Tender Value
₹4.4 Cr
EMD Value
₹8.9 L
Closing Date
29 Jun 2026, 2:00 pm4d left
Similar tender results from the same govt authority in the past 3 years.
Chief Engineer Irrigation Assam
o-o the Chief Engineer Irrigation Assam Chandmari Guwahati-03
Remodelling and Improvement of Behali FIS under SOPD-G for the year 2025-2026 under Biswanath Behali Division _I_ Biswanath Chariali of Assam
2026_ID_52639_1
ACE_IMP_MI_T_E-691992/227 Date_05_06_2026
Open Tender
Civil Works
365 days
Biswanath
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,000
₹8.9 L
Yes
6 Jun 2026
6 Jun 2026
29 Jun 2026
6 Jun 2026
29 Jun 2026
15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Restoration and Strengthing of Canal Embankment and Canal Bed | |||||
| 1.01 | Earthwork in excavation in irrigation canal to the design section and grade by depositing the spoils in the form of embankment in 15 cm layers on both banks as necessary including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment with a lead upto 30 M and lift upto 1.50 M, complete as directed.
(A) In ordinary Soil | - | cum | 306.66 | - |
| 1.02 | Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity). | 1 | cum | 847.2 | ₹846.35 |
| 2Construction of C.C. Lining at Canal System (Chainage 180 m to 612.45 m of Left Canal = 432.45 m) | |||||
| 2.01 | Labour for preparation of subgrade of lined canal section as per design drawing and grade by ramming and rolled to level and according to the required cross section of the typical lined canal including cutting, filling the existing canal section where necessary compacting the earth in layers in not more than 15 cm thick to form a firm compacted bed & side for lining including watering to obtain required moisture content where necessary etc, complete as directed.
(i) For ordinary soil | 1 | sqm | 66.91 | ₹66.84 |
| 2.02 | Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing. | 1 | sqm | 843.18 | ₹842.34 |
| 2.03 | Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).
Shuttering (Beam) without Prop. | - | sqm | 223.16 | - |
| 2.04 | CC Work in lined canal in prop 1:2:4 with river shingles of size 6mm to 20mm free from dust, dirt and other foreign materials conforming to I.S 2116-1965 and 542-1962 as specified by the department, water used for mixing the mortar should be free from all impurities including laying the concrete over the subgrade, moistened thoroughly by hand placing/mechanical placing in canal of not more than 3.00m sides with suitable joints in between including providing bed sleepers (cast-in-situ or pre cast) under joints in between including providing all sealing materials as per design and drawing before laying concrete including finishing the surface smooth, clean of all impurities with curing the bed by manual labours and side by springkling for at least 28 days etc. complete as directed. (Proper arrangement for obtaining clean water should be made at site). | 1 | cum | 8,643 | ₹8,634.36 |
| 2.05 | Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed. | - | qntl | 13,127.94 | - |
| 2.06 | RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately). | - | cum | 10,093.6 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
bid.pdf
Tender Documents • 0.97 MB
BOQ_83125.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid