Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 CrAccepted-AOC | ₹3.5 Cr Quoted ₹3.6 Cr | 1 | Accepted-AOC Accepted |
| 2 | 2₹3.8 Cr+₹15.5 L (4.25%)Rejected-Finance 136 52 MATHALANGULA ST THIUVANNAMALAI 606601 | TIRUVANNAMALAI | TAMIL NADU | 606601 | ₹3.8 Cr+₹15.5 L (4.25%) | 2 | Rejected-Finance L1 Lowest Tenderer can only be accepted. L2 is Rejected. |
| 3 | Rejected-Technical | - | - | Rejected-Technical Does not meet prequalification |
Tender Value
₹3.5 Cr
EMD Value
₹1.9 L
Closing Date
7 Feb 2026, 11:00 amClosed
Superintending Engineer H C and M
The Superintending Engineer Highways Department Construction Maintenance 214 Tindivanam Road Tiruvannamalai 606 601
Widening from Single Lane to Intermediate Lane and Strengthening of Thenkarambalur - Kottaiyur - Vazhavachanur road at Km 6/0 - 9/0 and link road Km 0/0-1/2- TVM-175
2026_HWAY_645316_1
TN No 73 2025 26 HDO Dt 19 01 2026 TVM 175
Open Tender
Civil Works - Highways
Percentage
120 days
Thandarampet
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹1.9 L
Yes
Tiruvannamalai
12 Mar 2026
22 Jan 2026
7 Feb 2026
22 Jan 2026
7 Feb 2026
23 Jan 2026
23 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Boxing including conveyance of sut earth away from the site with average lead | 3,979.07 | Cubic Metre | 131.89 | ₹5,24,799.54 |
| 2 | Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401- for grading- V Material (Filter / Separation Layer at Bottom) | 916.23 | Cubic Metre | 2,098.41 | ₹19,22,626.19 |
| 3 | Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401- for grading- III Material (Drainage Layer at Top) | 732.99 | Cubic Metre | 2,371.45 | ₹17,38,249.14 |
| 4 | Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 | 1,832.47 | Cubic Metre | 2,567.83 | ₹47,05,471.44 |
| 5 | Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5 | 7,329.87 | Square Metre | 88.33 | ₹6,47,447.42 |
| 6 | Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as as perClause 503 of MORTH Rev-5 | 7,329.87 | Square Metre | 20.67 | ₹1,51,508.41 |
| 7 | Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | 15,754.38 | Square Metre | 29.38 | ₹4,62,863.68 |
| 8 | Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | 20.13 | Square Metre | 23.41 | ₹471.24 |
| 9 | Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which shall consist of construction in a single course base/binder course confirming to the specfication on a previously prepared base, (using Mini Hot Mix Plant and Power Roller) including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTH Rev-5 (For Patch Works) | 60.7 | Cubic Metre | 9,226.23 | ₹5,60,032.16 |
| 10 | Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 Grade-II | 1,154.21 | Cubic Metre | 9,320.3 | ₹1,07,57,583.46 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_773356.xls
BOQ • 0.37 MB
Volume2Tvm175.pdf
Tender Documents • 1.45 MB
Volume1Tvm175.pdf
Tender Documents • 0.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .