Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹9.0 LAccepted-Finance | L-1 | Accepted-Finance Admitted | |
| 2 | L-2₹9.0 L+₹4,154.50 (0.46%)Accepted-Finance 0 MARUFPUR MARYADPUR MADHUBAN MAU MAU UTTAR PRADESH 221602 | MAU | UTTAR PRADESH | 221602 | L-2 | Accepted-Finance Admitted | |
| 3 | Not Admitted-Fee/PreQual/Technical GRAM POST SATHIYAV MUBARAKPUR DISTRICT AZAMGARH | AZAMGARH | UTTAR PRADESH | 223221 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹11.6 L
EMD Value
₹12,000
Closing Date
16 Dec 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle, 220 KV S/S Mirzapur
Regular/Preventive/breakdown maintenance of 132/33 KV S/S Mirzapur under ETD Mirzapur
2021_UPTCL_644829_1
34/2021-22/ETC/Mzp
Open Tender
Electrical Works
Fixed-rate
365 days
Mirzapur
as per tender specification
2 documents required · 2 mandatory
₹1,416
Executive Engineer, ETD, Mirzapur
₹12,000
4 Feb 2022
18 Nov 2021
17 Dec 2021
18 Nov 2021
16 Dec 2021
18 Nov 2021
180 days
Amount
Routine checking and maintenance work of (2X63) MVA T/F including checking and maintenance of oil level in conservator, OLTC gear casing , divertor switching, breather, bushing, oil leakage, silica gel colour, AC supply, noise and vibrations etc. complete the job satisfactorily with all man and T&P ( Required consumable materials shall be provided by department.)
Routine checking and maintenance of 132 KV & 33 KV CTs and PTs including checking of oil level, oil leakage and filling of t/f oil upto required level, cleaning of dust on insulator, tightening of wiring on TB in junction box. Complete the job satisfactorily with all men and T&P (Consumable material shall be provided by department.)
Periodical checking and maintenance of capacitor bank by the way of visual examination of bank for fouling, leakage of capacitor unit, oil level and oil leakage, cleaning of insulators and bushings. complete the job satisfactorily with all man and T&P ( Required consumable materials shall be provided by department.)
Changing of Interrupter in 33 KV CB pole by conducting following works : i. Opening of existing Jumpers of damaged CB Pole interrupter. ii. Dismantling of damged CB pole interrupter by opening of upper termainal plate of CB pole. iii. Replacement of defective pole interrupter by new one,fixing of interconnecting rod and fixing of upper terminal plate and then checking the CB mechanism for proper operation. iv.Shifting of all scrap/damged part to store.
Replacement of defective/damaged CB pole by conducting following works: - i.Opening of Jumpers of defective/damaged pole by dismantling after detaching it from operating shaft of the CB. ii.Shifting of the defective/damaged pole from switchyard to store and shifting of the new / good condition pole, from store to the site. iii.Erection of the good condition dismantled/new pole and get it connected with CB operating Shaft and then get jumpers connected to the pole. iv.Shifting of all scrap/damged part to store.
Regular maintenance of Battery Cell with reading (voltage, Specific Gravity, temperature, etc), cleaning, make up of distilled water, greasing & tightening of leads of Battery set. Battery water, petrollium jelly, cotten cloth etc consumable material including in cost ( Except new battery cell repairing )
110 V 200 AH Battery Set (55 cell)
48 V 300AH Battery Set (24 cell)
Daily general cleaning and maintenance of control room, associated office, battery room, cleaning of washroom, wash basin along with cleaning of associated toilets cover at sub-station with Acid, Phenyl/Harpic etc. including cost of men, material and T&P.
Cleaning of jungles including up-rooting of rank vegitation grass, bushes and scrapping of grass above 2 cms over ground level, collection of foreign materials, papers, plastics including cleaning of drainage, trench cover Complete the job satisfactorily using herbisides with all man and T&P .
First cutting between within 3 month of LOI/Agreement date
Second cutting after three month of First cutting
Third cutting after three month of second cutting
Fourth cutting after three month of third cutting
Tightening of nuts bolts, cleaning of insulators, and replacement of defective clamps/Connector of various equipment in all 132 &33 kv bays in 132/33 KV switchyard Complete the job satisfactorily with all man and T&P. ( Materials shall be provided by department.)
First job in the month of March-April (before summer season ) as per availability of shutdown
Second job in the month of September-October (before festive season) as per availability of shutdown
Replacement of damaged Jaw/blades of 132KV & 33 KV isolators by the way of opening of defective jaw and blade its tightening after removing connected jumpers and its proper re-jumpering including lubricating of Jaw/Blade .Complete the job satisfactorily with all man and T&P . ( Materials shall be provided by department.)
132 KV side
33 KV side
Replacement of jumper from bus-bar to equipment
1 x Panther
2 x Panther
2 x Moose
Replacement of jumpers from equipments to equipments
1X Panther
2x Panther
2x Moose
Dismantling of following equipments by opening of nut and bolts, opening of jumpers, cable connections, earthing and shifting up to store/designated place in the yard as per direction of supervising engineer at 132kV sub-station Mirzapur
145KV instrument transformer (CT/PT)
145KV post insulator
120KV lightning arrester
36 KV 3 phase VCB
36KV 1-Phase CT
36KV 1-Phase PT
30KV 1-phase LA
32/22/18KV post insulator
Erection of following equipment as per instruction manual of various equipments and technical specification including shifting of material/ equipment item store to erection site including all other associated work to complete the job satisfactory.at 132kV sub-station Mirzapur
145KV instrument transformer (CT/CVT)
145KV post insulator
120KV lightning arrester
36 KV 3 phase VCB
36KV 1-Phase CT
36KV 1-Phase PT
30KV 1-phase LA
32/22/18KV post insulator
Removal of complete sodium/LED light fitting assembly from poles/tower/ plateform building etc.
Upto 10 Meter
Fixing of sodium/LED light fitting assembly from poles/tower/ plateform building etc.
Upto 10 Meter
In junction/Marshalling box
Replacement of MCB
Replacement of fuse grip
Replacement of damaged Control/Power cable in original position including taking out damaged cable from cable trench and shifting to Store.
Repairing and overhauling of cooling fan of power transformers
Rewinding of cooling fan of power transformers if reuired to do so
Repairing and overhauling of Exahust Fan of Control room and Battery Room
Rewinding of Exahust fan of Control room and Battery room if reuired to do so
Complete Overhauling of 132KV & 33 KV Bus (Main Bus 'A' and 'B'), Line/feeder Isolators and Transformer isolator of different make. The work includes lifting of moving parts with derik pole, dismantling of bearing, its proper cleaning with petrol, replacement of bearing, if required, filling with grease / lubricant properly, reassembling and fixing, cleaning of jaw / blades by rubbing with emery paper, applying petroleum jelly and realignment of isolator and its proper checking of smooth operation (Rate includes cost of labour, T&P, and consumable material required including bearing).
33 KV Side
Operation of Pump motor in S/S Colony Premises alongwith control room.
Ms Ramawati Construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .