| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹309.7 CrAccepted-AOC HEAD OFFICE 8TH FLOOR EXPRESS CORPORATE PARK SECTOR 16A FILM CITY NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | L1 | Accepted-AOC As per approval of competent authority | |
| 2 | L2₹297.4 Cr+₹1.7 Cr (0.58%)Rejected-Finance 20 IT PARK | L2 | Rejected-Finance Due to Quoting Higher rate than L1 | |
| 3 | L3₹299.9 Cr+₹4.2 Cr (1.43%)Rejected-Finance RG METRO ARCADE SECTOR 11 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | L3 | Rejected-Finance Due to Quoting Higher rate than L1 | |
| 4 | L4₹305.7 Cr+₹10.0 Cr (3.40%)Rejected-Finance GROUND FLOOR KALAIGNAR CENTENARY BUILDING HIGHWAYS RESEARCH CENTRE CAMPUS 76 SARDAR PATEL ROAD GUINDY CHENNAI 600 025 | CHENNAI | GUINDY | TAMIL NADU | 600025 | L4 | Rejected-Finance Due to Quoting Higher rate than L1 | |
| 5 | L5₹308.6 Cr+₹12.9 Cr (4.37%)Rejected-Finance | L5 | Rejected-Finance Due to Quoting Higher rate than L1 |
Tender Value
₹238.1 Cr
EMD Value
₹2.4 Cr
Closing Date
8 Jun 2023, 2:00 pmClosed
Superintending Engineer
Superintending Engineer Circle office UP jal Nigam Rural near TV Tower Ashok Nagar Prayagraj
I D of 7 drains and augmentation of rajapur STP capacity by 90 MLD
2023_UPJNG_791904_1
44/E tender/10 dt 29.03.2023
Open Tender
Civil Works - Others
Item Rate
450 days
Prayagraj
As per bid document
3 documents required · 3 mandatory
₹0
₹2.4 Cr
Prayagraj
29 Aug 2024
1 Apr 2023
8 Jun 2023
1 Apr 2023
8 Jun 2023
1 Apr 2023
12 Apr 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Construction of 90 MLD STP at Rajapur and its appurtenant work | - | - | - | - | - |
| 2 | Survey, Investigation, Design, drawing and construction of 90 MLD STP along with 20 KLD Fecal Sludge co-treatment Facility and appurtenant structures and allied work at existing Rajapur STP campus, Prayagraj city with appropriate and cost effective technology on sustainable & proven technology to deliver that treated effluent shall comply with the NGT directed discharge standards (April 2019). The work includes all civil structure and supply & erection of electro- mechanical equipments, instrumentation control works i.e transformer, DG set of suitable capacity with necessary accessaries, HT/LT panel with cable joiting material, earthing, suitable capacity non-clog submersible pumps (MOC- casing -2% NiCr, Impeller-ASTM CF8M, Shaft & Shaft sleeve- ASTM SS 410) capable of pumping 100mm particle with necessary accessaries such as motor, gate, valve, manual / mechanical screen,grit mechanism, blower , Electro-magnetic flowmeter cum totalizer having characteristics/ MOC Liner : polyurethane or Hand Rubber / Electric MOC : SS316L/ Housing : Die Cast Aluminium or CS/ Power Supply : 90-230 V AC / Output: 4 - 20 mA with HART/ Sensor Cable : 10 mt / Flow Tube or Sensor housing protection IP68/ Process Flange : SS316/Display:31/2 LCD Display/ Cable Connection: 1/2" NPT /Accuracy: 0.5% etc. for the proposed STP including power connection from the meter room of UPPCL, all required buildings including office cum laboratary building , campus roads, water supply system , sewerage & drainage system, guard room, rain water harvesting works, external & internal electrification including lighting arrangement , boundary wall, site development, plantation, PLC and SCADA with display screen in appropiate size, stand by power arrangement etc complete. | 1 | job | - | - | 18% |
| 3 | Operation & Maintenance of all civil and E&M works of 90 MLD STP along with 20 kld co-treatment facility at Rajapur, effluent gravity line, associate infrastructure and allied work for 15 years (excluding cost of power).
Note :-
1. In column no. 16 indicative flow and in column no. 17 Net Present Value (NPV) factor is mentioned infront of relative year.
2. Bidder has to quote the price for related year, its present value will be calculated based on NPV factor and NPV will be used for evaluation purpose only and quoted price will be used for Bid contract value.
3. Threshold flow is 65 MLD | - | - | - | - | - |
| 4 | 1st Year | - | - | - | - | - |
| 5 | Manpower | 1 | year | - | - | 18% |
| 6 | Repair and maintenance | 1 | year | - | - | 18% |
| 7 | Chemical | 1 | year | - | - | 18% |
| 8 | Additional O&M Price for treatment of additional sewage in excess of the Threshold on a per MLD basis (Amount Per MLD) | 1 | MLD | - | - | 18% |
| 9 | 2nd Year | - | - | - | - | - |
| 10 | Manpower | 1 | year | - | - | 18% |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1320007.xls
BOQ Document • 0.51 MB
118165102.pdf
Tender Document • 3.28 MB
Vol1.pdf
Tender Document • 5.06 MB
Vol2.pdf
Tender Document • 6.20 MB
118165104.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .