Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.0 LAccepted-Finance 34A 117 A4 SHASTRI NAGAR SALAEM CAMP METTUR DAM 636456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | 1 | Accepted-Finance Satisfied |
Tender Value
Refer Docs
EMD Value
₹3,900
Closing Date
16 May 2023, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit I Reconditioning of Saw tooth expansion joints in FG ducts near chimney area Strengthening of ESP internal structures ESP Hoppers ID fan outlet flue gas duct deflector plates Cutting and removal of the eroded portion
2023_EB_313437_1
SE / M-I / MTPS-I / BM / OT.112 /2023-24
Open Tender
Power/Energy Projects/Products
Works
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹3,900
Yes
19 May 2023
10 May 2023
17 May 2023
10 May 2023
16 May 2023
10 May 2023
Amount
Charges for renewal / Reconditioning of expansion joints of style 01 / style 02 (Size 6100 x 3600 chimney before and after ESP duct including drawal of materials and devolution of scrap at Central stores.(Saw tooth expansion joints in FG ducts near chimney area)
Charges for cutting and removing the eroded portions of supporting Structures in the screen plate areas, fabrication & erection of new supporting structures, strengthening of the damaged portion in the ESP inlet side by welding and other related works in both ‘AB’ and ‘CD’ pass.
Labour charges for welding eroded initial welding joints in the flue gas duct above 2 metre. (Strengthening of ESP Hopper)
Charges for leading the new deflector to Boiler area (After ID fan outlet to chimney), leading, lifting to Boiler Flue gas ducts. Fixing and welding guide angle in the duct and to the correct contour. Placing the deflector plate in the guide angle and welding the same.(MS 6mm plate will be supplied by TANGEDCO)
Charges for leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work.
Cutting gas
Welding Rod
Consumable Charges for S.No.1 to 5
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .