| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹84.2 L+₹97,906.59 (1.18%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹85.8 L
EMD Value
₹1.7 L
Closing Date
20 Apr 2023, 4:30 pmClosed
Superintending Engineer
Office S.E. 15th circle irrigation work gonda
Constructing box culvert at Km. 11.000 of Chandaha drain Lot no. 03
2023_UPIDC_795861_3
05/S.E./2022-23
Open Tender
Civil Works
Item Wise
270 days
Gonda
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.7 L
Yes
20 Jun 2023
10 Apr 2023
20 Apr 2023
10 Apr 2023
20 Apr 2023
10 Apr 2023
Amount
Earth work in construction and remodeling of drains/escapes upto 1 Cumecs discharge including hard clay, charri bajri upto 5% lead upto 30 Meters, lift upto 1.5 Meters excluding\Mechanical compaction but inclusive partial dressing to profiles.
Earth work in excavation of foundation in all type of soil with all lead ,lift & proper disposal of earth and back filling etc. required for proper completion of the work.
Centering and Shuttering P.C.C. Work 1:2:4 ( M-15 ) in foundation including cost of all material, Labour and T&P etc. required for proper completion of the work.
Laying lean cement concrete P. C.C. 1:2:4 ( M-15 ) in foundation with 20-40 mm size Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
Centering and Shuttering for R. C.C. 1:1:2 ( A20 M-25 ) in raft, Wall and Slab including cost of all material, Labour and T&P etc. required for proper completion of the work.
Laying R. C.C. 1:1:2 ( A20 M-25 ) in raft, Wall and Slab with 4.75 to 20 mm size Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
1st class Brick work in 1:4 CM with Ist class bricks and coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
Laying R. C.C. in R. C.C. 1:1:2 ( A10 M-25 ) in wearing coat with 4.75 to 10 mm size crushed Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
Cutting, bending, binding and placing steel reinforcement including cost of binding wire and cost of steel, labour, T & P etc. required for proper completion of the work
S/F fillar board in expansion joint including cost of material, labour & T&P required for proper completion of work
S/F 75 mm Dia spout pipe
Supplying and Laying stone Boulder weight from (40 kg. To 60 kg) and minimum dimension 200 mm for apron in d/s & u/s beyond masonry and concrete floor within 30 m lead including cost of all T.& P., labour etc. required for proper completion of work
Earth work in making ramp in all type of soil including all lead & lift , manual compaction and dressing to profiles.
Boring with 15 cm casing pipe including lowering of assembly and extracting casing pipe with contractor T&P and equipments up to 10m avg with all cost.
Hiring diesel pump 5.0Hp I/C operator and P.O.L for running hrs with all maintenance.
M/S PRABHAT TRADERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .