Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹20.3 LAccepted-AOC | ₹20.3 L Quoted ₹15.0 L | 1 | Accepted-AOC ok |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹16.4 L
EMD Value
₹16,450
Closing Date
20 Sept 2023, 3:00 pmClosed
Executive Officer
6/A, Abdl Kuthus Street, Polur
Construction of Compound Wall in MRM Head Works and Providing CC Road in Vasur Head Works inside area
2023_DTP_369716_1
820/2023/HC
Open Tender
Civil Works
100 days
Polur Town Panchayat
IInd Class
4 documents required · 4 mandatory
₹0
₹16,450
Yes
1 Jun 2024
14 Sept 2023
21 Sept 2023
14 Sept 2023
20 Sept 2023
14 Sept 2023
Amount
Earth Work Excavation and depositing on bank with initial lead and lift as per SS 20 B etc. complete as per standard specification.
Collection and Supply of Stone dust, including cost and conveyance of materials and labour charges for Stone dust filling etc., complete as per standard specification.
Plain Cement Concerete 1:4:8 mix using 40mm ISS HBG Metal including cost and conveyance of all materials and labour charges etc., complete as per standard specification.
Supply and Fabrication of steel including cost and conveance of all materials and labour charges etc., as per standard specification.
Centering and Shuttering for all items of R.C.C works includings labour charges etc., complete as per standard specification.
RCC 1:1.5:3 mix using 20mm ISS HBG Metal including cost and conveyance of all materials and labour charges etc., as per standard specification.
Brick Work in Cement Mortor 1:5 Mix (one cement, five M Sand ) using new best country Bricks of size 8 ¾” x 4 ¼” x 2 ¾” from approved quarry including cost and conveyance of all materials to site. loading and unloading charges and labour charges for mixing, laying and curing etc. complete. complying with std. specifications.
Plastering with cement mortor 1:5 to 12mm thick including cost and conveyance of all materials and all other labour charges etc., complete as per standard specifications.
Supply and fixing of grill gate including all material with labour charges and completed as per standard specification etc.,.
Painting the new walls two coats over one coat of priming with best Cement paint of approved colour and quality including preparation of surface and finishing neatly etc., complete complying with standard specification and as directed by the department officers (S.l.No.359-A)
Painting the new iron works, in all floors,two coats of best synthetic enamel paint of approved quality, colour and brand (to be approved by executive engineer before use on works) over one coat of primer including scrapping and preparation of surface, cost of brushes, high scaffolding charges, neat finishing, complying with standard specification and as directed by the departmental officers-10 m2(s.l.No.341-A)
Beutification for natural Art Painting over the New painting walls including all paint accessories with artiest charges and complete as per the standard specification
PCC 1:2:4 mix using 20mm ISS HBG Metal including cost and conveyance of all materials and labour charges etc., as per standard specification.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid