Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.9 LAccepted-AOC C O SHRI SUKHDEV SINGH VILL PIRAULI PO PIRAULI KISHANPUR DISTT MUZAFFARNAGAR | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | L1 | Accepted-AOC AS PER NIT. | |
| 2 | Rejected-Technical SHIVNANDANPUR BISHRAMPUR DISTT SURAJPUR CG | - | Rejected-Technical BEING L2 | |
| 3 | Rejected-Technical SHANTI NAGAR BISHRAMPUR DISTT SURAJPUR C G | - | Rejected-Technical BEING L3 |
Tender Value
₹27.4 L
EMD Value
₹34,300
Closing Date
20 Aug 2024, 5:00 pmClosed
GENERAL MANAGER Oprn.
GM OFFICE SECL BISHRAMPUR AREA.
Dismentling, Transportation, Installation and extension of 1000mm wide belt conveyor for 71L(W) district along 71L(W)from 2D to 43Dip total length 1270 mtr. (old 1000mm wide belt conveyor to be dismentling from 76L dist. of CMP3 length 840 mtrs.
2024_SECL_314755_1
GM/BSPR/GMO/Srvy/e-tender/ 2024-25/15 dt.09.08.24
Open Tender
Civil Works - Others
Item Rate
180 days
GAYATRI UG MINE OF SECL BISHRAMPUR AREA
AS PER NIT
3 documents required · 3 mandatory
₹34,300
14 Oct 2024
10 Aug 2024
22 Aug 2024
10 Aug 2024
20 Aug 2024
11 Aug 2024
10 Aug 2024 - 13 Aug 2024
Amount
Dismentling of 48mtr. Belt , 48 top rollers, 08 bottom rollers, 24mtrs. Belt structure including 16 channels ( 03 mtrs. each), 16 brackets and 08 stools.
Transportation of dismentled structure including 16 chanels (3mtrs. each), 16 brackets, 08 stools, 48 top rollers, 08 bottom rollers and 48 mtrs. belt upto track line, loading on trolleys and tubs, transporting to point nearest to installation site, unloading and transporting to place of installation(with extension)
Fitting of above material at new installation site.
Dismantling of Tail end including drum and frame i.e. complete set transporting up to track line, loading on trolleys, transporting to point nearest to installation site, unloading and transporting to place of installation and fitting.
Dismantling of discharge end including drum and frame i.e. complete set transporting up to track line, loading on trolleys, transporting to point nearest to installation site, unloading and transporting to place of installation and fitting.
Dismantling of gear box ,drive head (drive and driven drum), motor, support girders with structure complete set (76 to 110 KW , single drive)
Transportation of gear box , drive head (drive and driven drum), motor, support girders, track line, loading on trolleys, transporting in point nearest to installation with structure complete set (76 to 110 KW , single drive ) up to track line loading on trolleys, transporting to point nearest to installation site ,unloading and transporting to place of installation.
Fitting of gear box ,drive head (Drive and Driven drum ) motor, support girders with structure complete set (76 to 110 KW, single drive ) without grouting material .
Transportation of 150 top rollers from place of stacking up to track line ,loading in tubs and transporting to nearest point of installation, unloading and transporting to installation site.
Transportation of 30 bottom rollers from place of stacking up to track line ,loading in tubs and transporting to nearest point of installation, unloading and transporting to installation site.
Dismantling of Tail end drum, Hopper, Tail end frame manually and shifting up to 24 Mtr. i.e. 1 pillar and refitting at new location.
Loading of belt structure including 16 channels,16brackets and 08 stools on trolleys transporting to point nearest to installation site, unloading and transporting to place of installation.
Transporting of loop take up drum ,trolley ,tracks , winch and transporting up to track line loading on trolleys , transporting to point nearest to installation site , unloading and transporting to place of installation .
Fitting of loop take up drum, trolley , tracks and winch .
Site cleaning for installation of Drive Head.
Trench cutting In stone for Drive Head portion.
PCC work (1:2:4) for drive head, gear box , loop takeup, discharge drum , tail end drum installation .
Brick work in cement mortar (1:6) up to 1.5m above floor for swith plateform .
12 mm Cement Plaster ( Mortar 1:6) for swith plateform .
Loading the material in to tub
Unloading of material at destination in UG
Bricks: fly Ash Bricks
Sand : Coarse sand (zone III)
Portland cement (OPC-43 Grade)
Stone Aggregate (single size): 20 mm nominal size
Total impact of GST for the purpose of CTC
ASHUTOSH PANDEY
Rakesh Bahadur Singh
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .