.69 ₹16,679.69 |
Tender Value
₹47.4 L
EMD Value
₹59,300
Closing Date
17 Feb 2026, 11:00 amClosed
AREA ENGINER ENM
Office of the General Manager, JHNAJRA AREA, ECL
Transportation, Installation, Commissioning, Necessary Fabrication and Trial run including Civil work of two nos. of 1200 mm width 2x150KW, 6.6KV PVC Belt Conveyor phase wise for a total length of 1240 mtr. from 11XD -2L to 11XD 29L CM Panel-11 in R
2026_ECL_352500_1
ECL/GM/JNR/EnM/A2/25-26/123 dated 04.02.2026
Open Tender
Miscellaneous Works
30 days
JHANJRA UG
Please refer Tender documents.
4 documents required · 4 mandatory
₹59,300
22 Feb 2026
6 Feb 2026
18 Feb 2026
6 Feb 2026
17 Feb 2026
7 Feb 2026
6 Feb 2026 - 13 Feb 2026
Part A:Installation of 11 X Dip 1200mm complete belt conveyor for a length of 90 metre at CM 4 Panel 11
Transportation of one 6.6KV VCB, DOL HT Starter from 8L/1D to 47Dip/-3L after loading it on MUV then unloading and placing manually on platform
Transportation of 500 mtr., 6.6KV grade 120 Sq.mm armoured cable from surface to cm panel with the help of MUV and laying and hanging it at underground
Transportation and installation of drive head Complete with Drive Drum, Driven Drum, Gear Box, Motor, Couplings, Bearing Blocks, Fenching etc. to CM panel with the help of MUV
Transportation and installation of Discharge Unit Complete with Cleaner at CM panel with the help of MUV
Transportation and installation of Loop Take-up Unit Complete with fencing at CM panel with the help of MUV
Transportation and installation of Tail-end Unit Complete at CM panel 6 with the help of MUV
Transportation and installation of 90 mtr. of belt structure, after loading it on MUV at CM panel (weight of 1200mm structures is 0.085 Te/mtr. )
Transporting, laying, lapping & jointing of 200 mtr. of belting (20 mtr. belt in loop )
Laying of Sequence cable(100m), pull cord, lockout cable and audio cable throughout the belt line of 90 metre. Fitting of pull chord switches and communication devices along the belt.
Supply of M.S. Nut & Bolt 5/8x2"
Supply of G.I. wire 8 SWG
Supply of Bobin insulator
Supply of M.S. Nut & Bolt 3/8''x 3" with washer
Civil foundation work for drive head, discharge, loop takeup and platform
Part B. Installation of 1200mm wide PVC belt conveyor structure ( 11 X Dip) for a length of 610 mtr. i.e total 13 pillar in R-V seam of CM-4 section at MIC, Jhanjra Project Colliery.
Transportation and Installation of 610mtr. of belt structure, after loading it on MUV from surface(weight of 1200mm structures is 0.085MT/mtr.)
Transporting, laying, lapping & jointing of 1220 mtr. of belting (0.9*194*1220)
Shifting and installation of tail end for every shifting( 13 times extension ) (wt = 1*13 Te=13Te)
Laying of pull chord, lockout cable and audio cable throughout the belt line of 610 metre. Fitting of pull chord switches and communication devices along the belt.
Supply of M.S. Nut & Bolt (M16x40)
Supply of Bobin insulator
Supply of M.S. Nut & Bolt 3/8''x 3" with washer
Supply of G.I wire 8 SWG
Part C. Installation of 11 X Dip Tandem belt of 1200mm complete belt conveyor for a length of 90 metre at CM 4 Panel 11
Transportation of one 6.6KV, DOL HT Starter from 8L/1D to 7Dip/- 3L after loading it on MUV then unloading and placing manually on platform
Transportation of 500 mtr., 6.6KV grade 120 Sq.mm armoured cable from surface to cm panel with the help of MUV and laying and hanging it at underground
Transportation and installation of drive head Complete with Drive Drum, Driven Drum, Gear Box, Motor, Couplings, Bearing Blocks, Fenching etc. to CM panel with the help of MUV
Transportation and installation of Discharge Unit Complete with Cleaner at CM panel with the help of MUV
Transportation and installation of Loop Take-up Unit Complete with fencing at CM panel with the help of MUV
Transportation and installation of Tail-end Unit Complete at CM panel 6 with the help of MUV
Transportation and installation of 90 mtr. of belt structure, after loading it on MUV at CM panel (weight of 1200mm structures is 0.085 Te/mtr. )
Transporting, laying, lapping & jointing of 200 mtr. of belting (20 mtr. belt in loop )
Laying of Sequence cable(100m), pull cord, lockout cable and audio cable throughout the belt line of 90 metre. Fitting of pull chord switches and communication devices along the belt.
Supply of M.S. Nut & Bolt 5/8x2"
Supply of G.I. wire 8 SWG
Supply of Bobin insulator
Supply of M.S. Nut & Bolt 3/8''x 3" with washer
Civil foundation work for drive head, discharge, loop takeup and platform
Part D: Installation of 1200mm wide PVC belt conveyor structure ( 11 X Dip Tandem) for a length of 450 mtr. i.e total 10 pillar in R-V seam of CM-4 section at MIC
Transportation and Installation of 450mtr. of belt structure, after loading it on MUV from surface(weight of 1200mm structures is 0.085MT/mtr.)
Transporting, laying, lapping & jointing of 900 mtr. of belting
Shifting and installation of tail end for every shifting(10 times extension )(wt = 1*10 Te=10Te)
Laying of pull chord, lockout cable and audio cable throughout the belt line of 450 metre. Fitting of pull chord switches and communication devices along the belt.
Supply of M.S. Nut & Bolt (M16x40)
Supply of Bobin insulator
Supply of M.S. Nut & Bolt 3/8''x 3" with washer
Supply of G.I wire 8 SWG
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.48 MB
Tendernotice_2.pdf
PDF • 1.20 MB
BOQ_365290.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid