Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 4863 DUKLI AGARTALA WEST TRIPURA 799004 | AGARTALA | WEST TRIPURA | TRIPURA | 799004 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹45,000
Closing Date
16 Dec 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER JAL SHAKTI (M) GW
EXECUTIVE ENGINEER JAL SHAKTI (M) GW
AS PER BOQ
2023_PHE_239733_1
e-NIT No. GWD/196 of 2023-24
Open Tender
Drilling Works
Item Rate
30 days
AS PER BOQ
AS PER SBD
7 documents required · 7 mandatory
₹1,000
EXECUTIVE ENGINEER JAL SHAKTI (M) GW
₹45,000
Yes
OFFICE OF THE EXECUTIVE ENGINEER JAL SHAKTI (M) GW
20 Dec 2023
9 Dec 2023
18 Dec 2023
9 Dec 2023
16 Dec 2023
11 Dec 2023
11 Dec 2023
Amount
Deep Drilling, Development & Stabilization of 200 mm dia mini Tube well along with providing, lowering, testing and commissioning of submersible pump set (on EPC Mode) AICRP Maize Centre, Rakh Sansoo in District Udhampur under Capex Budget (2023-24)
Setting up of drilling site by way of shifting of requisite machinery and other allied material after making proper approaches as per the requirement at site
Boring/drilling 200 mm dia. Bore Well till sufficient aquifer Zone/discharge is encountered maximum upto 140 meter below ground level by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200 mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment / tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately)
Supplying, assembly (including welding)n, lowering and fixing in vertical position in the bore well. ERW (Electric Resistance Welded) FE 410 Mild Steel Bevelled ended 200 mm dia. Casing Pipes conforming to IS: 4270 of reputed and approved make including painted with outside surface with two coats of anti-corrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths. The cost includes transportation, loading, unloading and stacking/handling at site. Complete Job.
Development and Stabilization to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
Providing, fitting, installation, testing and commissioning of submersible pump set (preferable make viz. KSB, Crompton, Kirlosker, CRI or equivalent make conforming to relevant IS Code) of suitable parameters depending upon the depth and discharge of the bore hole. Fabrication of riser pipes from G.I pipe 50mm dia. minimum or suitable as per discharge encountered by way of cutting of pipes in length of 3 mtr each and joining by way of welding of M.S. Flanges on both sides in proper alignment or with G.I socket. Lowering of pump into bore hole by way of coupling of riser pipes and making electric connections with starter panel, fabrication of lid for bore hole along with installation of bend/elbow for delivery of water. Job includes cost of pipes carriage of pipes with fittings to site of work. Providing, fitting and installation of starter cum control panel of single phase fully automatic starter in sheet enclosure outdoor type conforming to IS standard. Providing and laying of required copper 3 core submersible cable and making connections with the starter panel, service line and submersible pump set. Job also includes providing, installation of 3 phase LT control panel with safety features, 3 phase voltage stabilizers with MCCS, submersible cable & LT cables of required capacity at site. Testing of joints for leaks and running of pump on full load. Complete job includes cost of material, labgour, T&P, carriage and transportation charges at site.
M/S SHREE BAJRANG BALI CONTRACT COMPANY
Hyper Techno Drillers Private LTD
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .