Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-PreQual/Technical E 666 667 PRIM PAVALLION EKTA COMPLEX NAKUL PATH LAL KOTHI SCHEME JAIPUR JAIPUR RAJASTHAN 302015 | JAIPUR | RAJASTHAN | 302015 | Admitted-PreQual/Technical |
Tender Value
₹44.9 Cr
EMD Value
₹89.9 L
Closing Date
9 Feb 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER KPZ
JAIPUR NAGAR NIGAM PANDIT DEENDAYAL UPPADHYAY BHAWAN LALKOTHI TONK ROAD JAIPUR
Conservation and Development Works for Heritage Walled City Area and Monuments (Facade Restoration And Illumination for Bazars And Gates of Jaipur Walled City Package -1)
2025_DLB_519083_1
94 EXECUTIVE ENGINEER KPZ
Open Tender
Civil Works
Percentage
547 days
JAIPUR
As Per Bid Documents
3 documents required · 3 mandatory
₹23,600
ONLINE PAY IN JAIPURMC WEBSITE
₹89.9 L
Yes
JAIPUR
4 Mar 2026
9 Dec 2025
10 Feb 2026
11 Dec 2025
9 Feb 2026
20 Jan 2026
23 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (40.5) P & L Lime Surkhi Plaster lime surkhi mortar 1:2 (1 Lime : 2 Surkhi) including preparation of mortar by traditional practice (by grinding) in specified course for base coarse and subsequent course & Loi, tamping, beating, curing till the shrinkage cracks are disappear. The work is to be done with all lead as the work is of restoration nature as per Jaipur practice including adding gur, methi & gugal on old walls including removal of all old loose and decade plaster, each coat to be done after 3 days of previous coat. | - | - | - | - |
| 2 | (40.5.1) 33 mm thick in four coats | 26,223 | Sqm | 415 | ₹1,08,82,545 |
| 3 | (40.5.2) 45 mm thick in four coats | 7,952 | Sqm | 448.5 | ₹35,66,472 |
| 4 | (40.7) Making Mehrab's, Arches, pillars, highly decorative creepers, flower of small sizes etc.in lime Surkhi plaster (1:2) as per traditional practices (Arches, Mehrab's) in three coats for base course and subsequent course and Loi tamping, beating till the shrinkage cracks are disappear than making ornamental flowering/design etc. The work is to done with all leads and lifts as per work of restoration nature as per Jaipur practice. | 617 | Sqm | 883 | ₹5,44,811 |
| 5 | (40.8) Add extra over item no. 40.5 to 40.6 for Lime plaster work done over Spherical or groin ceiling/ladao ceiling of domes. | 678 | Sqm | 332 | ₹2,25,096 |
| 6 | (40.9) Add extra over item no. 40.5 to 40.6 for Lime plaster work done over flat ceiling 20% | 6,388 | Sqm | 83 | ₹5,30,204 |
| 7 | (40.1) Add extra over item no. 40.5 to 40.6 for Lime plaster work done over curved/circular masonry work (curved or circular surface.) | 361 | Sqm | 103.75 | ₹37,453.75 |
| 8 | (40.13) Flush and ruled pointing over joints of dressed stone cladding, chajjas, jali etc. including racking the joints as per traditional practice including all leads and lifts with grinded mortar of lime putty and surkhi mixed in 1:2 ratio and gur, methi, gugal etc. are to be mixed as per traditional practice. | 2,662 | Sqm | 214 | ₹5,69,668 |
| 9 | (40.15) Araish plaster (as per Jaipur practice) 1:2 ( 1 lime : 2 Zikki) on lime plaster or plane back ground including preparation of lime for 6 months by slaking of lime with curd and changing the water every week. The Kara plaster of not more than 6 mm thick is to be left the maximum of 3 months to appear the shrinkage & temperature cracks. Over the Kara plaster 2mm layer of grinded lime putty is to be done and is to be rubbed Gently by Akik stone. Then adding Khoppra & Ghee and inserting the design of colour boarder all round. | 144.6 | Sqm | 3,485 | ₹5,03,931 |
| 10 | (40.16) Coloured plain Araish work 1:2 (1 lime : 2 zikki) on lime plaster or plane back ground including preparation of lime for 6 months by slaking of lime with curd and changing the water every week. The Kara plaster of not more than 6mm thick is to be left the maximum of 3 months to appear the shrinkage & temperature cracks. Over the Kara plaster 2mm layer of grinded lime putty is to be done and is to be rubbed Gently by Akik stone. Then adding Khoppra & Ghee and inserting the design of colour boarder all round including desired colour stone pigment to match the existing colour | 23 | Sqm | 3,845 | ₹88,435 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 0.17 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.26 MB
EPROC94XENKPZ_compressed.pdf
Tender Documents • 26.35 MB
BOQ_926184.xls
BOQ • 0.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .